<strong>PARDESHWADI</strong> <strong>MINOR</strong> <strong>IRRIGATION</strong> <strong>TANK</strong><br />

SALIENT FEATURES<br />

S.No. Description Details<br />

1 Name of Project Pardeshwadi Minor Tank<br />

2 Location Lattitude 19 48' 00" ; Longitude 76 12' 00"<br />

3 Basin Godavari<br />

4 Sub-Basin Godavari<br />

5 Name of River/ Nala Nagzari River<br />

6 Catchment Area (sq.km.) 16.78 Sq. Km<br />

7 Type [ Major / Medium / Minor / Minor (LS)] Minor<br />

8 Year of completion 1978<br />

9 Type of dam Earthen Dam with F.O.F. weir<br />

10 Gross storage (Mm 3 ) 2.193 Mm 3<br />

11 Live storage (Mm 3 ) 2.004 Mm 3<br />

12 Dead storage (Mm 3 ) 0.189 Mm 3<br />

13 Submergence area 110 ha<br />

14 Forest area in the submergence Nil<br />

15 75% dependable flow at site (Mm 3 ) 1.20 Mm 3<br />

16 50% dependable flow at site (Mm 3 ) 1.80 Mm 3<br />

17 TBL (m) 515.00 m<br />

18 MWL (m) 513.50 m<br />

19 FRL (m) 512.15 m<br />

20 Spillway Crest Level (m) 512.15 m<br />

21 MDDL (m) 508.80 m<br />

22 Length of embankment (m) 2700.00 m<br />

23 Maximum dam height (m) 10.50 m<br />

24 Spillway details<br />

i) Length (m) 113 m<br />

ii) Number of Gates & Size<br />

Ungated<br />

25 Design flood (m 3 /sec) 323.20 m 3 /sec.<br />

26 Sill level of head regulator/s (m) 508.50 m<br />

27 Length of LBC (km) No LBC<br />

28 Length of RBC (km) 3160 Km<br />

29 Capacity of LBC (m 3 /sec) N.A.<br />

30 Capacity of RBC (m 3 /sec) 0.198 Cumecs<br />

31 GCA (ha) 535 ha<br />

32 CCA (ha) 530 ha<br />

33 A ICA (ha) 320 ha<br />

33 B i) Number of Water User Associations (WUA) Nos. One<br />

Annexure-I<br />

Prescribed Unit Water Use Entitlement for Flow Irrigation in Rabi Season in a Normal Year.<br />

( Taluka :- Gangapur & District :- Aurangabad )<br />

ii) W.U.A. wise delineated Area in ha.<br />

320 ha<br />

Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 1 12:11 PM2/26/2009


S.No. Description Details<br />

34 Cropping Intencity % with Cropwise details<br />

i) Kharif 5.00%<br />

ii) Two Seasonal 15.00%<br />

iii) Rabi 80.00%<br />

iv) Hot Weather<br />

v) Perennial<br />

35 A Approved Cost (Rs.in lakh) 19.00 Lakh<br />

35 B Completion Cost (Rs.in lakh) 19.10 Lakh<br />

36 Approved Utilisation (Mm 3 ) 2.004 Mm 3<br />

(a) For Irrigation 2.004 Mm 3<br />

i) Kharif 0.071 Mm 3<br />

ii) Two Seasonal 0.171 Mm 3<br />

iii) Rabi 1.438 Mm 3<br />

iv) Hot Weather<br />

v) Perennial<br />

(b) For Non- Irrigation<br />

i) Kharif<br />

ii) Rabi<br />

iii) Hot Weather<br />

37 Non- Irrigation approved (Mm 3 ) with breakup<br />

i) Kharif<br />

ii) Rabi<br />

iii) Hot Weather<br />

38 Non-Irrigation Actual (Mm 3 )<br />

i) Kharif<br />

ii) Rabi<br />

iii) Hot Weather<br />

39 (a) Seasonwise Evaporation Loss (Mm 3 )<br />

i) Kharif<br />

ii) Fair weather 0.469 Mm 3<br />

iii) Total Annual<br />

39 (b) Post monsoon inflow (dry weather) (Mm 3 )<br />

i) Project report<br />

ii) Actual<br />

Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 2 12:11 PM2/26/2009


S.No. Description Details<br />

40 Reduction in the Reservoir due to Siltation in Mm 3<br />

i) Actual as per survey<br />

ii) or as per formula 0.189 Mm 3<br />

41 Any other commitment<br />

i) Kharif<br />

ii) Rabi<br />

iii) Hot Weather<br />

42 Reservoir Lift<br />

Case (A) Where canal takes of directly from the<br />

reservaoir<br />

(a) Flow Lift<br />

i) Maximum Permissible Area 6% of CCA (ha) 32 ha<br />

ii) Actual sanctioned area (ha)<br />

3 ha<br />

Maximum Allowable water allowance 3.6% of<br />

iii)<br />

water available at canal head (Mm 3 0.04845 Mm 3<br />

)<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 3.60 X water@canal head in Mm 3<br />

0.004542 Mm 3<br />

i 100<br />

(b) Pressurised Lift (Drip / Sprinkler)<br />

i) Maximum Permissible Area14% of CCA(ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance 5.65% of<br />

iii)<br />

water available @ canal head (Mm 3 )<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 5.65 X water@canal head in Mm 3<br />

i 100<br />

(c) Canal Lift (Outside command)<br />

Maximum Permissible 10% (CCA -perennial area)<br />

i)<br />

(ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance for @ 7% of<br />

iii)<br />

water available at canal head (Mm 3 )<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 7.00 X water@canal head in Mm 3<br />

i 100<br />

Case (B) Where canal takes off from the D/S -<br />

43<br />

pickup weir<br />

(a) Lift from dam storage<br />

i) Maximum Permissible area 1% of CCA (ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance 0.6% of<br />

iii)<br />

water available at canal head (Mm 3 )<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 0.60 X water@canal head in Mm 3<br />

i 100<br />

Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 3 12:11 PM2/26/2009


S.No. Description Details<br />

(b) Pressurised Lift (Drip / Sprinkler)<br />

i) Maximum Permissible Area14% of CCA (ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance 5.65% of<br />

iii)<br />

water available @ canal head (Mm 3 )<br />

iv) Actual water allowance<br />

= ii X 5.65 X water@canal head in Mm 3<br />

i 100<br />

(c) lift for river portion between Dam to pickup weir<br />

i) Maximum Permissible Area 5% of CCA (ha)<br />

ii) Actual sanctioned area (ha)<br />

Maximum Allowable water allowance 3% of water<br />

iii)<br />

available @ canal head (Mm 3 )<br />

iv) Actual water allowance<br />

= ii X 3.00 X water@canal head in Mm 3<br />

i 100<br />

Deduction for transit loss in the river portion in fair<br />

(d)<br />

weather<br />

= 10% of water @ canal head<br />

Deduction of water quantity for non-irrigation use<br />

(e)<br />

in between river portion<br />

(f) Canal Lift (Outside command)<br />

Maximum Permissible 10% of [ CCA - Perennial<br />

i)<br />

area] (ha)<br />

ii) Actual sanctioned area (ha)<br />

iii)<br />

Maximum Allowable water allowance for 10% area<br />

@ 7% of water available at canal head (Mm 3 )<br />

iv) Actual water allowance for sanctioned area<br />

= ii X 7.00 X water@canal head in Mm 3<br />

i 100<br />

44 Water available calculation<br />

i) water utilisation as per project report in Mm 3 2.004 Mm 3<br />

ii) deduct water utilisation for use in kharif Mm 3<br />

water available at the beginning of Rabi season in<br />

iii)<br />

Mm 3 2.004 Mm 3<br />

45 To get water available @ canal head Deductions<br />

i) Deduct 39 (ii or iii) Mm 3 0.469 Mm 3<br />

ii) Add 39 (b) Mm 3<br />

iii) Deduct for siltation<br />

0.189 Mm 3<br />

deduct (40)(i) or (ii) as the case may be<br />

iv) deduct for non-irrigation use 38 (ii + iii)<br />

v) deduct (41)(ii + iii)<br />

vi) Water available at canal head in Mm 3 1.346 Mm 3<br />

Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 4 12:11 PM2/26/2009


S.No. Description Details<br />

46 Deduction from (45)(vi)<br />

Case (A) Where canal takes off directly from<br />

reservoir<br />

i) 42(a)(iv) in Mm 3 0.004542 Mm 3<br />

ii) 42(b)(iv) in Mm 3<br />

iii) 42(c)(iv) in Mm 3<br />

iv) Net water available at canal head in Mm 3 1.3415 Mm 3<br />

Case (B) Where canal takes off from the D/S side<br />

47<br />

pickup weir<br />

Deductions from (45)(vi)<br />

i) 43(a)(iv)<br />

ii) 43(b)(iv)<br />

iii) 43(c)(iv)<br />

iv) 43(d)<br />

v) 43(e)<br />

vi) 43(f)(iv)<br />

vii) Net water available at canal head in Mm 3 1.3415 X 0.8 = 1.0732 Mm 3<br />

48 Net area for sanctioning unit water entitlement<br />

Case (A) Deduction of Areas<br />

i) 42 (a) (ii) in ha 3 ha<br />

ii) 42 (b) (ii) in ha<br />

iii) 42 (c) (ii) in ha<br />

iv) deduct from project C.C.A.- 48 [(i)+(ii)+(iii)]<br />

Net Area available in ha<br />

527 ha<br />

Prescribed unit water use entitlement per ha of<br />

49<br />

net C.C.A.<br />

= 47(vii) Mm 3 0.002036 Mm 3 /ha<br />

/ha<br />

48(iv)<br />

50 Case (B) Deduction of Areas<br />

i) 43(a)(ii)<br />

ii) 43(b)(ii)<br />

iii) 43(c)(ii)<br />

iv) 43(f)(ii)<br />

v) deduct from project C.C.A.- 50 [(i)+(ii)+(iii)+(iv)]<br />

Net Area available in ha<br />

Prescribed unit water use entitlement per ha of<br />

51<br />

net C.C.A.<br />

= 47(vii) Mm 3 /ha<br />

50(v)<br />

Entitlement-Format-Mokashi.xls <strong>PARDESHWADI</strong> 5 12:11 PM2/26/2009