VRIOGS 010.4 RevA - Public Transport Victoria
VRIOGS 010.4 RevA - Public Transport Victoria
VRIOGS 010.4 RevA - Public Transport Victoria
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>VRIOGS</strong> <strong>010.4</strong> Revision A 3SCADA(Supervisory Controland Data AcquisitionSystem)SecondaryEquipmentService ChangeVRIOGTerm used to describe a system of remote control andindication of substation equipment. SCADA systems involveone or more Control rooms, communication systems andsubstation-based Remote Terminal Units.All low voltage equipment used to control, monitor andprotect the primary equipment. i.e. protection and controlrelays, battery banks & chargers, 415V switchboards, lightingetcChanges to the timetable, new trains, electrification of newand existing railway lines, extensions to existing railway linesetc that will result in an increased demand on the tractionelectrical network.The <strong>Victoria</strong>n Rail Industry Operators’ Group comprising thefollowing members:• Australian Rail Track Corporation (ARTC)• Metro Trains Melbourne• VicTrack• V/Line• Yarra Trams• <strong>Public</strong> <strong>Transport</strong> Division of the Department of <strong>Transport</strong>NOTE: This document is controlled only when viewed on the DOT Engineering Standards website.Any other copy of this document is uncontrolled, and the content may not be current.