DONGARGAON MINOR IRRIGATION PROJECT

DONGARGAON MINOR IRRIGATION PROJECT

DONGARGAON MINOR IRRIGATION PROJECT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>DONGARGAON</strong> <strong>MINOR</strong> <strong>IRRIGATION</strong> <strong>PROJECT</strong>(Taluka :- Seloo, Dist.:- Wardha)ANNEXURE - IIPrescribed Unit Water Use Entitlement for Rabi season in a Normal year.S.No. Description Quantity Unit1 Utilisation for Rabi and H.W.Season.Total utilisation (planned) 5.229 Mm 3Deduct planned utilisation in Kharif 1.24 Mm 3Net for Rabi and H.W.Seasons. 3.989 Mm 32 Deduct from (1)i) Reduction in the live storage due to siltation. 0.185 Mm 3ii) Carry over Mm 3iii) Net losses from reservoir (considering post monsoon flow),evaporation losses as per project report. 1.015 Mm 3iv) Net river losses in case of storage cum pick-up weir scheme(Not applicable in this case) Mm 3v) Non-irrigation requirement from reservoir as per Schedule I Mm 3vi) Non-irrigation requirement from canal system Mm 3vii) Water allocation for bulk consumers (Block) Mm 3Total deductions 1.200 Mm 33 Water available for irrigation at the canal head for Rabi. i.e.(1-2) 2.789 Mm 34 Deduct from (3)i) Water Allocation for lift and pressurized irrigation scheme onreservoir.Actual Water Allocation0.00 Mm3(b) Drip-Actual Water AllocationMm3Total Water in Mm3 0.00000 Mm 3ii) Water allocation at canal head for lift & pressurized irrigationon canal system 10% of non perennial area (C.C.A.- Perennialarea) (15152 – 2330) area1282 ha & 7% of water usewater allowanceiii) Water Allocation for lift and pressurized irrigation schemeson river between dam and pickup weir (for K.T.Weirs)0.0000 Mm3Water in Mm3 0 Mm 3Total deduction. 0.000 Mm 35 Net water available 2.789 Mm 36 Net water available for flow irrigation at head of WUA forRabi (2.789X0.8) 2.231 Mm 37 Season wise allocation of net water available for flowirrigation Mm 3Rabi 65 %Rabi (allocation of net water) 1.450 Mm 3H.W. 35 %H.W.(allocation of net water) 0.781 Mm 3Entitlement-UK-Web20 Dongargaon-uk-07-08


S.No. Description Quantity Unit8 Net CCA for flow irrigation for RabiRabiTotal CCADeductCCA for reservoir liftPerennial areaCanal lift.Total deductionNet CCA for RabiNet CCA for H.W9 Prescribed unit water use Entitlement per ha. area of netCCA for RabiFor Hot Weather608.16 ha0.00 ha0 ha0 ha0ha608.16 ha608.16 ha0.00238 Mm 3 / ha0.00128 Mm 3 / haEntitlement-UK-Web20 Dongargaon-uk-07-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!