(ACS) Technical Manual - Alaska Clean Seas

(ACS) Technical Manual - Alaska Clean Seas

(ACS) Technical Manual - Alaska Clean Seas

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TACTIC C-15 Intertidal Booming (Page 1 of 2) Intertidal Booming (Page 2 of 2) TACTIC C-15NOTE: “Base Location” is storage location (may change seasonally); “Mobe Time” is time to get it out of storage, prepare it foroperation, and make it ready to travel (concurrent for all equipment); “Deploy Time” is time to make it operational for its intended useat the spill site. These times do not include travel time from base to spill site, which may have multiple components (see Tactic L-3).Shoreline ProjectionCross-SectionEQUIPMENT AND PERSONNELTo determine the approximate length of Shore Seal boom required, multiply 1.1 times the length of shoreline to beprotected. Select vessels and booms according to area, water depth restrictions, and function (see Tactic L-6).Conventional BoomAir ChamberWater ChamberShore Seal BoomShoreEQUIPMENTShore Seal BoomFloating Pump and BlowerBASELOCATION<strong>ACS</strong>, KRU, MPU,Alpine<strong>ACS</strong>, KRU, MPU,AlpineFUNCTIONOil exclusionPIECES>50 ft# STAFFPER SHIFTMOBETIMEShore Seal inflation 1 1 hr4Work Boat All Boom placement 1 1 hrAnchor System All Anchor boom Variable 1 hr1 hrDEPLOYTIME1.5 hrWater*Recovery crews will perform maintenance.TOTAL STAFF FOR SETUP 4*Shore Seal Boom Cross-SectionOilAir-filledWaterWater-filledSUPPORTSorbents are used in conjunction with Shore Seal boom. Shovels or light excavating equipment help establishonshore anchors. Floats and chains are used in conjunction with offshore anchors.EQUIPMENTAvgas TrailerBASELOCATION<strong>ACS</strong>, GPB, KRU,Badami, AlpineFUNCTIONPIECES# STAFFPER SHIFTMOBETIMEDEPLOYTIMEAirboat fuel 1 1 initial 1 hr 0.5 hrShore Seal boom is bottom-founded and anchored at tideline and in very shallow water. Sorbent boom would beused at connections to prevent leaching.CAPACITIES FOR PLANNING• One response team can deploy and tend up to 1,000 ft of Shore Seal boom in a 12-hour shift.DEPLOYMENT CONSIDERATIONS AND LIMITATIONS• Shore Seal boom uses water ballast so that it can float free in high tide and seal to the intertidal shore during lowtide. Shore Seal booms also protect shoreline from wave events. Shore Seal boom will adjust to changing waterlevels.• When the boom is grounded, the heavy water ballast seals the boom to the shoreline and prevents oil frommoving along the intertidal zone.<strong>ACS</strong> Tech. <strong>Manual</strong> Vol. 1, 03/12 NOTE: All values given on these pages are for planning purposes only.NOTE: All values given on these pages are for planning purposes only. <strong>ACS</strong> Tech. <strong>Manual</strong> Vol. 1, 03/12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!