Expansion-II<br />

• 2008 - Mod-6 erection started<br />

• 2010- Mod-6 commissioned in November.<br />

• Capacity- 1.7 MTPA (CDRI)<br />

• Equipped with VPSA system to help in<br />

consuming COREX gas<br />

• 2009 - VPSA erection started<br />

• 2011- VPSA commissioned in November.<br />

• Purpose -- Designed for removal of CO2 and<br />

H2O from Top Gas Fuel.<br />

• Capacity --- 1,35,000 Nm3/Hr<br />

• Power Consumption – 55 Kwh/t<br />

Mod-6<br />

VPSA<br />