SUITE 5259 479-636-50041805 N 2ND STJOB NO.:WEL14140800-321-8721KEYNOTESREFRIGERATION NOTES15.60115.603SLOPE REFRIGERATION LINES BACKTO COMPRESSORS AT 1" PER 20' OF RUN. LOCATE HIGHESTPOINT OF REFRIGERATION LINES JUST BELOW BOTTOMCHORD OF JOIST OR BEAM. COORDINATE ELEVATION TOAVOID CONFLICTS WITH DUCTWORK,LIGHTING, ETC.AT ALL POINTS WHERE SUCTIONLINES RISE, PROVIDE A SUCTIONLINE TRAP AT THE BASE OF THERISER.1. PLAN INDICATES GENERAL ROUTING OFREFRIGERANT LINES, WITH A SINGLELINE SHOWN INDICATING BOTHSUCTION AND LIQUID LINE ROUTINGFOR EACH SYSTEM.2. REFRIGERATION SYSTEM INSTALLATIONSHALL BE IN COMPLETE CONFORMANCEWITH SPECIFICATIONS, AND WITH ALLREQUIREMENTS OF REFRIGERATIONEQUIPMENT MANUFACTURER.ROGERS, AR 72756 DESIGNED BY:INSTALL INTERMEDIATESUCTION TRAPS OUT OFCUSTOMER VIEW AT AMINIMUM OF 7'-0"AFFFOR RISERS OVER 16'-0"REFRIGERATEDCASE TYPBASE TRAPLIQUID LINETYPSUCTIONLINETYPREFRIGERANT LINESSPACED 4" OCTYP5INTERMEDIATE SUCTION LINE TRAPNTS 11.30.01 MR05LOADS MUST BEHUNG WITHIN 3"OF PANEL POINTSBOTTOM OFSTRUCTURESUCTION LINEPIPING INSULATION43"MAX1 5/8"x1 5/8" GALVANIZEDUNISTRUT P-1000, 10'-0"MAXIMUM ON CENTERSTOP BEAMCLAMP TYPNOTE: FOR OVERHEAD LINES, UNISTRUT HORIZONTAL, TRAPEZE HUNGFOR PIPING BEHIND CASES, UNISTRUT VERTICAL, WALL-MOUNTEDNYLON WIRE TIE (PAN DUIT(TYPICAL)#BT4LH-1 OR EQUIVALENT)TOP CHORD OF JOISTROOFTIGHTHORIZONTAL REFRIGERANTLINE SUPPORT DETAILNTS06/01/07 HMR03TOUNISTRUTTHREADED RODTYPSCHEDULE 40 PVC PIPEAT EACH NYLON WIRE TIE,APPROX 10" LONG (INNERDIAMETER OF PVC PIPEAPPROX. SAME AS OD OFINSULATION)LIQUID LINEPIPING INSULATIONBOLTWALL OR BUILDING STRUCTUREPVC JACKET FOR ALL REFRIGERATION LINES EXTERIOR TO BUILDING TYPPIPING INSULATION (BEYOND){ELEVATION}{PLAN}CUSH-A-CLAMP FIRMLY CLAMPED TO PIPETYP1 5/8"x1 5/8" GALVANIZED UNISTRUT P-1000, 10'-0" MAXIMUM ON CENTERS3VERTICAL REFRIGERANT LINE SUPPORTNTS 06.29.01 MR0415.60915.61015.61215.614PROVIDE PVC DRAIN LINE FROM EACHCASE DRAIN CONNECTION SAME SIZEAS CASE OUTLET, AND END OVERFLOOR DRAIN W/AIR GAP; PITCHDRAINS 1" PER 10'.PROVIDE 0.20" PVC JACKET ON ALLREFRIGERATION LINES EXTERIOR TOBUILDING.PROVIDE INTERMEDIATE SUCTIONLINE TRAP IN WALL OR VOID SPACE.INTERMEDIATE TRAP SHOULD BEPLACED AT THE MIDPOINT OF THE SUCTION LINE RISER.UTILIZE EXISTING EXTERIOR WALLOPENING AS INDICATED WHENPOSSIBLE. IF LARGER OPENING IS REQUIRED REINFORCE THEWALL AS NECESSARY, CUT THE WALL FOR THE REFRIGERATIONPIPE PENETRATION,AND SUPPLY THE PIPE PENETRATION RAIN HOOD. SEAL THE WALLOPENING WITH FOAM AS SOON AS THE PIPING THROUGH THEWALL OPENING IS COMPLETE.3. REFRIGERATION DRAWINGS AREPROVIDEDAS AN AID TO BIDDERS AND TOINDICATE DESIRED ROUTING OFREFRIGERATION LINES; CONTRACTORSHALL ASSUME FULL RESPONSIBILITYFOR CORRECT INSTALLATION OFPIPING AND ACCESSORIES TO PROVIDEA COMPLETE AND FULLY OPERATINGSYSTEM.4. PROVIDE 1/2" ARMAFLEX PIPEINSULATION ON ALL LIQUID LINES.PROVIDE 1" ARMAFLEX PIPEINSULATION ON MEDIUM TEMP.SUCTION LINES. PROVIDE 1"ARMAFLEX INSULATION ON LOW TEMP.SUCTION LINES.5. COORDINATE REFRIGERATIONDEMOLITIONISSUES WITH THE ARCHITECTURALDRAWINGS. REFER TO ARCHITECTURALPLANS FOR REFRIGERATION EQUIPMENTDEMOLITION AND COOLER REPAIR ANDREMODELING. (RE: D1 AND A1).6. REFRIGERATION SYSTEM SHALL REMAINOPERATIONAL DURING REMODELING.DURING THE PHASING OF OLD TO NEWSYSTEMS, BOTH NEW AND OLDREFRIGERATION SYSTEMS MAY BEREQUIRED TO OPERATE AT THE SAMETIME FOR A SHORT PERIOD.7. WHERE NEW REFRIGERATED EQUIPMENTISINDICATED ON THE DRAWINGS,PROVIDE DEMOLITION, REMOVAL, ANDTEMPORARY STORAGE OF OLDEQUIPMENT PER WAL-MART MECHANICALSERVICES CONSTRUCTION MANAGER'SINSTRUCTIONS, AND REFRIGERATIONDEMO NOTES ON D1 AND A1.8. PROPERLY PUMP DOWN AND RECYCLEREFRIGERANT IN EXISTINGREFRIGERATION COMPRESSOR SYSTEMSTO BE REMOVED.9. COORDINATE REMOVAL AND DISPOSAL OFEXISTING REFRIGERATION EQUIPMENT(RACKS, EVAPORATORS, CONDENSINGUNITS, CONDENSERS, AND CASES)WITH WAL-MART MECHANICAL SERVICESCONSTRUCTION MANAGER.10.-14. NOT USED.15. EXISTING REFRIGERANT PIPING MAY BERE-USED. RE. REFRIGERATIONCONSULTANTSSTIPULATION FOR REUSEISSUE BLOCKFLORENCE, KYSTORE NO. 1510195 GENERAL REMODEL14140JOB NUMBER:1 08/04/11 ADD #1SUCTION LINE(TYPICAL)REFRIGERANT SUCTION LINESSPACED 8" O.C. MOUNTED ONUNISTRUT (TYPICAL)LIQUID LINE(TYPICAL)2GR115.6033GR115.61015.6141HALLWAY215.603 15.6123GJDGGTP195415.60912' O5DMMTD-13GR115.601GROCERY SALESC15C16D11D12D10D9 D7 D5D8 D6A13B13B11B12B10B9 B7 B5B8 B6A12D13A11A10A8A9A7A63GR15GR1D13CHECKED BY:DRAWN BY:PROTO:PROTO CYCLE:DOCUMENT DATE:06/24/1108/04/11UNISTRUTMOUNTEDTO PIPECHASESTUDSD13PIPE CHASECOMPRESSOR HOUSE #2INTERMEDIATE SUCTIONLINE TRAP (PLACE TRAPAT MIDPOINT OF RISER)UNISTRUT MOUNTING FOR REFRIGERATION LINES AND ELECTRICAL CONDUITS. DO NOT MOUNT UNISTRUT TO BACK OF CASES. BOLT TO FLOOR ONLY.MEAT COOLERSTOCKROOM-GRPRINTED: 8/4/2011 8:54 AM BY: Josh Gunlock LAST SAVED: 8/4/2011 8:54 AM BY: Jdgg:\141\14140\engineering\remodel\sheetstempjdg-ai-2011-08-04\3710 - gr1 refrigeration plans and details - 1510.dwgREFRIGERATEDCASE (TYPICAL)2BASE TRAPINTERMEDIATE SUCTION%LINE TRAP DETAILNTS06/01/07 HMR05MOUNT REFRIGERATION LINESON UNISTRUT @ 8" O. C.BOLT UNISTRUT FRAME TOFLOOR ONLY @ 10' O. C.15.612D3C17C2 C4 C6 C8C1C14C13C10C3 C5 C7 C9C11D1B13B11D2B12B10B9 B7 B5B8 B6A13A12A11A10A8 A6A9 A71%FRONT REFRIGERATION PLAN1/8"=1'-0"GR1-01FNOTE: ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A WAL-MART APPROVED CONTRACTOR.NOTE: REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO REFRIGERATION EQUIPMENT.SEPARATE CONTRACTOR IS RESPONSIBLEFOR RE-SKIN OF EXISTING REFRIGERATEDCASES TO REMAINEACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS.This document originally issued and sealed byG. E. Parsons, P.E.,License #26892on 08/04/11.This document should not be considereda certified document.REFRIGERATIONPLANS ANDSHEET:DETAILSGR11