Essar Steel
Essar Steel
Essar Steel
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Expansion-II<br />
• 2008 - Mod-6 erection started<br />
• 2010- Mod-6 commissioned in November.<br />
• Capacity- 1.7 MTPA (CDRI)<br />
• Equipped with VPSA system to help in<br />
consuming COREX gas<br />
• 2009 - VPSA erection started<br />
• 2011- VPSA commissioned in November.<br />
• Purpose -- Designed for removal of CO2 and<br />
H2O from Top Gas Fuel.<br />
• Capacity --- 1,35,000 Nm3/Hr<br />
• Power Consumption – 55 Kwh/t<br />
Mod-6<br />
VPSA<br />
15