11.07.2015 Views

(ACS) Technical Manual - Alaska Clean Seas

(ACS) Technical Manual - Alaska Clean Seas

(ACS) Technical Manual - Alaska Clean Seas

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TACTICS LIST (Page 1 of 4)(Page 2 of 4) TACTICS LISTTactic Rev. Date Tactic Rev. DateSAFETYS-1 Site Entry Procedures Revised 03/12S-2 Site Safety Plan Form Revised 03/12S-3 Identifying Required Personal Protection Revised 03/12S-4 Site Layout Revised 03/12S-5 Air Monitoring for Personal Protection Revised 03/12S-6 Decontamination Revised 03/12S-7 Gross Decontamination of Vessels Revised 03/12S-8 Safety During Operations in Overflood Conditions Revised 03/12CONTAINMENTC-1 Containment Using Snow Berm Revised 03/12C-2 Deflection Booming at a Culvert Revised 03/12C-3 Culvert Blocking Revised 03/12C-4 Barriers on Land Revised 03/12C-5 Deflection or Exclusion Booming on Lake or Tundra Revised 03/12C-6 Underflow Dam Revised 03/12C-7 Deadarm Trench on River Bank Revised 03/12C-8 Deflection Booming in Stream Revised 03/12C-9 Exclusion Booming on River Revised 03/12C-10 Containment Using Ice-Road Ring Revised 03/12C-11 Containment on Ice with Trenches and Sumps Revised 03/12C-12 Trenching Ice to Direct Flow to a Containment Point Revised 03/12C-13 Deflection Booming in Open Water Revised 03/12C-14 Exclusion Booming in Open Water Revised 03/12C-15 Intertidal Booming Revised 03/12C-16 Anchored W Deflection Boom Revised 03/12C-17 Containment Using U-Boom Revised 03/12C-18 Containing Light Layer of Oil on Snow Using Water Spray Revised 03/12C-19 Containing Oiled Snow Using Snow Fence Revised 03/12RECOVERY AND STORAGER-1 Mechanical Recovery of Lightly Oiled Snow Revised 03/12R-1A Use of Snow Blower to Remove Lightly Misted Snow Revised 03/12R-2 <strong>Manual</strong> Recovery of Lightly Oiled Snow Revised 03/12R-3 Recovery of Oil-Saturated Snow Revised 03/12R-4 Flushing of Oil on Tundra Surface Revised 03/12R-5 Recovery of Embedded Oil Revised 03/12R-6 Recovery by Direct Suction Revised 03/12R-7 Recovery from Pit or Trench Revised 03/12R-8 Use of Portable Skimmers with Pumps (River and Lake) Revised 03/12R-9 Use of Sorbents Revised 03/12R-10 Fairchild Gate Weir Collection System Revised 03/12R-11 Decanting Separated Water in River Revised 03/12R-12 Aggressive Breakup in River Revised 03/12RECOVERY AND STORAGE (CONT’D)R-13 Cutting Ice Slots for Recovery Revised 03/12R-14 Recovery of Oil under Ice Revised 03/12R-15 Anchored V-Boom to Skimmer Revised 03/12R-16 Hook Boom to Skimmer and Storage Revised 03/12R-17 J-Boom to Skimmer and Mini-Barge Revised 03/12R-18 U-Boom to Skimmer and Mini-Barge Revised 03/12R-19 J-Boom to Large Barge or OSRV Revised 03/12R-19A Use of J-Booms in Broken Ice Revised 03/12R-20 U-Boom with Open Apex to Skimming System Revised 03/12R-21 Hot-Water, High-Pressure Washing of Solid Surfaces Revised 03/12R-22 Temporary Storage Options Revised 03/12R-23 Tank on Trailer (Fuel Tanker) Revised 03/12R-24 Hoses and Pumps in Series Revised 03/12R-25 Freighter Boat with Tank Revised 03/12R-26 Excavation and Storage of Oiled Gravel Revised 03/12R-27 Damaged Tank Transfer Procedures Revised 03/12R-28 Lightering/Offloading Revised 03/12R-29 Ice Mining Revised 03/12R-30 Recovery Using Diamond Boom for Subsea Pipeline Break Revised 03/12R-31 Free Skimming Revised 03/12R-32A Single Boom-Arm Skimming Revised 03/12R-32B Double Boom-Arm Skimming Revised 03/12R-33 Swift Water Recovery – Harbour Buster Revised 03/12TRACKING AND SURVEILLANCET-1 Delineation of Oiled Snow or Tundra Revised 03/12T-2 Mapping and Surveillance of Spill on Land Revised 03/12T-3 Detection and Delineation of Under-Ice Oil Revised 03/12T-4 Discharge Tracking in Open Water Revised 03/12T-4A Discharge Tracking in Ice Revised 03/12T-5 Trajectory Calculations Revised 03/12T-6 Blowout Modeling Revised 03/12T-7 Spill Volume Estimation Revised 03/12BURNINGB-1 In-Situ Burning Plan Revised 03/12B-1A In-Situ Burn Plan and Application Form Revised 03/12B-2 Burning Oily Vegetation Revised 03/12B-3 In-Situ Burning with Heli-torch and Other Igniters Revised 03/12B-4 Deployment and Use of Fire Containment Boom Revised 03/12B-5 Burning Oil Pools on Any Solid Surface Revised 03/12B-6 Burn Residue Recovery Revised 03/12B-7 Burn Extinguishment on Water Revised 03/12<strong>ACS</strong> Tech. <strong>Manual</strong> Vol. 1, 03/12NOTE: All values given on these pages are for planning purposes only. NOTE: All values given on these pages are for planning purposes only. <strong>ACS</strong> Tech. <strong>Manual</strong> Vol. 1, 03/12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!