11.07.2015 Views

VRIOGS 010.4 RevA - Public Transport Victoria

VRIOGS 010.4 RevA - Public Transport Victoria

VRIOGS 010.4 RevA - Public Transport Victoria

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>VRIOGS</strong> <strong>010.4</strong> Revision AvSECTION 17.0 PRIMARY EQUIPMENT INSTALLATION .................................... 2517.1 Equipment Grouping...................................................................................... 2517.2 General Requirements................................................................................... 2517.3 Prohibited Material ......................................................................................... 2517.4 AC Switchgear (22kV And Signal Switchgear).............................................. 2617.5 Transformers.................................................................................................. 2617.6 Rectifier Units................................................................................................. 2717.7 1500V DC Circuit Breaker Cubicles .............................................................. 2717.8 1500V Line Isolators ...................................................................................... 27SECTION 18.0 INSTALLATION OF CABLES ....................................................... 2818.1 High Voltage Power Cables........................................................................... 2918.2 Jointing ........................................................................................................... 3018.3 Cable Identification ........................................................................................ 3118.4 Electrical Testing............................................................................................ 31SECTION 19.0 NEGATIVE BUS ............................................................................ 32SECTION 20.0 TESTING AND COMMISSIONING............................................... 33SECTION 21.0 DOCUMENTATION of ELECTRICAL WORK .............................. 3421.1 As Constructed Documentation..................................................................... 3421.2 Additional Documents.................................................................................... 34SECTION 22.0 REGULATIONS AND PUBLISHED STANDARDS ...................... 35NOTE: This document is controlled only when viewed on the DOT Engineering Standards website.Any other copy of this document is uncontrolled, and the content may not be current.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!