(i)(ii)(iii)(iv)(v)(vi)(vii)(viii)(ix)(x)(xi)Clearance shall be obtained from Central Ground water Board for <strong>the</strong> groundwater drawl as applicable.It is indicated that about 30421no <strong>of</strong> trees are required to be cut. Necessarypermission from competent authority shall be obtained for tree cutting.Compensatory tree plantation <strong>of</strong> at least 1: 3 ratio shall be carried out andcost provision should be made for regular maintenance. In addition, minimum3 rows <strong>of</strong> <strong>the</strong> trees in canopy formation – about 15 m width along <strong>the</strong>boundary shall be provided.Shall obtain approval <strong>of</strong> Forests Department/ wildlife warden for <strong>the</strong>proposed Peacock Conservation Plan.Shall have proper Traffic circulation plan to avoid conflict at <strong>the</strong> entry andexist in view <strong>of</strong> <strong>the</strong> proposed connectivity to <strong>the</strong> present 12 m wide road whichis expected to be widened to 24 m.<strong>The</strong>re shall be no open dumping or storage <strong>of</strong> Solid wasteRehabilitation and resettlement for <strong>the</strong> reported 123 families shall be as per<strong>the</strong> local norms.CSR activities viz. Medical schemes, education, infrastructure facilities shallbe carried out as committed.All <strong>the</strong> recommendation <strong>of</strong> <strong>the</strong> EMP shall be complied with letter and spirit.All <strong>the</strong> mitigation measures submitted in <strong>the</strong> EIA report shall be prepared in amatrix format and <strong>the</strong> compliance for each mitigation plan shall be submittedto MoEF along with half yearly compliance report to MoEF-RO.Submit <strong>the</strong> intersection plan <strong>of</strong> <strong>the</strong> proposed second approach to <strong>the</strong> Airport.Shall submit <strong>the</strong> energy and water conservation measures along with <strong>the</strong>details <strong>of</strong> % saving.Submit <strong>the</strong> details <strong>of</strong> earth cutting and filling for <strong>the</strong> project.<strong>The</strong> <strong>Committee</strong> recommended <strong>the</strong> proposal for EC Clearance after submission <strong>of</strong><strong>the</strong> information (ix), (x) & (xi) with <strong>the</strong> above condition in <strong>the</strong> Clearance letter for strictcompliance by <strong>the</strong> project proponent.4.12 Environment and CRZ clearance for construction <strong>of</strong> residential cum commercialcomplex (DLF bay view) at plot no. N5A & N5B Marine Drive Cochin, DistrictErakulam Kerala [F.No 21-287/2008-IA.III]<strong>The</strong> <strong>Committee</strong> decided to defer <strong>the</strong> project, since <strong>the</strong> project proponent did notcirculate <strong>the</strong> documents.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!