10.07.2015 Views

“Central Railway: Thane”

“Central Railway: Thane”

“Central Railway: Thane”

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT1. PROVIDE RAILING BETWEEN PLATFORMS 2, 3/4, 5/6, 7/8 & 9/10.TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.2. PROVIDE GREEN PATCH IN TRIANGULAR PORTION AT NORTHERN END OFPLATFORM 7/8.TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.3. PROVIDE R.C.C. COMPOUND WALL BEYOND PLATFORM NO.10 ATNORTHERN END ON EAST SIDE TILL VITAWA.TO PREVENT TRESPASSSSING FROM THANE EAST TO PLATFORMS 7/8 AND9/104. WIDEN 2ND FOB AT NORTHERN END TOWARDS KALYAN SIDE TO PROVIDEADDITIONAL CONNECTION TO ALL PLATFORMS LANDING ON THENORTHERN SIDE.TO DIVERT THE PUBLIC FLOW ON BOTH SIDES OF THE FOB AND PREVENTCROWDING ON THE FOB.5. TICKET OFFICE ON WEST SHOULD BE DEMOLISHED AND PROVIDE FOBABOVE IT, WHICH WILL HAVE EXIT THROUGH STAIRS ON PLATOFRMNO.2,3/4,5/6,9/10 & ON PLATFORM NO. 7/8 THROUGH ESCALATORS/LIFTS.(ALREADY UNDER CONSTRUCTION)TO DIVERT THE PUBLIC FLOW, AND PREVENT OVERCROWDING ON THEEXISTING FOBs AND PREVENT TRESPASSING BETWEEN THE PLATFORMS.6. PROVIDE GREEN PATCH WITH BARRICADES AT NORTHERN END OFPLATFORM NO. 3/4.TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.7. PROVIDE R.C.C. BOUNDARY WALL ON THE NORTHERN END PARALLEL TOPLATFORM NO.2 TILL CREEK.TO PREVENT TRESPASSSSING FROM THANE WEST TO PLATFORMS 3/4 AND5/6.TWO EXISTING FOBS AT SOUTHERNEND ARE RUNNING PARALLEL INEXISTING WHICH ARE PROPOSED TOMERGE AT SAME LEVEL AND WIDENIT FOR FASTER AND EASYMOVEMENT OF PASSANGERS.PROPOSED FOB AT SOUTHERNEND WHICH CONNECTS PLATFORMNO1. & 7&8 WHERE OUTSTATIONTRAINS STOPS AND IT CONTINUOSTILL WESTLEGENDPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT8. PROVIDE EAST-WEST FOB AT SOUTHERN END OF THANE STATIONCONNECTING PLATFORMS 1 & 7/8 BY RAMPSTO FACILITATE EASY FLOW OF HEAVY LUGGAGE TO SOUTHERN END OF PLATFORM 7/89. WIDEN EXISTING SOUTHERN FOB BY 6M.10. WIDEN NORTH END PUBLIC FOB BY 2.4M AND PROVIDE LANDING TOPLATFORMS 3/4 & 5/6 AND CONNECT THE SAME TO 2ND FOB FROM NORTHBY A SKYWALK.TO PROVIDE DIRECT ACCESS FROM THANE WEST NORTH END BUS STOP TO ALLPLATFROMS AND HENCE PREVENT TRESPASSING.PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!