11.07.2015 Views

GB_Bro_Image_25-1:Imagebroschüre - Hitachi Power Europe GmbH

GB_Bro_Image_25-1:Imagebroschüre - Hitachi Power Europe GmbH

GB_Bro_Image_25-1:Imagebroschüre - Hitachi Power Europe GmbH

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Bro</strong>ad range of economical turnkey plantsWalsum 10First turnkey coal power plant in Germany45Maasvlakte, Stade, Wilhelmshaven3 <strong>Power</strong>trains for the <strong>Europe</strong>an grid■ 1 x Maasvlakte, NetherlandsBituminous coal and biomass■ 1 x Stade, GermanyBituminous coal■ 1 x Wilhelmshaven, GermanyBituminous coal■ Capacity:3 x 800 MWe■ <strong>Hitachi</strong> steam turbine: 3,000 RPM; 962 MVA■ Commissioning: 3 x 2012■ Scope of supply: Delivery and engineering of allkey components such as utilitysteam generator, turbine/generatorand flue gas cleaning systemincl. DeNOx, dust removal anddesulphurization, constructionand commissioning■ Capacity790 MWe■ Steam parameters: SH: 603 ºC / 290 bar;RH: 621 °C / 75 bar■ <strong>Hitachi</strong> steam turbine: 3,000 RPM; 962 MVA■ Commissioning: 2009 / 2010■ Scope of supply: Turnkey including constructionand commissioningMalmöTailored combined-cycle power plant■ Capacity: 440 MWe,<strong>25</strong>0 MWth district heating■ Configuration: 1 x Gas turbine, 1 x HRSG,1 x Steam turbine, Multishaft■ Commissioning: 2009■ Scope of supply: Consortium leader, BOP,civil, electrical, constructionand commissioning■ Walsum 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!