10.07.2015 Views

tankers calling at fujairah spm terminals ... - Port Of Fujairah

tankers calling at fujairah spm terminals ... - Port Of Fujairah

tankers calling at fujairah spm terminals ... - Port Of Fujairah

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. Safetya) Care must be taken to ensure th<strong>at</strong> personnel do no stand in positions inwhich they could be injured by a parting messenger / rope.c) It is essential th<strong>at</strong> good communic<strong>at</strong>ion system between bridge andbow is established and maintained (by U.H.F Channel).d) Means provided to permit the quick and safe release of the ship in caseof need in an emergency must be clearly identified and regularlychecked (engine readiness, fire wire, breakaway coupling, etc.)e) Crew member should be posted permanently forward <strong>at</strong> all times toobserve the mooring and to advise if the tanker starts to ride up theSPM or yaw excessively.f) During periods of non availability of Escort tug to tow on the stern ofthe tanker ship’s engines to be ready <strong>at</strong> all times with pilot <strong>at</strong>tending <strong>at</strong>the forecastle for close observ<strong>at</strong>ion of vessel’s relevant position to theSPM.g) Upon completion of cargo oper<strong>at</strong>ions and hose disconnection andwhen second hose is in w<strong>at</strong>er, pilot is to instruct tender bo<strong>at</strong> to checkhoses blind flanges for any signs of leaks and report same.h) If Pilot in doubt th<strong>at</strong> vessel have come in contact with SPM or flo<strong>at</strong>ingassemblies, DO NOT proceed with the next oper<strong>at</strong>ion prior toinforming all concerned and ensuring berth is safe for tanker berthingload and loading.i) During windy conditions tanker messenger line to be connected tomonkey fist for stable condition.j) On completion of mooring, L/M is to ensure pickup rope is free on thewinch drum and ready to safely let go.k) Ship engine to be ready from bridge within 5 to 10 minutes.l) One responsible officer to be ready <strong>at</strong> bridge all time.l) Inform <strong>Port</strong> Control Tower immedi<strong>at</strong>ely if tanker has oil pollution orfire.Version No. 2 / D<strong>at</strong>e : 01.04.2012 Revision No. 6/ 29.05.2012 Page 45 |6 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!