10.07.2015 Views

“Central Railway: Thane”

“Central Railway: Thane”

“Central Railway: Thane”

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Final draft Report on Trespassing over <strong>Railway</strong> Track in Mumbai Suburban area& remedial measures thereon.3.2 SOLUTIONS TO DISCOURAGE TRESPASSING AT THANE :1. PROVIDE RAILING BETWEEN PLATFORMS 2, 3/4, 5/6, 7/8 & 9/10.TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.2. PROVIDE GREEN PATCH IN TRIANGULAR PORTION AT NORTHERN END OFPLATFORM 7/8.TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.3. PROVIDE R.C.C. COMPOUND WALL BEYOND PLATFORM NO.1 AT NORTHERN ENDON EAST SIDE TILL VITAWA.TO PREVENT TRESPASSSSING FROM THANE EAST TO PLATFORMS 7/8 AND 9/104. WIDEN 2ND FOB AT NORTHERN END TOWARDS KALYAN SIDE TO PROVIDEADDITIONAL CONNECTION TO ALL PLATFORMS LANDING ON THE NORTHERNSIDE.TO DIVERT THE PUBLIC FLOW ON BOTH SIDES OF THE FOB AND PREVENTCROWDING ON THE FOB.5. TICKET OFFICE ON WEST SHOULD BE DEMOLISHED AND PROVIDE FOB ABOVE IT,WHICH WILL HAVE EXIT THROUGH STAIRS ON PLATOFRM NO.2,3/4,5/6,9/10 & ONPLATFORM NO. 7/8 THROUGH ESCALATORS/LIFTS.TO DIVERT THE PUBLIC FLOW, AND PREVENT OVERCROWDING ON THE EXISTINGFOBs AND PREVENT TRESPASSING BETWEEN THE PLATFORMS.6. PROVIDE GREEN PATCH WITH BARRICADES AT NORTHERN END OF PLATFORMNO. 3/4.TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.7. PROVIDE R.C.C. BOUNDARY WALL ON THE NORTHERN END PARALLEL TOPLATFORM NO.2 TILL CREEK.TO PREVENT TRESPASSSSING FROM THANE WEST TO PLATFORMS 3/4 AND 5/6.8. PROVIDE EAST-WEST FOB AT SOUTHERN END OF THANE STATION CONNECTINGPLATFORMS 1 & 7/8 BY RAMPSTO FACILITATE EASY FLOW OF HEAVY LUGGAGE TO SOUTHERN END OF PLATFORM 7/89. WIDEN EXISTING SOUTHERN FOB BY 6M.10. WIDEN NORTH END PUBLIC FOB BY 2.4M AND PROVIDE LANDING TO PLATFORMS3/4 & 5/6 AND CONNECT THE SAME TO 2 ND FOB FROM NORTH BY A SKYWALK.TO PROVIDE DIRECT ACCESS FROM THANE WEST NORTH END BUS STOP TO ALL PLATFROMS ANDHENCE PREVENT TRESPASSING.MRVC - 9 - Sir JJCOA Consultancy Cell

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!