<strong>VRIOGS</strong> <strong>010.4</strong> Revision A 17SECTION 11.0PROGRAM OF WORKSThe program of works activities shall be sequenced as follows:a) Within two weeks of the contract date, the Contractor shall supply for theDepartment’s approval, a Gantt chart showing the proposed program ofworks. The Gantt chart shall identify all tasks, duration and resources fortasks, milestones, critical path etc.b) Within three weeks of the contract date, the Contractor shall supply to theDepartment the results of the design review carried out as discussed in 9.2.c) If the construction site is an existing site, the contractor shall be trained onany operations, technical, safety or environmental aspects of the site. Thisshall take place before commencement of any work.d) Negotiation and provision of all temporary builders supply required for thesubstation construction work.e) Preparation of the site prior to carrying out any construction.f) Laying the earth grid that will eventually be below the substation building.g) Laying out the conduits and trenches.h) Construction of the substation building.i) Fit out of the building which includes electrical works such as:i). Lighting and power equipment and circuits as required,ii). Power cabling as required, andiii). Conduits as required.j) Secondary equipment installation.k) Primary equipment installation.l) Testing and Commissioning.m) Handover of all required construction documentation as specified in sectionSECTION 21.0.The Approved Program of Works of the Contract is a control document for thepurpose of the Contract. Any variation to the sequence of works or other departurefrom the Program shall require prior approval by the Department.NOTE: This document is controlled only when viewed on the DOT Engineering Standards website.Any other copy of this document is uncontrolled, and the content may not be current.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!