11.07.2015 Views

Industrial Pumps Rebuild and Maintenance Guide

Industrial Pumps Rebuild and Maintenance Guide

Industrial Pumps Rebuild and Maintenance Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Gl<strong>and</strong> AssemblyCHALLENGESOLUTIONApply Loctite ® 572 Thread Sealant• Loctite ® 572 Thread Sealant fills the air space within the threads• Allows the flushing connector to be removed with normal h<strong>and</strong> tools when necessaryPrevent corrosionwithin the gl<strong>and</strong> flushing connectorCause:• Whether using a mechanical seal or packing, these components aretypically cooled <strong>and</strong> lubricated by either a product flush or an externalflush. In either case, the flushing connector is prone to corrosion <strong>and</strong>seizure. This is especially true for pumps configured with packing. Sincepacking typically requires 40–60 drops per minute for proper cooling<strong>and</strong> lubrication, there is plenty of available moisture for rust to attack thegl<strong>and</strong> assembly componentsSteps:1. Clean the parts with Loctite ® 7063 Cleaner & Degreaser2. Apply a b<strong>and</strong> of Loctite ® 572 Thread Sealant to male threads starting one to twothreads from the end of the fitting3. Assemble parts snugly. Do not overtightenRESULTS• Prevention of leaks <strong>and</strong> corrosion• Eliminated seizure• Ensured easy maintenance of flushing connectors30 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!