11.07.2015 Views

DS450 Decommissioning GSR Part 6 revised 19Mar2013 ... - gnssn

DS450 Decommissioning GSR Part 6 revised 19Mar2013 ... - gnssn

DS450 Decommissioning GSR Part 6 revised 19Mar2013 ... - gnssn

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

subject to the approval of the regulatory body, shall be developed to ensure safety during the period ofdeferment.8.3. Consistent with the final decommissioning plan, decommissioning techniques shall beselected such that the protection of workers, public and the environment is optimized and thegeneration of waste is minimized. As decommissioning actions progress, such as decontamination,cutting and handling of large components, new hazards may be created. The impact of these actions onsafety shall be assessed and managed so that the potential consequences of these new hazards areprevented, detected, and mitigated, to ensure that protection and safety are optimized.8.4. The regulatory body shall make arrangements for and shall implement the inspection andreview of the decommissioning actions to ensure that they are being carried out in accordance with thefinal decommissioning plan and the authorization and with other requirements for which theregulatory body has responsibility for oversight. If safety requirements and conditions forauthorization are not met, the regulatory body shall take appropriate enforcement actions.Requirement 13: Emergency response arrangementsEmergency response arrangements, commensurate with the hazards, shall be established andmaintained and events significant to safety shall be reported to the regulatory body in a timelymanner.8.5. Requirements for preparedness and response for a nuclear or radiological emergency areestablished in Ref. [9].Requirement 14: Radioactive waste managementManagement of radioactive waste shall be established for all waste streams.8.6. Disposal shall be the preferred management option for radioactive waste arising fromoperational activities that remains at the facility and radioactive waste that is generated duringdecommissioning [3]. If disposal capacity is not available, radioactive waste shall be stored safely inaccordance with the relevant requirements [10].8.7. Prior to starting decommissioning, the licensee shall ensure the availability of adequateprocessing and storage capabilities and transport package(s) for the radioactive waste resulting fromthe decommissioning.8.8. If operational radioactive waste or nuclear fuel is present in the facility after its permanentshutdown, such material shall be removed prior to conduct of decommissioning actions and shall betransported to another authorized facility (e.g. for interim storage) in compliance with the applicable15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!