11.04.2015 Views

RISK ASSESSMENT SHEET

RISK ASSESSMENT SHEET

RISK ASSESSMENT SHEET

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>RISK</strong> <strong>ASSESSMENT</strong> <strong>SHEET</strong><br />

Risk assessment detail<br />

Risk Assessment Number: 2177<br />

Risk Assessment Date: 28 June 2013<br />

Site Name: Wyndford VC 90157<br />

Related PM Number 2875 Boiler (Atmospheric Gas<br />

Burner) EC-GB2 Weekly<br />

Related Asset EC-GB2 Gas Boiler 2 + Dunphy Burner<br />

Related Location<br />

Main Task under assessment<br />

Boiler (Atmospheric Gas Burner) EC-GB2 Weekly<br />

Boiler 2 (Athmospheric Gas Burner) WEEKLY<br />

No other PM/Task other than that stated shall be<br />

undertaken<br />

HAVE YOU INFORMED THE DESIGNATED TEAM LEADER OR ANY OTHER PERSON THAT<br />

YOU ARE WORKING ON THIS SITE TODAY? IF NOT - DO IT NOW<br />

ENSURE PLANT ROOM DOOR IS LEFT UN-LOCKED WHILST IN THE ENERGY CENTRE<br />

ENSURE LIGHTING LUX LEVELS ARE SUFFICIENT FOR SAFE WORKING<br />

ENSURE YOU VISUALLY INSPECT THE ENERGY CENTRE FOR ANY OBVIOUS HAZARDS<br />

ENSURE YOU CARRY AN OPERATIONAL HAND TORCH<br />

IS YOUR PPE ADEQUATE FOR TODAYS WORK?<br />

FOR TENANT/DWELLING WORK<br />

IF THERE IS NO ADULT AVAILABLE TO ALLOW ACCESS OR THE PERSON IS PERCIEVED TO BE UNDER 16<br />

YEARS OF AGE, THEN DO NOT ENTER AND NOTIFY YOUR TEAM LEADER OR COORDINATOR IMMEDIATELY<br />

ONCE INSIDE THE DWELLING;<br />

ENSURE LIGHTING LUX LEVELS ARE SUFFICIENT FOR SAFE WORKING<br />

ENSURE YOUR MOBILE PHONE IS FULLY CHARGED<br />

ENSURE YOU CARRY AN OPERATIONAL HAND TORCH<br />

Plant Equipment / Location ID<br />

Other Equipments involved with task<br />

EC-GB2<br />

burner b2<br />

Forseeable hazards<br />

slips trips falls<br />

hot surfaces<br />

Electric shock<br />

Boiler 2 (Athmospheric Gas Burner) WEEKLY<br />

Boiler (Atmospheric Gas Burner) EC-GB2 Weekly<br />

1 / 4


<strong>RISK</strong> <strong>ASSESSMENT</strong> <strong>SHEET</strong><br />

Safety Systems to be Employed<br />

Yes/No Comments<br />

Safety Documents<br />

Required?<br />

Hot Work Assessment? N<br />

Special PPE? Y Gloves<br />

Safety Harness? N<br />

Gas Test? N<br />

Floor Open Certificate? N<br />

Selected Persons Report? N<br />

COSHH? N<br />

Other/s? N<br />

N<br />

All the safety systems on the left must be<br />

employed and necessary to carry out<br />

maintenance and repair work. You will be<br />

expected to work on sites in areas that<br />

may be hazardous. You must carry out or<br />

have carried (by a competent person) a<br />

risk assessment prior to any work being<br />

carried out. The risk assessment must be<br />

approved by your supervisor or safety<br />

rep. If you consider any job/area to be<br />

unsafe, then leave the work/aera and<br />

report immediately to your supervisor.<br />

Boiler 2 (Athmospheric Gas Burner) WEEKLY<br />

Boiler (Atmospheric Gas Burner) EC-GB2 Weekly<br />

2 / 4


<strong>RISK</strong> <strong>ASSESSMENT</strong> <strong>SHEET</strong><br />

Hazard Probability Task Frequency Frequency Hazard Severity People People<br />

Probability Factor<br />

Factor Severity Factor Exposed Factor<br />

Impossible 0 Infrenquently 1 Insignificant 0.1 1 - 2 Persons 1<br />

Unlikely 1 Annually/ 6 Monthly 1 Minor - Light<br />

Damage<br />

Possible 2 Monthly / 3 Monthly 1 Break - minor<br />

bone or<br />

minor illness<br />

(temp)<br />

Even Chance 5 Weekly / 2 Weekly 1.5 Break - major<br />

bone or<br />

minor illness<br />

(Permanent)<br />

0.5 3 - 7 Persons 2<br />

1 8 - 15 Persons 4<br />

2 16 - 50<br />

Persons<br />

Probable 8 Daily 2.5 Loss of 1 4 more than 50<br />

limb/eye or<br />

Persons<br />

serious illness<br />

Likely 10 Hourly 4 Loss of 2 8<br />

limbs/eyes or<br />

serious illness<br />

Certain 15 Constantly 5 Fatal 15<br />

Table of Hazard Scores before and after control measures<br />

People Factor 1.0 Frequency Factor 1.5<br />

Uncontrolled<br />

Controlled<br />

Hazards Prob. Factor Sev. Factor Risk Action Taken to Reduce risks Prob. Factor Sev. Factor Risk<br />

Electricity 8.0 15.0 180.0 Employ permit for work/ isolate lock<br />

off source. Ensure that extension<br />

cables and power tools are in safe<br />

condition.<br />

Moving Machinery 2.0 4.0 12.0 Employ a permit for work/ isolate and<br />

lock off source<br />

Stored energy 1.0 4.0 6.0 Ensure all stored energy is release<br />

prior to work commencing.<br />

Cuts, stabs grazes 2.0 0.5 1.5 Wear all PPE identified in the risk<br />

assessment/ take care when using<br />

provided hand tools. keep area of<br />

work tidy<br />

Manual Handling 2.0 0.1 0.3 Use tested lifting equipment on<br />

heavy on heavy awkward items. Use<br />

2 persons lift<br />

Slips, Trips & Falls 1.0 0.5 0.8 Ensure that your work area is kept<br />

tidy at al times, ensure clear access<br />

and egress.<br />

Falls from height /<br />

falling objects<br />

Use of hazardous<br />

substances (COSHH<br />

1999)<br />

Dust, Fumes and<br />

Vapours<br />

Blows, impacts,<br />

crushing<br />

1.0 0.5 0.8 Use certified scaffolds when working<br />

above 2 meters. Ensure that tools<br />

and equipment cannot fall. Wear<br />

safety harness attached to fixed<br />

anchor point.<br />

0.0 0.1 0.0 Read, understand and follow<br />

precautions mentioned in COSHH<br />

assessment<br />

2.0 1.0 3.0 Wear fume/ particle masks as<br />

appropriate.<br />

1.0 1.0 1.5 Wear PPE issued/ take care when<br />

using hand tools/ moving heavy<br />

items.<br />

8<br />

12<br />

1.0 15.0 22.5<br />

1.0 4.0 6.0<br />

1.0 4.0 6.0<br />

1.0 0.5 0.8<br />

1.0 0.1 0.2<br />

1.0 0.5 0.8<br />

1.0 0.5 0.8<br />

0.0 0.1 0.0<br />

1.0 1.0 1.5<br />

1.0 1.0 1.5<br />

Splashes and Spurts 0.0 0.5 0.0 Wear PPE issued/ Wear goggles. 0.0 0.5 0.0<br />

Boiler 2 (Athmospheric Gas Burner) WEEKLY<br />

Boiler (Atmospheric Gas Burner) EC-GB2 Weekly<br />

3 / 4


<strong>RISK</strong> <strong>ASSESSMENT</strong> <strong>SHEET</strong><br />

Risk Assessment guide Table<br />

Risk Factor = Probability Factor x Severity Factor x person Factor x<br />

Frequency Factor<br />

Risk Factor Category Action<br />

0 - 10 Acceptable Routine Action<br />

11 - 50 Marginal - Low Risk Employ Safety Systems<br />

51 - 100 Medium Risk Reduce Risk / Employ Safety Systems<br />

Over 100 Unacceptable Must not be Allowed<br />

Population Affected / Group at Risk<br />

Engineer undertaking the task.<br />

Accessor's Comments / Recommendations<br />

Assessed By: Rico Lorentzen Signature:<br />

Team Leader:<br />

Signature:<br />

A copy of this document must be retained on site in the SHE folders.<br />

Boiler 2 (Athmospheric Gas Burner) WEEKLY<br />

Boiler (Atmospheric Gas Burner) EC-GB2 Weekly<br />

4 / 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!