10.07.2015 Views

(ISWMP) and Allotment Garden in the Barangay Gusa (PDF 1.20MB

(ISWMP) and Allotment Garden in the Barangay Gusa (PDF 1.20MB

(ISWMP) and Allotment Garden in the Barangay Gusa (PDF 1.20MB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6re-implementation of <strong>the</strong> briefly foregone projects called for <strong>the</strong> creation of <strong>the</strong><strong>Barangay</strong> Health <strong>and</strong> Environmental Brigade (BHEB), a conglomerate ofcommitted community dwellers who took to <strong>the</strong> responsibility of collect<strong>in</strong>grecyclables <strong>and</strong> manag<strong>in</strong>g <strong>the</strong> Materials Recovery Facility (MRF) at Sitio Dao,Purok 3. Biodegradable refuse from <strong>the</strong> pilot puroks 6 <strong>and</strong> 7, <strong>and</strong> those from <strong>the</strong>expansion puroks 4 <strong>and</strong> 5 ended up at this MRF for fur<strong>the</strong>r h<strong>and</strong>l<strong>in</strong>g as compost.First h<strong>and</strong> as support group to <strong>the</strong> project <strong>and</strong> community organizers were<strong>the</strong> <strong>Barangay</strong> Council <strong>and</strong> <strong>the</strong> L-EPM managers Such close coord<strong>in</strong>ationbetween <strong>the</strong> <strong>Gusa</strong> LGU <strong>and</strong> <strong>the</strong> city government was also key to <strong>the</strong> successfulimplementation of <strong>the</strong> barangay’s <strong>ISWMP</strong>.The Big Garbage Pay-OffThe <strong>ISWMP</strong> completed four years of implementation with results that areas vivid as <strong>the</strong> objectives that <strong>the</strong>y started out with. The accomplishment of <strong>the</strong>seis a primary <strong>in</strong>dicator of <strong>the</strong> project results.‣ Improved household segregation, separate collection <strong>and</strong> transport ofwaste from pilot puroks 4, 5, 6, <strong>and</strong> 7.In keep<strong>in</strong>g with RA 9003, segregation at source was realized perhousehold. S<strong>in</strong>ce <strong>the</strong> community was <strong>in</strong>volved <strong>in</strong> <strong>the</strong> policy-mak<strong>in</strong>g, keep<strong>in</strong>g to<strong>the</strong> action plan <strong>and</strong> penalty system was unswerv<strong>in</strong>g. Separate collection <strong>and</strong>transportation of waste materials are achieved. The “No dump truck=no garbageoutside <strong>the</strong> household” rule was strictly observed. Biodegradable waste collectionis scheduled on Mondays <strong>and</strong> Fridays only while recyclables <strong>and</strong> residuals arecollected from <strong>the</strong> puroks on separate dates.‣ Produced, utilized, <strong>and</strong> marketed compostIn l<strong>in</strong>e with <strong>the</strong> implementers’ vision of progress, <strong>in</strong>come was generatedfor <strong>the</strong> cooperative h<strong>and</strong>l<strong>in</strong>g <strong>the</strong> MRF. Five hundred sacks of compost were solddur<strong>in</strong>g a recent open house. The rest of which fertilizes <strong>the</strong> n<strong>in</strong>e 1X20 sq. m bedsof pechay, eggplants <strong>and</strong> kangkong. O<strong>the</strong>r than <strong>the</strong> vegetable produce, <strong>the</strong>community organizers also came up with a “Kabulakan Festival” to showcaseornamental flora fertilized by <strong>the</strong> compost. The follow<strong>in</strong>g figures mark <strong>the</strong>ir 2005<strong>in</strong>come:Compost from Biodegradables- PhP 27, 000.00 <strong>in</strong> 5 monthsRecyclables-PhP 3, 000 every 45 daysVegetables from plot garden-PhP 28, 000 <strong>in</strong> 8 months‣ Enhanced relations between <strong>the</strong> LGU <strong>and</strong> <strong>the</strong> communityThe LEPM process of identification, prioritization of relevant issues,participatory plann<strong>in</strong>g <strong>and</strong> implementation mobilized <strong>the</strong> direct beneficiarieswith<strong>in</strong> <strong>and</strong> around <strong>the</strong> area <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> <strong>in</strong>dustries, <strong>and</strong> local <strong>and</strong> national

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!