INDICATIVE BUILDING COSTS<strong>Costs</strong> updated to 3rd Quarter 2006The <strong>Indicative</strong> <strong>Building</strong> <strong>Costs</strong> booklet, last published in 1st Quarter 2006 has a number ofdiscrete sections which are being updated on a quarterly basis and posted separately on theIntranet.Click onto the links below to gain access to the different, or related sections:-Average <strong>Building</strong> <strong>Costs</strong> per m2 (<strong>co</strong>sts per sq ft);Benchmark <strong>Costs</strong>;Air Conditioning <strong>Costs</strong>;Location Factors;Tender Price Index; Civil Engineering <strong>Costs</strong> for Roads and Bridges


AVERAGE COSTS PER M2 (COSTS PER SQ FT)3rd Quarter 2006IntroductionThe <strong>co</strong>sts in this study represent typical guideline ranges of <strong>co</strong>sts that a client <strong>co</strong>uld expect topay for the buildings outlined, based on current (3rd quarter 2006) price levels.Unless otherwise indicated, <strong>co</strong>sts are per m² or per sq ft of gross floor area, measured to theinternal face of the external walls.Click onto the links below to go to the Cost per m2 (Cost per sq ft) tables:-Industrial <strong>Building</strong>s;Offices;Retail;Health,Leisure;Education;Residential;Hotels<strong>Building</strong> <strong>co</strong>sts are affected by a number of factors, building type, location, siteaccessibility, design, etc. However, it is possible to give <strong>co</strong>sts for building types assuming`average design', `average accessibility' etc. <strong>Building</strong>s will always be built whose <strong>co</strong>sts falloutside the bands given; the <strong>co</strong>sts in this study are indicative <strong>co</strong>sts for average <strong>co</strong>nditions,that is to say an unrestricted site with no abnormal requirements (for demolitions, specialfoundations etc.).External WorksThe <strong>co</strong>sts in the tables are for the building only (i.e. excluding external works) with aproportion of preliminaries and <strong>co</strong>ntingencies allocated to the building. The <strong>co</strong>st of roads,landscaping, site enclosure and any service runs should be added to arrive at any calculationof total development <strong>co</strong>st.In broad terms it is worth noting that multi-million pound schemes, cramped sites and multistorey <strong>co</strong>nstruction will mitigate towards low percentage additions for external works. At theother end of the scale, putting a small building on a large site will create a disproportionateexternal works percentage._____________________________________________________________________Cost Research Department (July 2006) 1 © Paul Moore for EC Harris


External Works (Cont’d)A range of <strong>co</strong>sts and average figures has been calculated for External Works and these aregiven below for a number of different building types.<strong>Building</strong> TypeRange of <strong>Costs</strong> forExternal WorksAveragePercentageAdditionCar parkingIndustrial buildings 14 – 35% 19%Offices generally 2 - 12% 6%B1 Business parks 5 - 13% 10%Office refurbishment 0 - 6% 3%Office fitting out 0 - 2% 0%Multi storey car parks 3 - 8% 5%Underground car parks - N/ASupermarkets 18 - 40% 32%Retail warehouses 21 - 35% 30%Shops / Shopping centres 8 – 24% 18%Hospitals 6 - 20% 13%Health centres 9 - 17% 14%Old people’s homes / Nursing homes 7 – 16% 12%Restaurants (shells) 4 – 18% 12%Restaurant fitting out N/A 0%Retail or bank fitting out N/A 0%<strong>Public</strong> houses 10 – 25% 18%Theatres 7 - 14% 9%Cinemas 6 - 13% 10%Sports/leisure centres / Leisure pools 8 - 17% 13%Community centres 9 - 15% 12%Schools 10 – 18% 16%Housing - Housing Assoc standard 15 – 31% 20%- Speculative 6 – 25% 11%- Private good quality 6 – 20% 12%Flats - Housing Assoc or spec private 7 – 30% 15%- Private good quality 5 - 11% 6%Sheltered housing 9 - 18% 12%Students residences 4 - 10% 7%Hotels Included 0Note that the figures given above for external works include for normal parking provisions.Where additional parking is required, additional <strong>co</strong>sts can be added from the information onthe next page. Where extensive access roads or landscaping is required, these <strong>co</strong>sts shouldbe calculated separately.The <strong>co</strong>st of parking at grade (at ground level) can most simply be calculated on a <strong>co</strong>st per carbasis. Assuming a clear site with no special preparation required, typical parking <strong>co</strong>sts in theSouth East would be:-Tarmacadam pavingBlock paviors£1,100 - £1,400 per space£1,250 - £1,500 per space<strong>Costs</strong> include normal paving, kerbs, site lighting, drainage, etc as necessary.Note that the <strong>co</strong>st of normal parking provision is included in the external workspercentage addition figures given earlier._____________________________________________________________________Cost Research Department (July 2006) 2 © Paul Moore for EC Harris


MethodologyThe <strong>co</strong>sts in this study have been calculated by updating the prices in the previous edition ofthe <strong>Indicative</strong> <strong>Building</strong> <strong>Costs</strong> booklet to current, 3rd quarter 2006 levels, using the EC HarrisTender Price Index. These updated figures were checked against <strong>co</strong>sts for tenders morerecently received and adjusted as necessary against these later figures.Since the <strong>co</strong>sts represent average buildings the more extreme buildings in the database havebeen excluded. The updated <strong>co</strong>sts represent realistic estimates of buildings `as built'.ForecastingThe figures in the Guide are current prices at 3rd quarter 2006 price levels. Appendix A<strong>co</strong>ntains a forecast of tender price inflation over the next 5 years, expressed as a percentageaddition to apply to the base figures <strong>co</strong>ntained in the guide.Mechanical Engineering <strong>Costs</strong>With mechanical engineering installations be<strong>co</strong>ming ever more sophisticated, and M & E <strong>co</strong>stsbe<strong>co</strong>ming increasingly significant, guideline figures produced by the ECH Engineering Sectionhave been calculated for the <strong>co</strong>sts of different types of air <strong>co</strong>nditioning installations which aregenerally applicable to <strong>co</strong>mmercial buildings.To view these air <strong>co</strong>nditioning <strong>co</strong>sts, click onto this link: - Air Conditioning Capital <strong>Costs</strong>Regional FiguresThe average building have all been adjusted to a <strong>co</strong>mmon region using the regional indexfigures published by the <strong>Building</strong> Cost Information Service (BCIS) of the Royal Institution ofChartered Surveyors. These base <strong>co</strong>st figures were then adjusted using the BCIS regionalindices to give the average <strong>co</strong>sts for the regions published in the study.For simplicity, the regions have been grouped together into groups of similarly priced areas,grouped together to reflect the latest BCIS location factorsNote that the regional factors are <strong>co</strong>nstantly changing to reflect tender <strong>co</strong>nditions and as aresult the grouping of the regions changed in 2006. Not the least of those changes is thatprices in Outer London are now banded with prices in the rest of the South East Region as thedifferences between them have shrunk over time.With <strong>co</strong>sts in South East England as the base, the ‘Cost per m2’ tables make the followingallowances for the other regions: -Outer London + 3%Inner London + 14%London Postal Districts + 9%East Anglia, South West - 7%North West, Northern, Yorks & Humber - 11%E & W Midlands, - 13%S<strong>co</strong>tland, Wales -15%Northern Ireland - 36%The latest BCIS Regional figures, which gives location factors at Region and County levelscan be accessed by clicking onto this link:- BCIS Regional Location Factors_____________________________________________________________________Cost Research Department (July 2006) 3 © Paul Moore for EC Harris


Civil Engineering <strong>Costs</strong> of Roads and BridgesOutline <strong>co</strong>sts are provided for roads, bridges and other structures. This data has <strong>co</strong>me fromthe work that that we have been carrying out with the Highways Agency. Only a small,representative sample of the available <strong>co</strong>st data is shown, more information can be providedon request.<strong>Costs</strong> are given for the more <strong>co</strong>mmon forms of road and for the more <strong>co</strong>mmon bridges andassociated structures.Rates generally are given per linear metre run of roads, including all work to carriageways,verges, etc. The <strong>co</strong>sts for bridges are given per m2 of deck area. The bridge <strong>co</strong>sts arecategorized by number of spans as this was found to be the most <strong>co</strong>sts significant designitem.To view these civil engineering <strong>co</strong>sts, click onto the links below:-Civil Engineering <strong>Costs</strong> of RoadsCivil Engineering <strong>Costs</strong> of Bridges_____________________________________________________________________Cost Research Department (July 2006) 4 © Paul Moore for EC Harris


Appendix AEC HARRIS TENDER PRICE INDEXThe <strong>co</strong>sts in this study have been calculated at 3rd quarter 2006 price levels. To update toa later tender date, add the following percentage additions, which have been calculatedfrom the EC Harris Tender Price Indices.EC Harris TPI - Updating from 3rd Qtr 2006Year Quarter National TPI South East London TPI2006 4 0.5% 0.5% 1.1%2007 1 1.1% 1.7% 2.7%2 2.4% 3.4% 4.0%3 3.8% 4.5% 5.3%4 4.3% 5.1% 6.5%2008 1 4.7% 6.5% 8.2%2 6.2% 8.2% 9.8%3 7.6% 9.5% 11.1%4 8.2% 10.2% 12.5%2009 1 8.7% 11.6% 14.3%2 10.3% 13.4% 16.0%3 11.8% 14.7% 17.4%4 12.5% 15.6% 19.0%2010 1 13.1% 17.1% 20.9%2 14.8% 19.0% 22.9%3 16.3% 20.5% 24.5%4 17.0% 21.3% 26.2%2011 1 17.5% 22.8% 27.9%2 19.1% 24.6% 29.7%3 20.6% 25.9% 31.1%4 21.3% 26.7% 32.7%The full EC Harris Tender Price Indices series can be accessed by clicking on this link:-EC Harris Tender Price Index_________________________________________________________________________Cost Research Department July 2006© Paul Moore for EC Harris


Air Conditioning - Capital CostOffices 3rd Qtr 2006 Cost /m2Variable Refrigerant Flow (VRF/VRV)Displacement Ventilation(VRF/VRV) Heat Re<strong>co</strong>veryVersatempChilled Ceiling2 Pipe Fan Coil System - Perimeter2 Pipe Fan Coil System - CeilingChilled Beam Passive4 Pipe Fan Coil System - CeilingChilled Beam ActiveChilled Ceiling with Displacement Vent4 Pipe Fan Coil System - PerimeterUnderfloor VAVVariable Air Volume80 100 120 140 160 180 200 220 240 260Capital Cost £/m2


AVERAGE COSTS AT 3RD QUARTER 2006 PRICE LEVELSINDUSTRIAL BUILDINGS<strong>Costs</strong> per m2 gross floor area<strong>Costs</strong> per sq ft gross floor areaSouth East,Outer LondonInner LondonLondon PostalDistrictsSouth West,East AngliaY & H,North West,Northern,E & W Midlands,S<strong>co</strong>tland,WalesNorthern Ireland£/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2£ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ftSpeculative Industrial Units (shell only)Purpose Built industrial units (incl Mech & Electrservices)High bay distribution unitsChilled Distribution Warehouses389 -557 400 -574 443 -635 424 -607 361 -518 346 -496 338 -485 330 -474 249 -35736 -52 37 -53 41 -59 39 -56 34 -48 32 -46 31 -45 31 -44 23 -33622 -907 641 -934 709 -1034 678 -989 578 -843 553 -807 541 -789 529 -771 398 -58058 -84 60 -87 66 -96 63 -92 54 -78 51 -75 50 -73 49 -72 37 -54720 -926 742 -954 821 -1055 785 -1009 670 -861 641 -824 626 -805 612 -787 461 -59367 -86 69 -89 76 -98 73 -94 62 -80 60 -77 58 -75 57 -73 43 -551029 -1389 1060 -1430 1173 -1583 1121 -1514 957 -1291 915 -1236 895 -1208 874 -1180 658 -88996 -129 98 -133 109 -147 104 -141 89 -120 85 -115 83 -112 81 -110 61 -838 Pump Petrol Filling Station - each687,000708,000 783,000 749,000 639,000612,000 598,000 584,000440,000Underground car parks (per space) 19,400 -23,400 20,000 -24,100 22,900 -28,600 25,800 -31,100 18,100 -21,700 17,300 -20,800 16,900 -20,300 16,500 -19,900 12,400 -15,000Multi storey car parks (per space) 7,400 -9,700 7,700 -9,900 8,500 -11,000 8,100 -10,500 6,900 -9,000 6,600 -8,600 6,500 -8,400 6,300 -8,200 4,800 -6,200<strong>Costs</strong> exclude Externals. Click here for indicative figures for the additional <strong>co</strong>sts of External Works© Paul Moore for EC HarrisNotes:Shell industrial units will usually have services installations to main distribution units only. Heating and lighting <strong>co</strong>sts are excluded. Purpose built industrial units will usually include for an element of both heating and lighting and for a small percentage of officeprovision. Elevation treatment will usually be more expensive than in standard units .High bay distribution units are purpose built. Eaves heights may be from 15 to 20m high. Chilled distribution warehouses are also purpose built. Structures will include for a higher level of insulation than in standard units while the services installations will includechilling units.


AVERAGE COSTS AT 3RD QUARTER 2006 PRICE LEVELS<strong>Costs</strong> per m2 gross floor area<strong>Costs</strong> per sq ft gross floor areaOFFICESSouth East,Outer LondonInner LondonLondon PostalDistrictsSouth West,East AngliaY & H,North West,Northern,E & W Midlands,S<strong>co</strong>tland,WalesNorthern Ireland£/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2£ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ftOffices -traditional, low rise, brick, no A/C-medium rise, Cat 'A' fit out, no A/C-medium rise, Cat 'A' fit out, incl A/C- high rise, incl Cat'A' fit out, incl A/C- "prestige" offices/ headquarters buildings- B1 Business Park development, incl Cat'A' fit out and A/C- B1 Business Park development, incl Cat'A'fit out, no A/CCall Centres - incl Cat 'A' fit out and A/COffice refurbishment including A/COffice fit out to Cat 'B' (of new shell)916 -1105 944 -1138 1045 -1260 999 -1204 852 -1028 815 -983 797 -961 779 -939 586 -70785 -103 88 -106 97 -117 93 -112 79 -95 76 -91 74 -89 72 -87 54 -661166 -1555 1201 -1601 1329 -1772 1271 -1695 1084 -1446 1038 -1384 1014 -1353 991 -1322 746 -995108 -144 112 -149 123 -165 118 -157 101 -134 96 -129 94 -126 92 -123 69 -921440 -2083 1483 -2146 1642 -2375 1570 -2270 1339 -1937 1282 -1854 1253 -1812 1224 -1771 922 -1333134 -194 138 -199 153 -221 146 -211 124 -180 119 -172 116 -168 114 -164 86 -1241749 -2449 1802 -2522 1994 -2792 1906 -2669 1627 -2277 1557 -2179 1522 -2130 1487 -2081 1119 -1567162 -227 167 -234 185 -259 177 -248 151 -212 145 -202 141 -198 138 -193 104 -1461956 -2436 2015 -2509 2230 -2777 2132 -2655 1819 -2265 1741 -2168 1702 -2119 1663 -2070 1252 -1559182 -226 187 -233 207 -258 198 -247 169 -210 162 -201 158 -197 154 -192 116 -1451140 -1814 1174 -1868 1300 -2068 1243 -1977 1060 -1687 1015 -1614 992 -1578 969 -1542 730 -1161106 -169 109 -174 121 -192 115 -184 99 -157 94 -150 92 -147 90 -143 68 -108907 -1328 934 -1368 1034 -1514 989 -1448 843 -1235 807 -1182 789 -1155 771 -1129 580 -85084 -123 87 -127 96 -141 92 -134 78 -115 75 -110 73 -107 72 -105 54 -791101 -1555 1134 -1601 1255 -1772 1200 -1695 1024 -1446 980 -1384 958 -1353 936 -1322 705 -995102 -144 105 -149 117 -165 112 -157 95 -134 91 -129 89 -126 87 -123 65 -92713 -1386 734 -1428 812 -1580 777 -1511 663 -1289 634 -1234 620 -1206 606 -1178 456 -88766 -129 68 -133 75 -147 72 -140 62 -120 59 -115 58 -112 56 -109 42 -82697 -1263 718 -1301 795 -1440 760 -1377 649 -1175 621 -1124 607 -1099 593 -1074 446 -80865 -117 67 -121 74 -134 71 -128 60 -109 58 -104 56 -102 55 -100 41 -75<strong>Costs</strong> exclude Externals. Click here for indicative figures for the additional <strong>co</strong>sts of External Works© Paul Moore for EC HarrisNotes:Prestige / Headquarters buildings can easily exceed the <strong>co</strong>sts shown. Elevation treatments, finishes and fittings are potential areas of high expenditure. Services installations can be increased to include CCTV, <strong>Building</strong> Management Systems(BMS), UninterruptedPower Supplies (UPS), etc, with substantial <strong>co</strong>st <strong>co</strong>nsequences.Commercial offices are most often finished to Category 'A' or 'Developers' fit out which will typically include full fit out of toilets, and circlation space and includes background fit out of the main office areas. Category 'B' fitting out takes the building from Category'A'finishings to full <strong>co</strong>mpletion, ready for the tenants to move in.


AVERAGE COSTS AT 3RD QUARTER 2006 PRICE LEVELS<strong>Costs</strong> per m2 gross floor area<strong>Costs</strong> per sq ft gross floor areaRETAILSouth East,Outer LondonInner LondonLondon PostalDistrictsSouth West,East AngliaY & H,North West,Northern,E & W Midlands,S<strong>co</strong>tland,WalesNorthern Ireland£/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2£ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ftSupermarket shells - small(10,-20,000 sq ft)Retail warehousesShop units (shells only)- medium (30-45,000 sq ft)- Landlords back-upRetail fit outs - Supermarkets- out-of-town (80 - 100,000 sq ft)Shopping centres - Retail areas (shells only)- Malls - Comfort <strong>co</strong>oled- Electrical Retailers- Clothing - Mass Market- Clothing - Fashion- Department Stores- Retail bank (excl ATMs)- Retail bank (incl ATMs)- Retail bank fit out - (incl ATMsand shopfronts)600 -838 618 -863 684 -956 654 -914 558 -780 534 -746 522 -729 510 -713 384 -53656 -78 57 -80 64 -89 61 -85 52 -72 50 -69 48 -68 47 -66 36 -50557 -777 574 -801 635 -886 607 -847 518 -723 496 -692 485 -676 474 -661 357 -49852 -72 53 -74 59 -82 56 -79 48 -67 46 -64 45 -63 44 -61 33 -46538 -713 554 -734 613 -812 586 -777 500 -663 479 -634 468 -620 457 -606 344 -45650 -66 51 -68 57 -75 54 -72 46 -62 44 -59 43 -58 42 -56 32 -42434 -628 447 -647 495 -716 473 -685 404 -584 386 -559 378 -547 369 -534 278 -40240 -58 42 -60 46 -67 44 -64 37 -54 36 -52 35 -51 34 -50 26 -37620 -707 638 -729 707 -806 676 -771 576 -658 552 -630 539 -615 527 -601 397 -45358 -66 59 -68 66 -75 63 -72 54 -61 51 -58 50 -57 49 -56 37 -42620 -707 638 -729 707 -806 676 -771 576 -658 552 -630 539 -615 527 -601 397 -45358 -66 59 -68 66 -75 63 -72 54 -61 51 -58 50 -57 49 -56 37 -42842 -972 867 -1,001 960 -1108 918 -1059 783 -904 750 -865 733 -845 716 -826 539 -62278 -90 81 -93 89 -103 85 -98 73 -84 70 -80 68 -79 67 -77 50 -581,852 -3,086 1,907 -3,179 2111 -3518 2018 -3364 1722 -2870 1648 -2746 1611 -2685 1574 -2623 1185 -1975172 -287 177 -295 196 -327 187 -312 160 -267 153 -255 150 -249 146 -244 110 -1831,296 -1,749 1,334 -1,802 1477 -1994 1412 -1906 1205 -1627 1153 -1557 1127 -1522 1101 -1487 829 -1119120 -162 124 -167 137 -185 131 -177 112 -151 107 -145 105 -141 102 -138 77 -104542 -985 558 -1,015 618 -1123 591 -1074 504 -916 482 -877 472 -857 461 -838 347 -63150 -92 52 -94 57 -104 55 -100 47 -85 45 -81 44 -80 43 -78 32 -59686 -1,440 707 -1,483 782 -1642 748 -1570 638 -1339 611 -1282 597 -1253 583 -1224 439 -92264 -134 66 -138 73 -153 69 -146 59 -124 57 -119 55 -116 54 -114 41 -86967 -1,749 996 -1,801 1102 -1994 1054 -1906 899 -1626 861 -1556 841 -1521 822 -1486 619 -111989 -161 92 -166 101 -183 97 -175 83 -150 79 -143 77 -140 76 -137 57 -1031,276 -2,366 1,314 -2,437 1454 -2697 1390 -2579 1186 -2200 1135 -2106 1110 -2058 1084 -2011 816 -1514118 -220 122 -226 135 -251 129 -240 110 -204 105 -196 103 -191 101 -187 76 -1411,283 -1,412 1,321 -1,455 1462 -1610 1398 -1539 1193 -1313 1142 -1257 1116 -1229 1090 -1200 821 -904119 -131 123 -135 136 -150 130 -143 111 -122 106 -117 104 -114 101 -112 76 -841425 -1555 1,468 -1,602 1625 -1773 1554 -1695 1326 -1446 1269 -1384 1240 -1353 1212 -1322 912 -995132 -144 136 -149 151 -165 144 -157 123 -134 118 -129 115 -126 113 -123 85 -921658 -1788 1,708 -1,842 1891 -2038 1808 -1949 1542 -1663 1476 -1591 1443 -1556 1410 -1520 1061 -1144154 -166 159 -171 176 -189 168 -181 143 -154 137 -148 134 -145 131 -141 99 -106<strong>Costs</strong> exclude Externals. Click here for indicative figures for the additional <strong>co</strong>sts of External Works© Paul Moore for EC HarrisNotes:-Shop units and retail units in shopping centres will usually be developed as shells with no finishes or fittings and with services to main distribution units only. <strong>Costs</strong> for malls assume minimal wall finishes since the majority of potential wall finishes will be thefrontages to the shop units.


AVERAGE COSTS AT 3RD QUARTER 2006 PRICE LEVELS<strong>Costs</strong> per m2 gross floor area<strong>Costs</strong> per sq ft gross floor areaHEALTHSouth East,Outer LondonInner LondonLondon PostalDistrictsSouth West,East AngliaY & H,North West,Northern,E & W Midlands,S<strong>co</strong>tland,WalesNorthern Ireland£/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2£ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ftGeneral hospitalsCommunity Hospitals / Mental Care UnitsHealth Centres / Primary Care FacilitiesResidential Care FacilitiesNursing homes / Hospices1800 -2453 1854 -2527 2052 -2797 1962 -2674 1674 -2282 1602 -2183 1566 -2134 1530 -2085 1267 -1727167 -228 172 -235 191 -260 182 -248 156 -212 149 -203 145 -198 142 -194 118 -1601156 -1852 1191 -1907 1318 -2111 1260 -2018 1075 -1722 1029 -1648 1006 -1611 983 -1574 814 -1304107 -172 111 -177 122 -196 117 -187 100 -160 96 -153 93 -150 91 -146 76 -1211126 -1996 1160 -2055 1284 -2275 1228 -2175 1048 -1856 1002 -1776 980 -1736 957 -1696 721 -1277105 -185 108 -191 119 -211 114 -202 97 -172 93 -165 91 -161 89 -158 67 -119896 -1091 923 -1124 1021 -1244 977 -1190 833 -1015 797 -971 780 -950 762 -928 573 -69983 -101 86 -104 95 -116 91 -111 77 -94 74 -90 72 -88 71 -86 53 -651046 -1444 1078 -1488 1193 -1646 1140 -1574 973 -1343 931 -1285 910 -1256 889 -1228 670 -92497 -134 100 -138 111 -153 106 -146 90 -125 86 -119 85 -117 83 -114 62 -86<strong>Costs</strong> exclude Externals. Click here for indicative figures for the additional <strong>co</strong>sts of External Works© Paul Moore for EC HarrisNotes:-<strong>Costs</strong> above asssume traditional procurement. Where schemes ae procured under ProCure 21, <strong>co</strong>sts may be 4 - 6% higher. Where procured under PFI/LIFT procurement, <strong>co</strong>sts may be 6- 8% higher, reflecting in part the higher level of specification in PFI/LIFTtype schemes


AVERAGE COSTS AT 3RD QUARTER 2006 PRICE LEVELS<strong>Costs</strong> per m2 gross floor area<strong>Costs</strong> per sq ft gross floor areaLEISURESouth East,Outer LondonInner LondonLondon PostalDistrictsSouth West,East AngliaY & H,North West,Northern,E & W Midlands,S<strong>co</strong>tland,WalesNorthern Ireland£/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2£ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ftRestaurants - shells (for fast food outlets)Restaurant / Food <strong>co</strong>urt - fit out (incl equip)<strong>Public</strong> house - shell only<strong>Public</strong> house - refurbishmentTheatres - small - (incl seats and fitting out)Multi-screen cinemas (shell only)Sports / Leisure centres (dry sports)Swimming /leisure PoolsCommunity Centres803 -1036 827 -1068 916 -1182 876 -1130 747 -964 715 -922 699 -902 683 -881 514 -66375 -96 77 -99 85 -110 81 -105 69 -90 66 -86 65 -84 63 -82 48 -622203 -3109 2269 -3203 2511 -3545 2401 -3389 2048 -2892 1960 -2767 1916 -2705 1872 -2643 1410 -1990205 -289 211 -298 233 -329 223 -315 190 -269 182 -257 178 -251 174 -246 131 -185700 -976 721 -1005 798 -1112 763 -1063 651 -907 623 -868 609 -849 595 -829 448 -62465 -91 67 -93 74 -103 71 -99 60 -84 58 -81 57 -79 55 -77 42 -58751 -1140 774 -1174 857 -1300 819 -1243 699 -1060 669 -1015 654 -992 639 -969 481 -73070 -106 72 -109 80 -121 76 -115 65 -99 62 -94 61 -92 59 -90 45 -681555 -2073 1601 -2135 1772 -2363 1695 -2260 1446 -1928 1384 -1845 1353 -1803 1322 -1762 995 -1327144 -193 149 -198 165 -220 157 -210 134 -179 129 -171 126 -168 123 -164 92 -123648 -1036 667 -1068 738 -1182 706 -1130 602 -964 577 -922 564 -902 551 -881 415 -66360 -96 62 -99 69 -110 66 -105 56 -90 54 -86 52 -84 51 -82 39 -621234 -1543 1271 -1589 1407 -1759 1345 -1682 1148 -1435 1099 -1373 1074 -1342 1049 -1312 790 -988115 -143 118 -148 131 -163 125 -156 107 -133 102 -128 100 -125 97 -122 73 -921651 -1800 1700 -1854 1882 -2052 1799 -1962 1535 -1674 1469 -1602 1436 -1566 1403 -1530 1056 -1152153 -167 158 -172 175 -191 167 -182 143 -156 136 -149 133 -145 130 -142 98 -107943 -986 972 -1016 1075 -1124 1028 -1075 877 -917 839 -878 821 -858 802 -838 604 -63188 -92 90 -94 100 -104 96 -100 81 -85 78 -82 76 -80 74 -78 56 -59<strong>Costs</strong> exclude Externals. Click here for indicative figures for the additional <strong>co</strong>sts of External Works© Paul Moore for EC HarrisNotes:<strong>Costs</strong> of cinemas and restaurants are for shell developments only for subsequent fitting out. It should be noted that internal walls and auditorium flooring is often installed by the developer for the operator, but at the operator's expense. This <strong>co</strong>st has therefore been<strong>Costs</strong> exclude External Works. For indications of the additional <strong>co</strong>sts of External Works see Page 5excluded from the rates shown above.The huge range in specification of restaurants mean that fit out <strong>co</strong>sts can very easily fall outside the range shown.<strong>Costs</strong> of dry sports /leisure centres are for 'leisure centre' type schemes including main sports hall hall, ancilliary sports facilities, changing and showers, restaurant / cafe, bar, etc


AVERAGE COSTS AT 3RD QUARTER 2006 PRICE LEVELS<strong>Costs</strong> per m2 gross floor area<strong>Costs</strong> per sq ft gross floor areaRESIDENTIALSouth East,Outer LondonInner LondonLondon PostalDistrictsSouth West,East AngliaY & H,North West,Northern,E & W Midlands,S<strong>co</strong>tland,WalesNorthern IrelandHousing - 2/3 storey, Housing Assoc standard- 'speculative' estate housing- high quality, private detached- luxury (incl interior design and fit out,swimming pool, etc)- luxury refurbishmentFlats (apartments) - Housing Assoc standardSheltered HousingStudents' Residences-private high standardprivate luxury£/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2 £/m2£ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft £ per sq ft777 -1185 801 -1221 886 -1351 847 -1292 723 -1103 692 -1055 676 -1031 661 -1008 498 -75972 -110 74 -113 82 -126 79 -120 67 -102 64 -98 63 -96 61 -94 46 -70764 -1185 787 -1221 871 -1351 833 -1292 711 -1103 680 -1055 665 -1031 650 -1008 489 -75971 -110 73 -113 81 -126 77 -120 66 -102 63 -98 62 -96 60 -94 45 -701095 -1521 1128 -1566 1249 -1733 1194 -1657 1019 -1414 975 -1353 953 -1323 931 -1292 701 -973102 -141 105 -146 116 -161 111 -154 95 -131 91 -126 89 -123 86 -120 65 -902139 -3215 2203 -3312 2439 -3665 2332 -3504 1989 -2990 1904 -2861 1861 -2797 1818 -2733 1369 -2058199 -299 205 -308 227 -341 217 -326 185 -278 177 -266 173 -260 169 -254 127 -1911244 -2559 1281 -2636 1418 -2917 1356 -2789 1157 -2380 1107 -2277 1082 -2226 1057 -2175 796 -1638116 -238 119 -245 132 -271 126 -259 107 -221 103 -212 101 -207 98 -202 74 -152836 -1185 861 -1221 953 -1661 911 -1292 777 -1103 744 -1055 727 -1031 710 -1008 535 -75978 -110 80 -113 89 -154 85 -120 72 -102 69 -98 68 -96 66 -94 50 -701049 -1535 1081 -1581 1196 -2212 1144 -1673 976 -1428 934 -1366 913 -1336 892 -1305 672 -98397 -143 100 -147 111 -206 106 -155 91 -133 87 -127 85 -124 83 -121 62 -911645 -2695 1695 -2776 1876 -3548 1794 -2937 1530 -2506 1464 -2398 1432 -2345 1399 -2291 1053 -1725153 -250 157 -258 174 -330 167 -273 142 -233 136 -223 133 -218 130 -213 98 -160816 -1011 841 -1041 931 -1152 890 -1102 759 -940 726 -899 710 -879 694 -859 522 -64776 -94 78 -97 86 -107 83 -102 71 -87 67 -84 66 -82 64 -80 49 -60933 -1399 961 -1441 1063 -1595 1017 -1525 868 -1301 830 -1245 812 -1217 793 -1189 597 -89687 -130 89 -134 99 -148 94 -142 81 -121 77 -116 75 -113 74 -110 55 -83<strong>Costs</strong> exclude Externals. Click here for indicative figures for the additional <strong>co</strong>sts of External Works© Paul Moore for EC Harris


AVERAGE COSTS AT 3RD QUARTER 2006 PRICE LEVELS<strong>Costs</strong> per roomHOTELSSouth East,Outer LondonInner LondonLondon PostalDistrictsSouth West,East AngliaY & H, NorthWest, Northern,E & W Midlands,S<strong>co</strong>tland,WalesNorthern IrelandCost per room Cost per room Cost per room Cost per room Cost per room Cost per room Cost per room Cost per room Cost per roomHotel - 5 star city centre -per room 177,000 -225,000 182,000 -232,000 202,000 -257,000 193,000 -245,000 165,000 -209,000 158,000 -200,000 154,000 -196,000 151,000 -191,000 113,000 -144,000- 4 star city centre -per room 115,000 -136,000 118,000 -140,000 131,000 -155,000 125,000 -148,000 107,000 -126,000 102,000 -121,000 99,700 -118,000 97,000 -115,000 73,300 -87,000- 3 star aparthotel - per room 94,000 -111,000 97,000 -114,000 107,000 -127,000 103,000 -121,000 88,000 -103,000 84,000 -99,000 81,900 -97,000 80,000 -94,000 60,300 -71,000- 2 star budget / provincial - per room 40,000 -49,000 41,000 -51,000 45,000 -56,000 43,000 -54,000 37,000 -46,000 35,000 -44,000 34,600 -43,000 34,000 -42,000 25,500 -32,000Hotel Bedroom Refurbishment- 5 star - per room 13,700 -15,600 17,000 -19,000 18,400 -21,000 17,600 -20,100 15,000 -17,100 14,400 -16,400 14,100 -16,000 14,000 -16,000 10,300 -11,800- 4 star - per room 11,700 -13,700 14,000 -17,000 15,700 -18,400 15,000 -17,600 12,800 -15,000 12,300 -14,400 12,000 -14,100 12,000 -14,000 8,800 -10,300- 3 star - per room 8,800 -11,700 11,000 -14,000 11,800 -15,700 11,300 -15,000 9,700 -12,800 9,200 -12,300 9,000 -12,000 9,000 -12,000 6,600 -8,800Furniture, Fittings and Equipment (FF&E), Operating Supplies and Equipment (OS&E)- 5 star - per room 19,000 -33,000 20,000 -34,000 21,600 -37,800 20,600 -36,200 17,600 -30,800 16,900 -29,500 16,500 -28,900 16,000 -28,000 12,100 -21,200- 4 star - per room 17,000 -26,000 18,000 -26,000 19,500 -29,200 18,700 -27,900 15,900 -23,800 15,200 -22,800 14,900 -22,300 15,000 -22,000 11,000 -16,400- 3 star - per room 6,000 -9,000 6,000 -9,000 6,500 -10,300 6,200 -9,800 5,300 -8,400 5,100 -8,000 5,000 -7,900 5,000 -8,000 3,700 -5,800<strong>Costs</strong> exclude Externals. Click here for indicative figures for the additional <strong>co</strong>sts of External Works© Paul Moore for EC Harris<strong>Costs</strong> of 4 and 5 star hotels are dependent upon the efficiency ratios of the net bedroom to gross floor area. This in turn is driven by the density of the bedrooms as a function of the meeting and ancillary ac<strong>co</strong>mmodation. <strong>Costs</strong> of 4 and 5 star hotels are also linked to theadditional bars,restaurants, <strong>co</strong>nference facilities, function rooms and ballroom facilities that are being provided, although <strong>co</strong>sts above include for dry leisure facilities only, i.e. no swimming pools.FF&E and OS&E <strong>co</strong>sts are for bedrooms only and include case goods, wall and floor <strong>co</strong>verings, de<strong>co</strong>rative lighting, soft furnishings and hotel operator’s equipment. <strong>Costs</strong> exclude bathroom fittings and FF &E to public areas, function rooms, etc. Note that the range of<strong>co</strong>sts for FF&E in 4 star hotels is very wide. A number of hotel operators (particularly those aiming at the <strong>co</strong>rporate market) brand their hotels as 4 star but with 5 star finishes.Exclusions:- <strong>Costs</strong> exclude professional fees which will typically be around 12 - 15%. All room <strong>co</strong>sts exclude FF&E which are given separately. Refurbishment <strong>co</strong>sts exclude Mechanical and Electrical infrastructure <strong>co</strong>sts.


CIVIL ENGINEERING COSTS(July 2006)The outline <strong>co</strong>sts for roads, bridges and other structures, below, have<strong>co</strong>me from the work that that EC Harris has been carrying out with theHighways Agency. Note that the figures <strong>co</strong>me from an analysis of theHighways Agency’s data on trunk roads in England and reflect real life<strong>co</strong>nditions; they have not been built up from first principles, and thereare some cases where the figures show some surprising answers.<strong>Costs</strong> are given for the more <strong>co</strong>mmon forms of road and for the more<strong>co</strong>mmon bridges and associated structures.Rates generally are given per linear metre run of roads, including allwork to carriageways, verges, etc. The <strong>co</strong>sts for bridges are given perm2 of deck area. The bridge <strong>co</strong>sts are categorized by number of spansas this was found to be the most <strong>co</strong>sts significant design item.All rates are inclusive of preliminaries but exclusive design, planningand supervision, and VAT. The rates shown are National rates. TheNational Statistics Office produces a Tender Price Index of RoadConstruction (ROADCON INDEX), which includes location factorswhich can be applied to road <strong>co</strong>sts. Details of these indices can besupplied if required.Note that only a small, representative sample of the Highways Agency<strong>co</strong>st data is shown, more information can be provided on request.Note that the Highways Agency updates their figures using the ROCOS(Resource Cost Index of Road Construction) index. The <strong>co</strong>sts in thispublication have been updated using the latest ROCOS ‘Combined’index figure of 163 for 4th Quarter 2005._____________________________________________________________________________________________Cost Research Department (July 2006)© Paul Moore for EC Harris


COSTS OF TRUNK ROADS AND MOTORWAYS<strong>Costs</strong> at 1st Qtr 2006ReferenceSingleor DualNo ofLanesRoad TypeA' class orMotorwayUrban orRuralRates per linearmetre (rounded tonearest £25)£25S2AR S 2 A R £2,750S2AU S 2 A U £3,050S3AR S 3 A R £3,225S3AU S 3 A U £3,825S4AR S 4 A R £3,675S4AU S 4 A U £4,675D2AR D 2 A R £4,125D2AU D 2 A U £4,600D3AR D 3 A R £4,975D3AU D 3 A U £5,900D4AR D 4 A R £5,825D4AU D 4 A U £7,450D2MR D 2 M R £5,325D2MU D 2 M U £5,575D3MR D 3 M R £6,200D3MU D 3 M U £6,400D4MR D 4 M R £7,025D4MU D 4 M U £7,200Notes: 'R' or 'U' means Rural or Urban design standard, not specificallylocation, although urban roads have less verge.Note that when referring to the number of lanes in a dual carriageway itis the number of lanes in each carriageway i.e. S2AR is a singlecarriageway road of a rural design standard class A road with two lanesin total; D2AR is a dual carriageway road of a rural design standard Aclass road with two lanes in each direction, that is four lanes in total._____________________________________________________________________________________________Cost Research Department (July 2006)© Paul Moore for EC Harris


COSTS OF BRIDGESType of BridgeClassifed byNumber ofspans<strong>Costs</strong> at 1st Qtr 2006National rates per m2of deck area (Roundedto the nearest £25)Overbridge 1 £5,200Overbridge 2 £4,250Overbridge 3 £2,700Overbridge 4 & above £2,125Underbridge 1 £5,050Underbridge 2 £3,550Underbridge 3 £2,100Underbridge 4 & above £2,050Footbridge 2 £4,625Large culvert 1 £2,425Railway overbridge 1 £7,100Railway overbridge 2 £4,250Railway overbridge 3 £3,775Railway overbridge 4 & above £3,300Pedestrian subway 1 £6,150OTHER STRUCTURES<strong>Costs</strong> at 1st Qtr 2006Type of Structure Unit National ratesRetaining WallsAverage height Metre run £4,100CulvertsBrick/Masonry/Stone Metre run £7,900Concrete Box Metre run £7,900Corrugated Steel Metre run £3,800Gantries in length bands< 10 m Each £107,10010 - 20 m Each £183,20020 - 30 m Each £253,20030 - 40 m Each £342,80040 - 50 m Each £449,90050 - 60 m Each £557,100Note:- All rates are inclusive of preliminaries but exclusive of design, planningand supervision, and VAT._____________________________________________________________________________________________Cost Research Department (July 2006)© Paul Moore for EC Harris