10.07.2015 Views

tankers calling at fujairah spm terminals ... - Port Of Fujairah

tankers calling at fujairah spm terminals ... - Port Of Fujairah

tankers calling at fujairah spm terminals ... - Port Of Fujairah

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

o) Once the chafing chain in the chain stopper, tanker head way is to bereduced to zero speed over ground with SPM mooring hawser justclear from the w<strong>at</strong>er then the tanker is then considered all fast.p) Mooring assembly should not be allowed to come under tension duringmooring oper<strong>at</strong>ion and after all fast.q) Control tower to be advised with all fast time.r) Mooring Tug Bo<strong>at</strong> become free and to proceed to hoses to hold onehose.s) When the Pilot s<strong>at</strong>isfies from the tanker position and there is ship’sseaman with good communic<strong>at</strong>ion <strong>at</strong> the forecastle to report SPMposition to the bridge, Pilot can request from the L/M to proceed to themanifold for hoses connections.t) Assistant tug to make fast astern of the tanker with tug’s line and pullin minimum speed or as required from the Pilot.u) Connecting hoses will be under supervision of SPM Terminal’s LMand his responsibility.v) Pilot to request from the closer working tug to bring the first hose andafter connecting to the crane hook, tug can be released.w) On connection of the first hose and once the lifting wire of the secondhose is connected to ship’s hook, second mooring bo<strong>at</strong> can then bereleased as per Pilot’s orderx) Pilot will request from ship’s Master to have 24 hours responsibleofficer duty in the bridge.y) L/M of SPM Terminal on board the tanker will observe the tanker crewwho will run loading oper<strong>at</strong>ion.z) L/M will be responsible for loading oper<strong>at</strong>ion and will observe safetyon board the tanker on regular basis..4. Un-berthing:a) L/M to inform Pilot two hour before completion of loading to informPoF Control Tower to get the working tugs ready for unmooring.b) Pilot and Ship’s Master to be in the bridge, Pilot to get the sailing draftand test ship’s engine, rudder and confirm from the master th<strong>at</strong> the shipis ready for manoeuvre.Version No. 2 / D<strong>at</strong>e : 01.04.2012 Revision No. 6/ 29.05.2012 Page 43 |6 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!