11.07.2015 Views

Good Places to Learn: Stage 2 Funding Allocation - Financial ...

Good Places to Learn: Stage 2 Funding Allocation - Financial ...

Good Places to Learn: Stage 2 Funding Allocation - Financial ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table E-2: Secondary Program Needs and CostingTeaching SpaceBenchmark SizeCost of Upgrading TeachingSpaceLibrary Resource Centre Benchmark Gross Floor Area = 140 m 2 Assumes facilities will require theretrofit of existing classroomDouble GymnasiumScience Labora<strong>to</strong>ryBroad-Based Technology(BBT)space <strong>to</strong> upgrade <strong>to</strong> provideadequate library facilities. Retrofitcosts are assumed <strong>to</strong> be 60% ofnew construction costs or$829.80/m 2 . The cost per libraryspace upgrade is $116,172 perlibrary space upgrade multipliedby the board-specific GeographicAdjustment Fac<strong>to</strong>r• Benchmark Gross Floor Area = 560 m 2560 m 2 X $1,383 per m 2 =$774,480 per new construction of• Benchmark Height = 5.5 ma double gymnasium XGeographic Adjustment Fac<strong>to</strong>r• Benchmark Gross Floor Area = 90 m 2 A secondary facility is assumed <strong>to</strong>require one science labora<strong>to</strong>ry forevery 168 average dailyenrolment (ADE) pupils. Forevery 168 pupil places of on-theground• (OTG) capacity, a retrofitAny facility constructed before 1985 is assumedcost for one science lab is<strong>to</strong> require upgraded science labora<strong>to</strong>ries.calculated. Retrofit costs areassumed <strong>to</strong> be 60% of newconstruction costs or $829.40/m 2 .The cost per science lab upgradeis $74, 682 multiplied by theboard-specific GeographicAdjustment Fac<strong>to</strong>r• A facility is determined <strong>to</strong> require a BBT when no 370 m 2 X $1,383 per m 2 =• Benchmark Gross Floor Area = 370 m 2 Fac<strong>to</strong>rsecondary facility of the same board with anappropriate BBT exists within a 32 km vicinity$511,710 per new construction ofa BBT X Geographic AdjustmentA benchmark of 60% of the benchmark construction cost per metre square <strong>to</strong> build newwas used <strong>to</strong> calculate the cost of retrofitting spaces. This cost assumes that most of thestructural framework (structural frame, foundations, base floor, roofing, exterior walls andwindows) as well as the HVAC and plumbing would remain largely unaltered. Bycontrast, interior partitions, doors and finishes, local plumbing services, local fireprotection, local heating and cooling, lighting and local communications systems wouldrequire alteration as part of the overall retrofit. Based on the relative cost of retrofittingeach component and averaging across the various space types, 60% of the benchmarkconstruction cost per square metre has been recognized for retrofit costing calculations.Ministry of Education Page 188 of 191<strong>Good</strong> <strong>Places</strong> <strong>to</strong> <strong>Learn</strong>: <strong>Stage</strong> 2 <strong>Funding</strong> <strong>Allocation</strong> (Revised February 12, 2007)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!