- Page 1 and 2:
Phase 3 Development Project Social
- Page 3 and 4:
Table of Contents 5.3 Impact Assess
- Page 5 and 6:
Glossary Glossary Term Definition T
- Page 7 and 8:
Introduction Within the context of
- Page 9 and 10:
Introduction • Cultural obligatio
- Page 11 and 12:
Situation Analysis 2 Situation Anal
- Page 13 and 14:
Situation Analysis • Strategy int
- Page 15 and 16:
Situation Analysis 2.2.1 Demographi
- Page 17 and 18:
Situation Analysis Robinson River A
- Page 19 and 20:
Situation Analysis As a part of thi
- Page 21 and 22:
Situation Analysis Events The Borro
- Page 23 and 24:
Situation Analysis c. Residency The
- Page 25 and 26:
Situation Analysis There are no pub
- Page 27 and 28:
Situation Analysis Source: ABS 2006
- Page 29 and 30:
Situation Analysis Table 6: Total H
- Page 31 and 32:
Situation Analysis Figure 6: MRM In
- Page 33 and 34:
Situation Analysis “For those loc
- Page 35 and 36:
Situation Analysis Gulf SLA and Bor
- Page 37 and 38:
Situation Analysis McArthur River S
- Page 39 and 40:
Situation Analysis 2.2.2 Socioecono
- Page 41 and 42:
Situation Analysis wet season betwe
- Page 43 and 44:
Situation Analysis Table 10: Family
- Page 45 and 46:
Situation Analysis Indigenous peopl
- Page 47 and 48:
Situation Analysis Rates of housing
- Page 49 and 50:
Situation Analysis Organisation Des
- Page 51 and 52:
Situation Analysis 2.2.4 Economic O
- Page 53 and 54:
Situation Analysis 4. Improve our i
- Page 55 and 56:
Situation Analysis The community is
- Page 57 and 58:
Situation Analysis Figure 10: Langu
- Page 59 and 60:
Situation Analysis 3. The Gulf Regi
- Page 61 and 62:
Situation Analysis who uphold a tra
- Page 63 and 64:
Situation Analysis “We are fine w
- Page 65 and 66:
MRM Contributions 3.1.1 Annual Cont
- Page 67 and 68:
MRM Contributions The Trust was rai
- Page 69 and 70:
MRM Contributions • offer good le
- Page 71 and 72:
Community Goal Analysis 2. Move tow
- Page 73 and 74: Community Goal Analysis the Local R
- Page 75 and 76: Community Goal Analysis Building Bl
- Page 77 and 78: Social Impact Management Plan 5.4 I
- Page 79 and 80: Social Impact Management Plan Impac
- Page 81 and 82: Social Impact Management Plan provi
- Page 83 and 84: Social Impact Management Plan under
- Page 85 and 86: Social Impact Management Plan d. Tr
- Page 87 and 88: Social Impact Management Plan Prese
- Page 89 and 90: Social Impact Management Plan 5.4.3
- Page 91 and 92: Social Impact Management Plan d. Mi
- Page 93 and 94: Social Impact Management Plan In ad
- Page 95 and 96: Social Impact Management Plan Enhan
- Page 97 and 98: Social Impact Management Plan b. Pr
- Page 99 and 100: Social Impact Management Plan Sourc
- Page 101 and 102: References Halcrow 2011, McArthur R
- Page 103 and 104: Appendix 1 Appendix 1 — MRM Phase
- Page 105 and 106: Contents Contents .................
- Page 107 and 108: Executive summary Almost 300 people
- Page 109 and 110: TSF, its design, impact on Surprise
- Page 111 and 112: Letter from the General Manager ©
- Page 113 and 114: Consultation guidelines and princip
- Page 115 and 116: The IAP2 model was used to influenc
- Page 117 and 118: Methodology Stakeholder identificat
- Page 119 and 120: Goal The goal of the consultation p
- Page 121 and 122: Stage Stakeholder groups Activities
- Page 123: ● The consultation team requested
- Page 127 and 128: Table 8: Areas of interest raised b
- Page 129 and 130: “MRM workers get off the bus - th
- Page 131 and 132: the Phase 3 Development Project wer
- Page 133 and 134: stakeholders wished to know whether
- Page 135 and 136: Such comments indicated a strong se
- Page 137 and 138: ‘Can the Mine improve the road to
- Page 139 and 140: ‘Is there any way that we could h
- Page 141 and 142: e increased to ensure any impacts f
- Page 143 and 144: Impact - Negative Threats ● Techn
- Page 145 and 146: There was also further interest sho
- Page 147 and 148: Bing Bong Consultation was undertak
- Page 149 and 150: feedback on the role of the Senior
- Page 151 and 152: McArthur River Mine Phase 3 Develop
- Page 153 and 154: 10.2 Standard script for media enqu
- Page 155 and 156: Glossary 1 Introduction 1.1 Project
- Page 157 and 158: Figure 1 shows the location of MRM
- Page 159 and 160: During the EIS phase, communication
- Page 161 and 162: Name Role on project Responsibiliti
- Page 163 and 164: Xstrata believes stakeholder engage
- Page 165 and 166: © Rowland 2012 Page 15
- Page 167 and 168: undertaken. It is vitally important
- Page 169 and 170: Aspect 360 Degree Survey findings C
- Page 171 and 172: EIS timeframe and milestones The EI
- Page 173 and 174: 5.3 Communication Tools and Activit
- Page 175 and 176:
5.4 Stakeholder Engagement Strategy
- Page 177 and 178:
2. This development secures a new m
- Page 179 and 180:
7 Project Q&As Stakeholder engageme
- Page 181 and 182:
Issues Q. How much bigger will the
- Page 183 and 184:
Grouping Issue Potential concerns S
- Page 185 and 186:
9 Issues Management Management of i
- Page 187 and 188:
● What is your name? ● Where ar
- Page 189 and 190:
12 Evaluation Evaluation will allow
- Page 191 and 192:
Objective Measurable outcome Measur
- Page 193 and 194:
Appendix 3 Appendix 3: IAP2 Spectru
- Page 195 and 196:
McArthur River Mine Phase 3 Develop
- Page 197 and 198:
The proposed Phase 3 Development Pr
- Page 199 and 200:
Phase 3 Development Project Factshe
- Page 201 and 202:
Phase 3 Development Project Factshe
- Page 203 and 204:
Cultural Heritage Management August
- Page 205 and 206:
Regional Development August 2011 As
- Page 207 and 208:
Pathways to Employment August 2011
- Page 209 and 210:
Marine monitoring August 2011 Each
- Page 211 and 212:
Oysters Oysters are collected from
- Page 213 and 214:
Rehabilitation of McArthur River an
- Page 215 and 216:
COMMUNITY MEETING Ettienne Moller,
- Page 217 and 218:
A message from the General Manager
- Page 219 and 220:
Two more inductees for 15 year club
- Page 221 and 222:
360 degrees of feedback MRM recentl
- Page 223 and 224:
Safety Report MRM continues to redu
- Page 225 and 226:
The Old Girl retires Since 1998, Li
- Page 227 and 228:
Brisbane West Island Sir Edward Pe
- Page 229 and 230:
Local focus for cultural awareness
- Page 231 and 232:
MRM employees get fitter, healthier
- Page 233 and 234:
Environment update An additional 3,
- Page 235 and 236:
Mill report The Mill team has achie
- Page 237 and 238:
New starters Max MacRae Management
- Page 239 and 240:
Borroloola Golden Heart Awards Nigh
- Page 241 and 242:
A message from the General Manager
- Page 243 and 244:
MRM EIS Studies Continuing Studies
- Page 245 and 246:
Contracts Manager for Borroloola-ba
- Page 247 and 248:
A Rainbow Bee Eater recorded in the
- Page 249 and 250:
Mill report Production Supervisor B
- Page 251 and 252:
Safety report The continuing emphas
- Page 253 and 254:
Appendix 5 Engagement level Stakeho
- Page 255 and 256:
Appendix 5 Engagement level Keep sa
- Page 257 and 258:
Appendix 5 Engagement level Stakeho
- Page 260 and 261:
Appendix 2 Appendix 2 — MRM Commu
- Page 262 and 263:
Appendix 3 Appendix 3 — MRM Commu
- Page 264 and 265:
Appendix 3 Project partner/s Projec
- Page 266 and 267:
Appendix 4 Potential impact or bene
- Page 268:
Appendix 4 Increased involvement by