10.07.2015 Views

Project Appraisal Document - IHDP

Project Appraisal Document - IHDP

Project Appraisal Document - IHDP

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SRI LANKA: PUTTALAM HOUSING PROJECTAnnex 3: Results Framework and MonitoringResults FrameworkPDO Outcome Indicators Use of Outcome InformationPuttalam Housing <strong>Project</strong>would help integrate the IDPsin Puttalam. It would provide:(i) cash grants to identifiedIDP households to construct or7,885 beneficiary householdshave a habitable home.Percent population in projectarea with access to safe andMeasure long term socioeconomicimpact of the PHP.Assess integration of IDPs intheir preferred location ofchoice.complete their houses; and (ii)provide IDPs and selectedadjacent non-IDP communitieswith access to drinking water,sanitation and environmentmanagement.functioning water supply andsanitation system at closeproximity to household.Intermediate Results Results Indicators for Each Use of Results MonitoringOne per Component ComponentComponent One:Component One:Component One:Identified beneficiaryhouseholds build/completehouses in the allocated amountof time and to specifiedtechnical standards.Component Two:34 water supply systems andsanitation schemes installed ina cost effective manner in 136IDP camps and identified non-IDP settlements.Internal roads surfaced as partof environment managementfor better drainage and floodcontrol in refugee camps.Number of houses inidentified areas constructedwithin a six month time periodand within allocated budget(Rs 250,000 or Rs 100,000).Percentage of cash grantsdisbursed within the six monthperiod and during eachdisbursement phase (i.e.purchase of material;completion of foundation,superstructure and overallcore-house).Component Two:Number and type of systeminstalled.Percentage access to safewater within 200m of thefamily home.Kilometers of roads surfaced.Kilometers of roads in goodcondition in 4 th year of PHP.Year 1-4: Low levels point tocapacity constraints and theneed to address that. Thiswould highlight the need toaddress shortfalls in materialssupply, shortage of skilled andsemi-skilled labor, or capacityconstraints to achieve thedesired target and outcome.Component Two:Year 1-4: Low percentageflags insufficient availabilityof potable water, poorplanning or institutionalcapacity constraints. This willneed to be investigated andremedied.Year 1-3: Low percentageflags institutional capacityconstraints or sidelining ofneed for environmentimprovement.27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!