11.07.2015 Views

Industrial Pumps Rebuild and Maintenance Guide

Industrial Pumps Rebuild and Maintenance Guide

Industrial Pumps Rebuild and Maintenance Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pump CasingCHALLENGESOLUTIONPrevent the frame adapter,stuffing box <strong>and</strong> casing fromseizing togetherCause:• When assembling these components, there are areas where theclearance is very tight. These small clearances are areas where rust<strong>and</strong> corrosion can work in to seize the components together, makingdisassembly very difficultApply Loctite ® 8023 Marine Grade Anti-Seize compoundduring assembly• Loctite ® Anti-Seize compounds have superior water washout resistance,they will stay where they are appliedSteps:1. Clean the parts2. Apply Loctite ® 8023 Marine Grade Anti-Seize to the outside diameter of the stuffing box at the mating point3. Assemble components as usualRESULTS• Sufficient lubrication provided during assembly• Prevention of rust while in service• Efficient disassembly32 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!