11.07.2015 Views

Extreme Networks Consolidated "i" Series Hardware Installation Guide

Extreme Networks Consolidated "i" Series Hardware Installation Guide

Extreme Networks Consolidated "i" Series Hardware Installation Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

POWERPOWERMeeting Site RequirementsFigure 7: Using an ESD wrist strap when handling switch components1 2 3 4 A B 5 6 7 8ESD strapconnector5001550015Connectedwrist strap50020DC OUTAC IN50020DC OUTAC INSPG_003Rack Specifications and RecommendationsRacks should conform to conventional standards. In the United States, use EIA Standard RS-310C:Racks, Panels, and Associated Equipment. In countries other than the United States, use IEC Standard297. In addition, verify that your rack meets the basic mechanical and space requirements that aredescribed in this section.Mechanical Recommendations for the RackUse distribution racks that meet the following mechanical recommendations:• Use an open style, 19-inch (48.26 cm) rack to facilitate easy maintenance and to provide properventilation.• The rack should use the universal mounting rail hole pattern that is identified in IEC Standard 297.• The mounting holes should be flush with the rails to accommodate the chassis.• Use a rack made of steel or aluminum.<strong>Extreme</strong> <strong>Networks</strong> <strong>Consolidated</strong> "e" and "i" <strong>Series</strong> <strong>Hardware</strong> <strong>Installation</strong> <strong>Guide</strong> 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!