10.07.2015 Views

S.No. Description Data 1 Name of Project Mozari M.I.Tank 2 ...

S.No. Description Data 1 Name of Project Mozari M.I.Tank 2 ...

S.No. Description Data 1 Name of Project Mozari M.I.Tank 2 ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHECK LIST OF ENTITLEMENT (REVISED-2009)S.<strong>No</strong>. <strong>Description</strong> <strong>Data</strong>1 <strong>Name</strong> <strong>of</strong> <strong>Project</strong> <strong>Mozari</strong> M.I.<strong>Tank</strong>2 Location Near Village <strong>Mozari</strong>3 Basin Tapi4 Sub-Basin Purna5 <strong>Name</strong> <strong>of</strong> River/Nala Local Nalla6(a) Catchment Area(Sq.Km) 32.78 Sq. km.6(b) Intercepted Chatchment Area(Sq.Km)6(c) Free Chatchment area(exculding the c.A.<strong>of</strong> all U/SStorages)7 Type[Major/Medium/Minor/minors(LS)] Minor8 Year <strong>of</strong> completion 19789 Type <strong>of</strong> dam Earthern10 Gross storages(Mm 3 ) 3.2611 Live storages(Mm 3 ) 2.9312 Dead storages(Mm 3 ) 0.3313 75% dependable flow at site (Mm 3 ) 014 50% dependable flow at site (Mm 3 ) 3.55515 TBL(m) 95.716 FRL(m) 91.717 MWL(m) 94.218 Spilway Crest Level (m) 91.719 MDDL(m) 85.520 Maximum dam hight (m) 16.49 m21 Sill level <strong>of</strong> head regulator/s(m) 85.522 Length <strong>of</strong> LBC (m) 11.523 Length <strong>of</strong> RBC (m) -24 Capacity <strong>of</strong> LBC (m 3 /sec) 0.3325 Capacity <strong>of</strong> RBC (m 3 /sec) -26 GCA(ha) 75327 CCA(ha) 67528 ICA(ha) 54529(a) Number <strong>of</strong> Water User Associations (WUA)<strong>No</strong>s.One29(b) W.U.A.wise delineated Area in ha; W.U.A. wisenumber <strong>of</strong> members 583.429(c) <strong>No</strong>. <strong>of</strong> W.U.A.s considered for entitlement with area<strong>of</strong> each W.U,A30 Cropping intensity % with Cropwise details as perproject report.i) Kharif 25ii) Two Seasonal 20iii) Rabi 60iv) Hot Weather 0v) Perennial 031 Approved Utilisation (for Irrigation) (Mm 3 ) as perproject report.i) Kharif 0.74ii) Two Seasonal -iii) Rabi 1.88iv) Hot Weather 0v) Perennial 032 <strong>No</strong>n-Irrigation approved (Mm 3 ) with breakup as perproject reporti) Kharif 0ii) Rabi 0


iii) Hot Weather 033 <strong>No</strong>n-Irrigation actual (Mm 3 )i) Kharif 0ii) Rabi 0iii) Hot Weather 034 Seasonwise Evaporation Loss (Mm 3 )i) Kharif 0ii) Fair Weather 0.725iii) Total Annual 0.72535 Post Mansoon inflow(dry weather (Mm 3 )i) <strong>Project</strong> report 0ii) Actual as per observation (preferred) 036 Reduction in the Reservoir due to Siltation in Mm 3i) Actual as per survey <strong>No</strong>t Surveyedii) or as per formula (considering free catchment"6c")0.304937 Any other commitment (2nd classirrigation,Malguzari rigths,Nastar rights etc, if any)0i) Kharif 0ii) Rabi 0iii) Hot Weather 038 Wather available calculation@canal head.i) water utilisation as per project report in Mm 3 2.93 Live Storageii) deduct water utilisation for use in khrif Mm 3iii)(31i+33i+34i+37i) 0.74water available at the begining <strong>of</strong> Rabi (38i-38ii)Mm 3 2.1939 Deductions to get water available at the canal headi) Deduct 34ii on 34iii as per utilisation porposed 0.725ii) Deduction for "Siltation (36i or ii) 0.3049iii) Deduction for fair weather non irrigation use (33ii orboth 33ii+33iii) 0iv) Deduction for any other commitment 37(ii +iii) 0v) Water available at canal head before reservoir lift(38iii + 35ii-39(i+ii+iii+iv) 1.160140 Decutions for Reservoir liftReservoir LiftCase(A) where canal takes <strong>of</strong> directly from thereservaoir(a) Flow Lifti) Maximum Permissible Area 6% <strong>of</strong> CCA (ha) 40.5ii) Actual sanctioned area(ha) 5.6iii) Maximum Allowable water allowance 3.6% <strong>of</strong> wateravailable at canal head (Mm 3 ) i.e.39(v) 0.0418iv) Actual water allowance for sanctioned area 0.0058v) =ii x 3.6 x water @canal head (39v)i 100(b) Pressurised Lift (drip/sprinkler)i) Maximum Premissiable Area 14% <strong>of</strong> CCa (ha) -ii) Actual sanctioned area (ha) 0iii) Maximum allowable water allowance 5.65% <strong>of</strong>water available at canal head (39v) (Mm 3 ) i.e.39(v)N.A.iv) Actual water allowance for sanctioned area N.A.


=ii x 5.65 x water @canal head (39v) Mm 3N.A.i 100(c) Canal Lift (Outside command)i) Maximum Premissiable 10% (CCA-perennial area)(ha) -ii) Actual sanctioned area(ha) 0iii) Maximum Allowable water allowance for @ 7% <strong>of</strong>water available at cvanal head (39v) (Mm 3 )N.A.iv) Actual water allowance for sanctioned area N.A.=ii x 7 x water @canal head (39v) Mm 3i 10041 Case(B) Where canal takes <strong>of</strong>f form the D/S <strong>of</strong>pickup weir(a) Lift from dam storagei) Maximum Permissible area 1% <strong>of</strong> CCA (ha)ii) Actual sancationed area(ha)iii) Maximum Allowable water allowance 0.6% <strong>of</strong> wateravailable at canal head (39v) (Mm 3 )iv) Actual water allowance for sanctioned area=ii x 0.6 x water @canal head (39v) Mm 3i 100(b) Pressurised Lift (drip/Sprinkler)i) Maximum Permissible area 14% <strong>of</strong> CCA (ha)ii) Actual sancationed area(ha)iii) Maximum Allowable water allowance 5.65% <strong>of</strong>water available at canal head (39v) (Mm 3 )iv) Actual water allowance=ii x 5.65 x water @canal head (39v) Mm 3i 100(c) Lift on river portion between Dam to pickup weiri) Maximum Permissible area 5% <strong>of</strong> CCA (ha)ii) Actual sancationed area(ha)iii) Maximum Allowable water allowance 3% <strong>of</strong> wateravailable at canal head (39v) (Mm 3 )iv) Actual water allowance=ii x 3 x water @canal head (39v) Mm 3i 100d) Deduction for transit loss in the river portion in fairweather= 10% <strong>of</strong> water @ canal head(e) Deduction <strong>of</strong> water quantity for non-irrigation use inbetween the river portion (Between dam to pick upweir)(f) Canal Lift (Outside command)i) Maximum Permissible area 10% <strong>of</strong> [CCA -Perennial area ] (ha)ii) Actual sancationed area(ha)iii) Maximum Allowable water allowance 10% area @7% <strong>of</strong> water available at canal head (39v) (Mm 3 )iv) Actual water allowance=ii x 7 x water @canal head (39v) Mm 3i 10042 Net water available at canal head Mm 3A Case A (39v)-40(aiv+biv+civ) 1.154B Case B (39v)-41(aiv+biv+civ+d+e+fiv)


43 Net water available at canal head considering canallosses (Item <strong>No</strong> 42 x 0.80 or 0.90) Mm 3 0.9235Net water available for UWA = 42AX conveyanceefficiency OR 42BX conveyance effciency44 Prescribed unit water use entitlement per ha <strong>of</strong>C.C.ACase A (43 / 27 )Mm 3 / ha.Case B (43 / 27 )Mm 3 / ha.0.001380Mm 3 /hai.e. 1380 Cum/haDelta 13.80 cmNB :- 6(b) intercepted Catchment Area incluses all storages and weirs in the catchment area the project.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!