11.07.2015 Views

St Kilda Harbour Concept Plan - Parks Victoria

St Kilda Harbour Concept Plan - Parks Victoria

St Kilda Harbour Concept Plan - Parks Victoria

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CarparkAlternateJunior SailingAcademySiteExistingBoat yardBefore - Existing RMYS (Building footprint 1000m2)After -Proposed RMYS forecourtRMYS ForecourtOne of the critical bottlenecks within the <strong>Harbour</strong> precinct has always been thearea in front of the RMYS boat repair yard. This would be exacerbated even moreif the currently approved Junior Sailing Academy building was also located atthis site. It is important to maintain a continuous pedestrian promenade alongthe waterfront, with full public access to the water, and wide enough to cater forthe growing volumes of pedestrian traffic using the space. If the Junior SailingAcademy was alternatively located within the proposed operations building, itwould free up the space in front of the RMYS, creating a new public forecourtwhich is a threshold to the clubhouse, and allowing the public to move aroundthe historic Catani Gardens and past the building to connect more easily to the<strong>St</strong> <strong>Kilda</strong> Pier.29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!