You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3. RIGGING INSTRUCTIONSFig. 4 Relevant Items (principle sketch)3.1 GENERAL3.1.1 ScopeInstructions and advice in this manual exclusively referto the following items (see Fig. 4):– TIRAK scaffold hoistwith BLOCSTOP ® BSO secondary brakeor BS/BSO 1) secondary brake;– Special TIRAK wire rope;– Power supply cord.Fixing thewire rope to thesupport equipmentSpecialTIRAK ® wire ropeTIRAK ® withBLOCSTOP ® BSOsecondary brake1) Instructions and advice for TIRAK ®with BLOCSTOP ® BS/BSOsecondary brakesee seperate instructionson pages 21 to 34.ConnectingTIRAK ® andplatform systemPowersupply cordFig. 5Typical suspended scaffold installationTie-backSupportequipmentLifeline3.1.2 Checks before riggingIt is a qualified person’s responsibility to check the wholeinstallation to meet all safety requirements of:– OSHA regulations and federal, state, provincial orlocal safety regulations,– the proper instructions delivered by the manufacturersof the other pieces of equipment included inyour suspended scaffold installation.Some pieces are:– Support equipment including tie-back;– platform system, work-cage, or bosun’s chair;– safety equipments (personal fall arrest system);– barricade below the drop of the platform/workcage/bosun’schair.SpecialTIRAK ®wire ropeTIRAK ®withBLOCSTOP ®BSOSuspendedplatformsystemPersonalFall ArrestSystemPowersupplycordNOTE: This information is NOT to be considered asa complete checklist for your specific installation.It is only a sample list of some general components,which make part of a typical suspendedscaffold installation (Fig. 5).8Barricade