Situation Analysis<br />

Figure 4: Total MRM Workforce as at 31 December 2006 - 2010<br />

Since 2006, the number of permanent employees engaged by MRM has increased by 100% to 282.<br />

Contractor numbers have fluctuated during this period due to the civil works required for the open pit<br />

conversion and finalisation of procurement arrangements for outsourced site services including camp<br />

management, catering and fleet operation.<br />

Figure 5: Local MRM Workforce Participation<br />

Over the same period, the percentage of local employees has remained relatively steady between around<br />

17% and 21%. Importantly, the composition of this local employment base has also changed as the<br />

Indigenous workforce participation rate increased. The number of employees identifying as being of<br />

Indigenous descent has increased from 6 to 59. This has surpassed a target of 20% Indigenous workforce<br />

participation which was set in 2007.<br />

Phase 3 Development Project ----- <strong>Social</strong> <strong>Impact</strong> <strong>Assessment</strong> 30