SALIENT FEATURES<br />

S.No. Description Details<br />

1 Name of Project Khapri M. I. Tank<br />

2 Location Khapri Village<br />

3 Basin Godavari<br />

4 Sub-Basin Wainganga<br />

5 Name of River/ Nala Local Nalla<br />

6 Catchment Area (sq.km.) 6.55 Sq. Km<br />

7 Type [ Major / Medium / Minor / Minor (LS)] Minor<br />

8 Year of completion 1973<br />

9 Type of dam Earthen Dam<br />

10 Gross storage (Mm 3 ) 2.19 Mm 3<br />

11 Live storage (Mm 3 ) 2.11 Mm 3<br />

12 Dead storage (Mm 3 ) 0.08 Mm 3<br />

13 Submergence area 74.00 ha<br />

14 Forest area in the submergence<br />

15 75% dependable flow at site (Mm 3 )<br />

16 50% dependable flow at site (Mm 3 ) 2.784 Mm 3<br />

17 TBL (m) 110.000 m<br />

18 MWL (m) 109.500 m<br />

19 FRL (m) 108.300 m<br />

20 Spillway Crest Level (m) 108.300 m<br />

21 MDDL (m) 103.000 m<br />

22 Length of embankment (m) 1045.00 m<br />

23 Maximum dam height (m) 11.15 m<br />

24 Spillway details Flush Bar<br />

i) Length (m) 40 m<br />

ii) Number of Gates & Size<br />

25 Design flood (m 3 /sec) 79.47 m 3 /sec.<br />

26 Sill level of head regulator/s (m) 102.78 m<br />

27 Length of LBC (km)<br />

28 Length of RBC (km) 5.50 Km<br />

29 Capacity of LBC (m 3 /sec)<br />

30 Capacity of RBC (m 3 /sec) 0.44 m 3 /sec.<br />

31 GCA (ha) 7.07 ha<br />

32 CCA (ha) 566 ha<br />

33 A ICA (ha) 433 ha<br />

33 B i) Number of Water User Associations (WUA) Nos. One<br />

Annexure-I<br />

Prescribed Unit Water Use Entitlement for Flow Irrigation in Rabi Season in a Normal Year.<br />

( Taluka :- Umred & District :- Nagpur )<br />

ii) W.U.A. wise delineated Area in ha.<br />

433 ha<br />

Entitlement-Format-Mokashi.xls <strong>KHAPRI</strong> 1 11:11 AM2/26/2009


S.No. Description Details<br />

34 Cropping Intencity % with Cropwise details<br />

i) Kharif 45.00%<br />

ii) Two Seasonal<br />

iii) Rabi 45.00%<br />

iv) Hot Weather<br />

v) Perennial<br />

35 A Approved Cost (Rs.in lakh) 13.026 Lakh<br />

35 B Completion Cost (Rs.in lakh)<br />

36 Approved Utilisation (Mm 3 )<br />

(a) For Irrigation<br />

i) Kharif 0.27 Mm 3<br />

ii) Two Seasonal<br />

iii) Rabi 2.046 Mm 3<br />

iv) Hot Weather<br />

v) Perennial<br />

(b) For Non- Irrigation<br />

i) Kharif<br />

ii) Rabi<br />

iii) Hot Weather<br />

37 Non- Irrigation approved (Mm 3 ) with breakup<br />

i) Kharif<br />

ii) Rabi<br />

iii) Hot Weather<br />

38 Non-Irrigation Actual (Mm 3 )<br />

i) Kharif<br />

ii) Rabi<br />

iii) Hot Weather<br />

39 (a) Seasonwise Evaporation Loss (Mm 3 )<br />

i) Kharif 0.104 Mm 3<br />

ii) Fair weather 0.411 Mm 3<br />

iii) Total Annual 0.515 Mm 3<br />

39 (b) Post monsoon inflow (dry weather) (Mm 3 )<br />

i) Project report<br />

ii) Actual<br />

Entitlement-Format-Mokashi.xls <strong>KHAPRI</strong> 2 11:11 AM2/26/2009


S.No. Description Details<br />

40 Reduction in the Reservoir due to Siltation in Mm 3<br />

i) Actual as per survey<br />

ii) or as per formula (3Ha. Metre/100 Sq.Km./Year) 0.06877 Mm 3<br />

41 Any other commitment<br />

i) Kharif<br />

ii) Rabi<br />

iii) Hot Weather<br />

42 Reservoir Lift<br />

Case (A) Where canal takes of directly from the<br />

reservaoir<br />

(a) Flow Lift<br />

i) Maximum Permissible Area 6% of CCA (ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance 3.6% of<br />

iii)<br />

water available at canal head (Mm 3 )<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 3.60 X water@canal head in Mm 3<br />

i 100<br />

(b) Pressurised Lift (Drip / Sprinkler)<br />

i) Maximum Permissible Area14% of CCA(ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance 5.65% of<br />

iii)<br />

water available @ canal head (Mm 3 )<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 5.65 X water@canal head in Mm 3<br />

i 100<br />

(c) Canal Lift (Outside command)<br />

Maximum Permissible 10% (CCA -perennial area)<br />

i)<br />

(ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance for @ 7% of<br />

iii)<br />

water available at canal head (Mm 3 )<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 7.00 X water@canal head in Mm 3<br />

i 100<br />

Case (B) Where canal takes off from the D/S -<br />

43<br />

pickup weir<br />

(a) Lift from dam storage<br />

i) Maximum Permissible area 1% of CCA (ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance 0.6% of<br />

iii)<br />

water available at canal head (Mm 3 )<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 0.60 X water@canal head in Mm 3<br />

i 100<br />

Entitlement-Format-Mokashi.xls <strong>KHAPRI</strong> 3 11:11 AM2/26/2009


S.No. Description Details<br />

(b) Pressurised Lift (Drip / Sprinkler)<br />

i) Maximum Permissible Area14% of CCA (ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance 5.65% of<br />

iii)<br />

water available @ canal head (Mm 3 )<br />

iv) Actual water allowance<br />

= ii X 5.65 X water@canal head in Mm 3<br />

i 100<br />

(c) lift for river portion between Dam to pickup weir<br />

i) Maximum Permissible Area 5% of CCA (ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance 3% of water<br />

iii)<br />

available @ canal head (Mm 3 )<br />

iv) Actual water allowance<br />

= ii X 3.00 X water@canal head in Mm 3<br />

i 100<br />

Deduction for transit loss in the river portion in<br />

(d)<br />

fair weather<br />

= 10% of water @ canal head<br />

Deduction of water quantity for non-irrigation use<br />

(e)<br />

in between river portion<br />

(f) Canal Lift (Outside command)<br />

Maximum Permissible 10% of [ CCA - Perennial<br />

i)<br />

area] (ha)<br />

ii) Actual sanctioned area (ha)<br />

iii)<br />

Maximum Allowable water allowance for 10% area<br />

@ 7% of water available at canal head (Mm 3 )<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 7.00 X water@canal head in Mm 3<br />

i 100<br />

44 Water available calculation<br />

i) water utilisation as per project report in Mm 3 2.316 Mm 3<br />

ii) deduct water utilisation for use in kharif Mm 3 0.27 Mm 3<br />

water available at the beginning of Rabi season in<br />

iii)<br />

Mm 3 2.046 Mm 3<br />

45 To get water available @ canal head Deductions<br />

i) Deduct 39 (ii or iii) Mm 3 0.411 Mm 3<br />

ii) Add 39 (b) Mm 3<br />

iii) Deduct for siltation<br />

0.06877 Mm 3<br />

deduct (40)(i) or (ii) as the case may be<br />

iv) deduct for non-irrigation use 38 (ii + iii)<br />

v) deduct (41)(ii + iii)<br />

vi) Water available at canal head in Mm 3 1.5662 Mm 3<br />

Entitlement-Format-Mokashi.xls <strong>KHAPRI</strong> 4 11:11 AM2/26/2009


S.No. Description Details<br />

46 Deduction from (45)(vi)<br />

Case (A) Where canal takes off directly from<br />

reservoir<br />

i) 42(a)(iv) in Mm 3<br />

ii) 42(b)(iv) in Mm 3<br />

iii) 42(c)(iv) in Mm 3<br />

iv) Net water available at canal head in Mm 3 1.5662 X 0.8 = 1.5229 Mm 3<br />

Case (B) Where canal takes off from the D/S side<br />

47<br />

pickup weir<br />

Deductions from (45)(vi)<br />

i) 43(a)(iv)<br />

ii) 43(b)(iv)<br />

iii) 43(c)(iv)<br />

iv) 43(d)<br />

v) 43(e)<br />

vi) 43(f)(iv)<br />

vii) Net water available at canal head in Mm 3<br />

48 Net area for sanctioning unit water entitlement<br />

Case (A) Deduction of Areas<br />

i) 42 (a) (ii) in ha<br />

ii) 42 (b) (ii) in ha<br />

iii) 42 (c) (ii) in ha<br />

iv) deduct from project C.C.A.- 48 [(i)+(ii)+(iii)]<br />

Net Area available in ha<br />

Prescribed unit water use entitlement per ha of<br />

49<br />

net C.C.A.<br />

= 46(iv) Mm 3 /ha<br />

48(iv)<br />

50 Case (B) Deduction of Areas<br />

i) 43(a)(ii)<br />

ii) 43(b)(ii)<br />

iii) 43(c)(ii)<br />

iv) 43(f)(ii)<br />

v) deduct from project C.C.A.- 50 [(i)+(ii)+(iii)+(iv)]<br />

Net Area available in ha<br />

Prescribed unit water use entitlement per ha of<br />

51<br />

net C.C.A.<br />

= 47(vii) Mm 3 /ha<br />

50(v)<br />

566 ha<br />

566 ha<br />

1.2529 / 566 = 0.002213 Mm 3 /ha<br />