10.07.2015 Views

Assessing Technical and Economic Recovery of Oil Resources

Assessing Technical and Economic Recovery of Oil Resources

Assessing Technical and Economic Recovery of Oil Resources

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ase. Application <strong>of</strong> “next generation” CO 2 -EOR oil recoverytechnologies, as examined in our recently completed report, “EvaluatingThe Potential For “Game Changer” Improvements In <strong>Oil</strong> <strong>Recovery</strong>Efficiency From CO 2 Enhanced <strong>Oil</strong> <strong>Recovery</strong>” 2 , would significantlyincrease recovery efficiency <strong>and</strong> the technically recoverable resource fromthe TZ/ROZ.9. Our detailed cost <strong>and</strong> economic studies show that the TZ/ROZ oilresource in these five Permian Basin oil reservoirs can beeconomically produced with CO 2 -EOR at oil prices <strong>of</strong> $35 per barrel.To examine the economics <strong>of</strong> producing the TZ/ROZ, Advanced<strong>Resources</strong> constructed an up-to-date economic <strong>and</strong> cash flow cost model<strong>and</strong> applied this model to the five study fields. The model includes costsfor deepening wells <strong>and</strong> reworking them for CO 2 -EOR, drilling newinjection <strong>and</strong> production wells (as required), <strong>and</strong> operating the project.The economic model uses an oil price <strong>of</strong> $35 per barrel, a CO 2 purchasecosts (per Mcf) <strong>of</strong> 4% <strong>of</strong> the oil price <strong>and</strong> a CO 2 recycling cost (per Mcf) <strong>of</strong>1% <strong>of</strong> the oil price. A 25% (pre-tax) rate <strong>of</strong> return (ROR) economicthreshold is used to account for the higher risk nature <strong>of</strong> pursuing theTZ/ROZ resource.Detailed economic analysis <strong>of</strong> the Wasson Denver Unit San Andres oilreservoir shows that while the main pay zone CO 2 flood (conductedseparately) exceeds the ROR economic threshold, the TZ/ROZ flood(conducted separately) does not. However, when these two reservoirunits are CO 2 flooded jointly, the overall MPZ+TZ/ROZ flood has a RORthat exceeds the economic threshold. This is due to inherent inefficiencies<strong>of</strong> separately flooding the TZ/ROZ, leading to higher operating <strong>and</strong> CO 2purchase costs <strong>and</strong> lower recoverable oil.2 “Evaluating The Potential For “Game Changer” Improvements In <strong>Oil</strong> <strong>Recovery</strong> Efficiency From CO 2Enhanced <strong>Oil</strong> <strong>Recovery</strong>”, Advanced <strong>Resources</strong> International for U.S. Department <strong>of</strong> Energy (February2006).EX-6 February 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!