11.07.2015 Views

positive vs negative iteration in design - Lean Construction Institute

positive vs negative iteration in design - Lean Construction Institute

positive vs negative iteration in design - Lean Construction Institute

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ballard IGLC-8 5<strong>design</strong> tasks. It is one of several modules <strong>in</strong> the ADePT software developed atLoughborough University (Simon et al. (1999). DSM is appropriate when a specific<strong>design</strong> direction has been established or for the exploration of alternative <strong>design</strong>sequences. Once iterative loops have been m<strong>in</strong>imized, this author proposes that selectionbe made from among the strategies presented below <strong>in</strong> order to manage each of thoseloops.A major contributor is sequential process<strong>in</strong>g, which adds to the time expended on theproblem, but also actively h<strong>in</strong>ders resolution. The architect (or anyone else) could havecalled a meet<strong>in</strong>g to decide as a group on the values for the relevant dimensions. If thevarious contributors to the decision had been together <strong>in</strong> one place, at m<strong>in</strong>imum therecould have been an acceleration of the iterative loop<strong>in</strong>g. At best, there could have beengenu<strong>in</strong>e team problem solv<strong>in</strong>g. Us<strong>in</strong>g cross-functional teams and team problem solv<strong>in</strong>g toproduce <strong>design</strong> is a staple of contemporary product development processes.Table 2: Techniques for Reduc<strong>in</strong>g Negative Iteration<strong>design</strong> structure matrixteam problem solv<strong>in</strong>gcross functional teamsshared range of acceptable solutions (values)share <strong>in</strong>complete <strong>in</strong>formationreduced batch sizesteam pull schedul<strong>in</strong>gconcurrent <strong>design</strong>deferred commitmentleast commitmentset-based <strong>vs</strong> po<strong>in</strong>t-based <strong>design</strong>over<strong>design</strong>production control. LCI will apply the comb<strong>in</strong>ed software to the management of U.S. <strong>design</strong> projects,Loughborough will apply it to U.K. <strong>design</strong> projects, and the results will be shared.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!