12.07.2015 Views

The Minutes of the 121 Meeting of the Expert Appraisal Committee ...

The Minutes of the 121 Meeting of the Expert Appraisal Committee ...

The Minutes of the 121 Meeting of the Expert Appraisal Committee ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

100% steam requirement and approximately 80% - 90% <strong>of</strong> <strong>the</strong> plant’s power requirementshall be met through a 16 MW Captive Cogeneration Power Plant based on Coal/ Gas / Oil.Rayon grade wood pulp (84,000 TPA), principal raw material will be imported. O<strong>the</strong>rchemicals required in <strong>the</strong> process will be caustic soda (47,200 TPA) Sulphuric acid (58,400TPA) Zn SO 4 .7H 2 O (240 TPA) and CS 2 (13,600 TPA).Effluent treatment plant will be installed to treat <strong>the</strong> effluent 13,200 M 3 /day throughprimary and secondary Treated effluent will be discharged into <strong>the</strong> saline water zone <strong>of</strong>Patalganga River at a disposal point recommended by National Institute <strong>of</strong> Oceanography(NIO). Domestic sewage 150 M 3 /day will be treated in STP and zero discharge principleadopted.<strong>The</strong> project has obtained Environmental Clearance from MOEF for <strong>the</strong> Industry. <strong>The</strong>project site MIDC Additional Patalganga is not in <strong>the</strong> CRZ Area. <strong>The</strong> proposed effluentdisposal point location which is about 6.50 kilometers downstream from <strong>the</strong> project site. Onlya small portion <strong>of</strong> <strong>the</strong> pipeline will be in <strong>the</strong> saline zone <strong>of</strong> Patalganga river, will fall in <strong>the</strong>CRZ area. MCZMA has recommended vide letter dated 10 th January 2013. MPCB hasgranted consent to discharge.During <strong>the</strong> discussion, <strong>the</strong> following points emerged:(i)(ii)<strong>The</strong> pipeline route is likely to disturb 15 numbers <strong>of</strong> mangrove plants.<strong>The</strong>refore 5 times mangrove plantation shall be carried out. Permission shallbe obtained from <strong>the</strong> High Court <strong>of</strong> Bombay as applicable for cuttingmangrove plants.All <strong>the</strong> recommendations & conditions specified by MCZMA shall be compliedwith.(iii) <strong>The</strong> disposal shall meet MPCB Norms .(iv)Spacing <strong>of</strong> diffuser ports may be increased to 20 mts with at least 6 ports in<strong>the</strong> diffuser. <strong>The</strong> result <strong>of</strong> outfall hydraulics may be submitted.<strong>The</strong> <strong>Committee</strong> recommended <strong>the</strong> proposal for CRZ Clearance after receipt <strong>of</strong> <strong>the</strong>information at (iv) above with <strong>the</strong> above condition in <strong>the</strong> Clearance letter for strictcompliance by <strong>the</strong> project proponent.4.5 Finalisation <strong>of</strong> ToR for Development <strong>of</strong> Nargol Port at Valsad District, Gujaratby M/s Cargo Motors Pvt. Ltd. (F. No. 11-4/2013-IA-III)<strong>The</strong> committee noted that <strong>the</strong> proponent is not clear about <strong>the</strong> activities proposed in<strong>the</strong> CRZ area and port limit. Also <strong>the</strong> port area notification is not available.In view <strong>of</strong> <strong>the</strong> foregoing observations, <strong>the</strong> committee recommend to defer <strong>the</strong>proposal. <strong>The</strong> proposal shall be reconsidered after <strong>the</strong> above observations are addressedand submitted.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!