01.07.2015 Views

installation, operating and service instructions eva series boiler

installation, operating and service instructions eva series boiler

installation, operating and service instructions eva series boiler

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PERIODIC MAINTENANCE RECOMMENDED CHECK LIST<br />

Frequency Component/Item Recommended Test<br />

Daily<br />

Maintenance<br />

Weekly<br />

Maintenance<br />

Monthly<br />

Maintenance<br />

Semi-Annual<br />

Maintenance<br />

Annual<br />

Maintenance<br />

As-Required<br />

Gauges, monitors, <strong>and</strong> indicators<br />

Gauges, monitors, <strong>and</strong> indicators<br />

Burner flame<br />

Low Draft, fan air pressure, <strong>and</strong> damper<br />

position interlocks<br />

Igniter<br />

Flame signal strength<br />

Flame failure detection system<br />

Firing rate control<br />

Pilot <strong>and</strong>/or main fuel valves<br />

Low-water fuel cutoff<br />

Flue, vent, stack, or outlet dampers<br />

Gas pressure interlocks<br />

Gauges, monitors, <strong>and</strong> indicators<br />

Flame failure detection system<br />

Condensate drain tubes<br />

Air filter<br />

Interlocks <strong>and</strong> valves<br />

Flue, vent, stack, or outlet dampers<br />

Flame failure detection system<br />

Pilot <strong>and</strong>/or main fuel valves<br />

Pilot <strong>and</strong>/or main fuel valves<br />

Flame safeguard<br />

Air Filter<br />

Boiler trim<br />

High limit <strong>and</strong> <strong>operating</strong> temp. controls<br />

Low-water fuel cutoff<br />

Safety relief valves<br />

Make visual inspection <strong>and</strong> record readings.<br />

Check operation of <strong>boiler</strong> is as shown on page (46) of<br />

this manual.<br />

Make visual inspection of burner flame.<br />

Test low draft, fan, air pressure, <strong>and</strong> damper position<br />

interlocks according to <strong>instructions</strong> if so equipped<br />

Make visual inspection, check flame signal strength; log<br />

Read <strong>and</strong> log flame signal meter, read for both pilot <strong>and</strong><br />

main flames<br />

Close manual fuel supply for (1) pilot, (2) main fuel cock,<br />

<strong>and</strong>/or valve(s); check safety shutdown timing<br />

Check firing rate control, place RWF40 in manual<br />

mode <strong>and</strong> check high <strong>and</strong> low firing settings for proper<br />

operation<br />

Open limit switch <strong>and</strong> make aural <strong>and</strong> visual check;<br />

check valve position indicators <strong>and</strong> check fuel meters if<br />

so fitted<br />

Test low-water fuel cutoff device <strong>and</strong> alarm according to<br />

manufacturer’s <strong>instructions</strong><br />

Check components<br />

Test high <strong>and</strong> low gas pressure interlocks<br />

Recalibrate all indicating <strong>and</strong> recording gauges<br />

Check components<br />

Check drain tubes have liquid in trap <strong>and</strong> condensate is<br />

properly directed<br />

Check air filter<br />

Check piping <strong>and</strong> wiring of all interlocks <strong>and</strong> shut off<br />

valves if so equipped<br />

Measure carbon monoxide <strong>and</strong> oxygen levels <strong>and</strong><br />

temperature in flue products<br />

Conduct pilot turndown test according to manufacturer’s<br />

<strong>instructions</strong>. This test is required annually <strong>and</strong> after any<br />

adjustments to flame scanner mount or pilot burner<br />

Check all coils <strong>and</strong> diaphragms; test other <strong>operating</strong><br />

parts of all safety shutoff <strong>and</strong> control valves<br />

Perform leakage test on pilot <strong>and</strong> main gas <strong>and</strong>/or oil<br />

fuel valves, in accordance with <strong>instructions</strong><br />

Test purge timing according to manufacturer’s<br />

<strong>instructions</strong><br />

Replace (recommended)<br />

Remove lower front jacket panel <strong>and</strong> check for any signs<br />

of corrosion <strong>and</strong> leaks<br />

Test proper operation<br />

Recondition or replace<br />

Test safety relief valves in accordance with ASME Boiler <strong>and</strong><br />

Pressure Vessel Code, Sections VI <strong>and</strong> VII<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!