<strong>PARDESHWADI</strong> <strong>MINOR</strong> <strong>IRRIGATION</strong> <strong>TANK</strong><br />
SALIENT FEATURES<br />
S.No. Description Details<br />
1 Name of Project Pardeshwadi Minor Tank<br />
2 Location Lattitude 19 48' 00" ; Longitude 76 12' 00"<br />
3 Basin Godavari<br />
4 Sub-Basin Godavari<br />
5 Name of River/ Nala Nagzari River<br />
6 Catchment Area (sq.km.) 16.78 Sq. Km<br />
7 Type [ Major / Medium / Minor / Minor (LS)] Minor<br />
8 Year of completion 1978<br />
9 Type of dam Earthen Dam with F.O.F. weir<br />
10 Gross storage (Mm 3 ) 2.193 Mm 3<br />
11 Live storage (Mm 3 ) 2.004 Mm 3<br />
12 Dead storage (Mm 3 ) 0.189 Mm 3<br />
13 Submergence area 110 ha<br />
14 Forest area in the submergence Nil<br />
15 75% dependable flow at site (Mm 3 ) 1.20 Mm 3<br />
16 50% dependable flow at site (Mm 3 ) 1.80 Mm 3<br />
17 TBL (m) 515.00 m<br />
18 MWL (m) 513.50 m<br />
19 FRL (m) 512.15 m<br />
20 Spillway Crest Level (m) 512.15 m<br />
21 MDDL (m) 508.80 m<br />
22 Length of embankment (m) 2700.00 m<br />
23 Maximum dam height (m) 10.50 m<br />
24 Spillway details<br />
i) Length (m) 113 m<br />
ii) Number of Gates & Size<br />
Ungated<br />
25 Design flood (m 3 /sec) 323.20 m 3 /sec.<br />
26 Sill level of head regulator/s (m) 508.50 m<br />
27 Length of LBC (km) No LBC<br />
28 Length of RBC (km) 3160 Km<br />
29 Capacity of LBC (m 3 /sec) N.A.<br />
30 Capacity of RBC (m 3 /sec) 0.198 Cumecs<br />
31 GCA (ha) 535 ha<br />
32 CCA (ha) 530 ha<br />
33 A ICA (ha) 320 ha<br />
33 B i) Number of Water User Associations (WUA) Nos. One<br />
Annexure-I<br />
Prescribed Unit Water Use Entitlement for Flow Irrigation in Rabi Season in a Normal Year.<br />
( Taluka :- Gangapur & District :- Aurangabad )<br />
ii) W.U.A. wise delineated Area in ha.<br />
320 ha<br />
Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 1 12:11 PM2/26/2009
S.No. Description Details<br />
34 Cropping Intencity % with Cropwise details<br />
i) Kharif 5.00%<br />
ii) Two Seasonal 15.00%<br />
iii) Rabi 80.00%<br />
iv) Hot Weather<br />
v) Perennial<br />
35 A Approved Cost (Rs.in lakh) 19.00 Lakh<br />
35 B Completion Cost (Rs.in lakh) 19.10 Lakh<br />
36 Approved Utilisation (Mm 3 ) 2.004 Mm 3<br />
(a) For Irrigation 2.004 Mm 3<br />
i) Kharif 0.071 Mm 3<br />
ii) Two Seasonal 0.171 Mm 3<br />
iii) Rabi 1.438 Mm 3<br />
iv) Hot Weather<br />
v) Perennial<br />
(b) For Non- Irrigation<br />
i) Kharif<br />
ii) Rabi<br />
iii) Hot Weather<br />
37 Non- Irrigation approved (Mm 3 ) with breakup<br />
i) Kharif<br />
ii) Rabi<br />
iii) Hot Weather<br />
38 Non-Irrigation Actual (Mm 3 )<br />
i) Kharif<br />
ii) Rabi<br />
iii) Hot Weather<br />
39 (a) Seasonwise Evaporation Loss (Mm 3 )<br />
i) Kharif<br />
ii) Fair weather 0.469 Mm 3<br />
iii) Total Annual<br />
39 (b) Post monsoon inflow (dry weather) (Mm 3 )<br />
i) Project report<br />
ii) Actual<br />
Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 2 12:11 PM2/26/2009
S.No. Description Details<br />
40 Reduction in the Reservoir due to Siltation in Mm 3<br />
i) Actual as per survey<br />
ii) or as per formula 0.189 Mm 3<br />
41 Any other commitment<br />
i) Kharif<br />
ii) Rabi<br />
iii) Hot Weather<br />
42 Reservoir Lift<br />
Case (A) Where canal takes of directly from the<br />
reservaoir<br />
(a) Flow Lift<br />
i) Maximum Permissible Area 6% of CCA (ha) 32 ha<br />
ii) Actual sanctioned area (ha)<br />
3 ha<br />
Maximum Allowable water allowance 3.6% of<br />
iii)<br />
water available at canal head (Mm 3 0.04845 Mm 3<br />
)<br />
iv) Actual water allowance for sanctioned area<br />
= ii X 3.60 X water@canal head in Mm 3<br />
0.004542 Mm 3<br />
i 100<br />
(b) Pressurised Lift (Drip / Sprinkler)<br />
i) Maximum Permissible Area14% of CCA(ha)<br />
ii) Actual sanctioned area (ha)<br />
Maximum Allowable water allowance 5.65% of<br />
iii)<br />
water available @ canal head (Mm 3 )<br />
iv) Actual water allowance for sanctioned area<br />
= ii X 5.65 X water@canal head in Mm 3<br />
i 100<br />
(c) Canal Lift (Outside command)<br />
Maximum Permissible 10% (CCA -perennial area)<br />
i)<br />
(ha)<br />
ii) Actual sanctioned area (ha)<br />
Maximum Allowable water allowance for @ 7% of<br />
iii)<br />
water available at canal head (Mm 3 )<br />
iv) Actual water allowance for sanctioned area<br />
= ii X 7.00 X water@canal head in Mm 3<br />
i 100<br />
Case (B) Where canal takes off from the D/S -<br />
43<br />
pickup weir<br />
(a) Lift from dam storage<br />
i) Maximum Permissible area 1% of CCA (ha)<br />
ii) Actual sanctioned area (ha)<br />
Maximum Allowable water allowance 0.6% of<br />
iii)<br />
water available at canal head (Mm 3 )<br />
iv) Actual water allowance for sanctioned area<br />
= ii X 0.60 X water@canal head in Mm 3<br />
i 100<br />
Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 3 12:11 PM2/26/2009
S.No. Description Details<br />
(b) Pressurised Lift (Drip / Sprinkler)<br />
i) Maximum Permissible Area14% of CCA (ha)<br />
ii) Actual sanctioned area (ha)<br />
Maximum Allowable water allowance 5.65% of<br />
iii)<br />
water available @ canal head (Mm 3 )<br />
iv) Actual water allowance<br />
= ii X 5.65 X water@canal head in Mm 3<br />
i 100<br />
(c) lift for river portion between Dam to pickup weir<br />
i) Maximum Permissible Area 5% of CCA (ha)<br />
ii) Actual sanctioned area (ha)<br />
Maximum Allowable water allowance 3% of water<br />
iii)<br />
available @ canal head (Mm 3 )<br />
iv) Actual water allowance<br />
= ii X 3.00 X water@canal head in Mm 3<br />
i 100<br />
Deduction for transit loss in the river portion in fair<br />
(d)<br />
weather<br />
= 10% of water @ canal head<br />
Deduction of water quantity for non-irrigation use<br />
(e)<br />
in between river portion<br />
(f) Canal Lift (Outside command)<br />
Maximum Permissible 10% of [ CCA - Perennial<br />
i)<br />
area] (ha)<br />
ii) Actual sanctioned area (ha)<br />
iii)<br />
Maximum Allowable water allowance for 10% area<br />
@ 7% of water available at canal head (Mm 3 )<br />
iv) Actual water allowance for sanctioned area<br />
= ii X 7.00 X water@canal head in Mm 3<br />
i 100<br />
44 Water available calculation<br />
i) water utilisation as per project report in Mm 3 2.004 Mm 3<br />
ii) deduct water utilisation for use in kharif Mm 3<br />
water available at the beginning of Rabi season in<br />
iii)<br />
Mm 3 2.004 Mm 3<br />
45 To get water available @ canal head Deductions<br />
i) Deduct 39 (ii or iii) Mm 3 0.469 Mm 3<br />
ii) Add 39 (b) Mm 3<br />
iii) Deduct for siltation<br />
0.189 Mm 3<br />
deduct (40)(i) or (ii) as the case may be<br />
iv) deduct for non-irrigation use 38 (ii + iii)<br />
v) deduct (41)(ii + iii)<br />
vi) Water available at canal head in Mm 3 1.346 Mm 3<br />
Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 4 12:11 PM2/26/2009
S.No. Description Details<br />
46 Deduction from (45)(vi)<br />
Case (A) Where canal takes off directly from<br />
reservoir<br />
i) 42(a)(iv) in Mm 3 0.004542 Mm 3<br />
ii) 42(b)(iv) in Mm 3<br />
iii) 42(c)(iv) in Mm 3<br />
iv) Net water available at canal head in Mm 3 1.3415 Mm 3<br />
Case (B) Where canal takes off from the D/S side<br />
47<br />
pickup weir<br />
Deductions from (45)(vi)<br />
i) 43(a)(iv)<br />
ii) 43(b)(iv)<br />
iii) 43(c)(iv)<br />
iv) 43(d)<br />
v) 43(e)<br />
vi) 43(f)(iv)<br />
vii) Net water available at canal head in Mm 3 1.3415 X 0.8 = 1.0732 Mm 3<br />
48 Net area for sanctioning unit water entitlement<br />
Case (A) Deduction of Areas<br />
i) 42 (a) (ii) in ha 3 ha<br />
ii) 42 (b) (ii) in ha<br />
iii) 42 (c) (ii) in ha<br />
iv) deduct from project C.C.A.- 48 [(i)+(ii)+(iii)]<br />
Net Area available in ha<br />
527 ha<br />
Prescribed unit water use entitlement per ha of<br />
49<br />
net C.C.A.<br />
= 47(vii) Mm 3 0.002036 Mm 3 /ha<br />
/ha<br />
48(iv)<br />
50 Case (B) Deduction of Areas<br />
i) 43(a)(ii)<br />
ii) 43(b)(ii)<br />
iii) 43(c)(ii)<br />
iv) 43(f)(ii)<br />
v) deduct from project C.C.A.- 50 [(i)+(ii)+(iii)+(iv)]<br />
Net Area available in ha<br />
Prescribed unit water use entitlement per ha of<br />
51<br />
net C.C.A.<br />
= 47(vii) Mm 3 /ha<br />
50(v)<br />
Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 5 12:11 PM2/26/2009