10.07.2015 Views

tankers calling at fujairah spm terminals ... - Port Of Fujairah

tankers calling at fujairah spm terminals ... - Port Of Fujairah

tankers calling at fujairah spm terminals ... - Port Of Fujairah

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.6 Buoy Piping SystemDesign pressure : 225 psiTurret piping : 2x24”Turret product valves : 2x24”Swivel : 1x36” + 1x24”Buoy body piping : 2x24”Buoy body product valves : 3x24”5.7 Flo<strong>at</strong>ing Hose SystemStrings : 1Size : 20”/16”Hose length : 35 ft. or 40 ft.(total lengthapproxim<strong>at</strong>ely 250 meter)Pressure r<strong>at</strong>ing : 225 psiEffected Charts: Admiralty Charts 3709 & 3727.2. ADCO <strong>Fujairah</strong> Terminal SPMsThe ADCO <strong>Fujairah</strong> Terminal is loc<strong>at</strong>ed offshore <strong>Fujairah</strong>, some 4 nauticalmiles from nearest shoreline. It is connected to the onshore facilities <strong>at</strong><strong>Fujairah</strong> vide three (3) 48” sea lines; each sea line from the shore termin<strong>at</strong>es<strong>at</strong> Pipeline End Manifold (PLEM) <strong>at</strong> various depths and forms part ofC<strong>at</strong>enary Anchor Leg Mooring (CALM) Single Point Mooring (SPM)system.Version No. 2 / D<strong>at</strong>e : 01.04.2012 Revision No. 6/ 29.05.2012 Page 31 |6 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!