METHOD STATEMENT Ash Raking of Biomass Boiler - Vital Energi
METHOD STATEMENT Ash Raking of Biomass Boiler - Vital Energi
METHOD STATEMENT Ash Raking of Biomass Boiler - Vital Energi
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>METHOD</strong> <strong>STATEMENT</strong><strong>Ash</strong> <strong>Raking</strong> <strong>of</strong> <strong>Biomass</strong> <strong>Boiler</strong>Job / Contract NameRiverside DeneJob / Contract Number VC 90134Date Jun 2013Method Statement Written By <strong>Vital</strong> <strong>Energi</strong> Utilities LtdMethod Statement Approved ByCorresponding Risk Assessment No.Signature <strong>of</strong> Approver1. INTRODUCTIONThis Method Statement describes the specific safe working methods which will be used to carry out the work. It givesdetails <strong>of</strong> how the work will be carried out and what health and safety issues and controls are involved. The content <strong>of</strong>this Method Statement reflects the finding <strong>of</strong> the relevant Risk Assessment(s).2. DESCRIPTION OF WORK<strong>Ash</strong> <strong>Raking</strong> <strong>of</strong> <strong>Biomass</strong> <strong>Boiler</strong>Maximo PM Number: 3409Work Type:SHEJob Seq. Description <strong>of</strong> Task to be completed10 Ensure that all safety barriers, signage, isolatins and permits are in place.20 Safely shutdown the boiler on the panel, leave fan on for expelling smoke and gas in the chamber.30 Visually inspect the chamber through the inspection window, to make sure the fire has burnt out, befor openingdoor on the boiler.40 Wear PPE: Gloves, goggles, mask and overalls for the next tasks.50 Do not handle ash and clinker with bare hands.60 Never at any point should the chamber be entered nor should an operative each inside the boiler chamber.70 With the special tools provided, hook type poker and shovel, rake out ash and any clinker.80 Air holes on the sides <strong>of</strong> the chamber should be cleared from ash and clinker.90 The debris created from the clear out is to be raked to the front <strong>of</strong> the chamber onto the grate in front <strong>of</strong> the door,for the ash auger to bring out into the ash transport system into the bins.100 When finished close the door to chamber and re-start the boiler on the panel.110 Maintain good housekeeping at all times; tidy the work area, removing any waste products generated during thetest.120 Remove all barriers, signage and isolation before signing and isolation before signing <strong>of</strong>f permit/s.21 June 2013 08:44:11 GMT+01:00 1 / 3
3. LOCATION / ASSET OF WORKLocationAssetEC-BIOB4. Access ArrangementsGive details <strong>of</strong> any special access or egress arrangements that will be used.5. LicenceIf a licence is required for this work, give details <strong>of</strong> licence required, who holds it and where a copy <strong>of</strong> this licence isstored e.g. Asbestos, C.O.R.G.I. Registration.21 June 2013 08:44:11 GMT+01:00 2 / 3
21 June 2013 08:44:11 GMT+01:00 3 / 3