- Page 8 and 9: CHAPTER 4 - WATER SUPPLY Figure 4.1
- Page 11 and 12: Executive SummaryBACKGROUNDIn 2002,
- Page 13 and 14: 2. Provide a more natural freshwate
- Page 15 and 16: Incentive Based Protection Mechanis
- Page 17: Figure 2 - Dona Bay CWM Program, Ph
- Page 20 and 21: WatershedAreadiverted toDona BayFig
- Page 22: 1.3 AREAS OF RESPONSIBILITY AND OBJ
- Page 25 and 26: consistent with natural system rest
- Page 27 and 28: Chapter 2 Dona BayWatershed Descrip
- Page 29: through September. April and May ar
- Page 33 and 34: Figure 2.2 - Sarasota County 2050 P
- Page 35 and 36: However, much of the Dona Bay water
- Page 37 and 38: Figure 2.4 - Dona Bay Watershed2 -
- Page 39 and 40: Chapter 3 - Natural SystemsPhoto of
- Page 41 and 42: HBMP would focus on both water qual
- Page 43 and 44: The predominant land use in the Don
- Page 45 and 46: The Dona Bays system is comprised o
- Page 47 and 48: 3.2 OVERVIEW OF NATURAL SYSTEMS ISS
- Page 49 and 50: Bay with seagrasses (Figure 3.3). S
- Page 51 and 52: this information does suggest that
- Page 53 and 54:
Figure 3.8 - Shoreline Features in
- Page 55 and 56:
The damaging effects of the excess
- Page 57 and 58:
In addition to benefits to oyster h
- Page 59 and 60:
Chapter 4Water Supply4.1 INTRODUCTI
- Page 63:
extent.4.1.1.1 Historical Perspecti
- Page 66 and 67:
4.1.2 Overview of Sarasota County
- Page 69:
4.2 STUDIES, REPORTS AND DATAA numb
- Page 72:
SWFWMD 2000 - Southern Coastal Wate
- Page 75 and 76:
Use of existing rulesEnhancements t
- Page 77 and 78:
4.3.1 Applicable LegislationUnder P
- Page 79 and 80:
was passed by Congress in 1974 to p
- Page 81:
Within the Dona Bay watershed, thre
- Page 84 and 85:
Sarasota and Venice; the Town of Lo
- Page 86 and 87:
that may be instituted. This was al
- Page 88 and 89:
4.4.5 Issue: Protection of the Wate
- Page 90 and 91:
The source water samples yielded tr
- Page 92 and 93:
Total Hardness in the source water
- Page 94 and 95:
Chapter 5Water Quality5.1 INTRODUCT
- Page 96 and 97:
and closed are 7 and 11 feet (NGVD)
- Page 98 and 99:
5.2 RECENT AND ONGOING MONITORING P
- Page 100 and 101:
5.3 OVERVIEW OF WATER QUALITY CONDI
- Page 102 and 103:
Figure 5.5 - Salinity Regimes in Ly
- Page 104 and 105:
salinities in Dona Bay varied rough
- Page 106 and 107:
The combination of lower than “no
- Page 108 and 109:
confounding errors, salinity data w
- Page 110 and 111:
Station 25 Salinity Comparison3530A
- Page 112 and 113:
At locations closer to Venice Inlet
- Page 114 and 115:
Annual Nitrogen Loads8000060000Exis
- Page 116 and 117:
Annual Suspended Solids Loads700000
- Page 118 and 119:
Chapter 6 - Flood ProtectionView of
- Page 120 and 121:
grove site. Results of the study pr
- Page 122 and 123:
In the 1960s, the United States Dep
- Page 124 and 125:
Public Street Location Edge of Pave
- Page 126 and 127:
considered. Fox Creek and Shakett C
- Page 128 and 129:
sites and the potential service or
- Page 130 and 131:
flows to develop rating curves have
- Page 132 and 133:
Figure 6.2 - Dona Bay Watershed, 10
- Page 134 and 135:
Florida Departmentof EnvironmentalP
- Page 136 and 137:
6.5.2 Maintenance of Flood Study Mo
- Page 138 and 139:
REFERENCESAngas M., Robert, 1945. E
- Page 140 and 141:
Lincer, Jeffrey L., Ph.D., Mote Mar
- Page 142:
effects of anthropogenic nutrient l