12.07.2015 Views

The Minutes of the 121 Meeting of the Expert Appraisal Committee ...

The Minutes of the 121 Meeting of the Expert Appraisal Committee ...

The Minutes of the 121 Meeting of the Expert Appraisal Committee ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(i) <strong>The</strong> project road falls within 10 km radius from 2 wild life centuries- Nandani andramnagar. Necessary prior clearance from NBWL shall be obtained.(ii) <strong>The</strong> proposal indicates <strong>the</strong> acquisition <strong>of</strong> 26 ha ha Forest land. Necessary stage –Iforestry clearance shall be obtained as per OM dated 31.03.2011 and submitted alongwith final EIA report.(iii)It is indicated that 9975 nos. trees falls within <strong>the</strong> proposed RoW, however, bareminimum trees to be cut, <strong>the</strong> information should be provided about <strong>the</strong>ir species andwhe<strong>the</strong>r it also involved any protected or endangered species.(iv) Necessary green belt shall be provided on both side <strong>of</strong> <strong>the</strong> highway with propercentral verge and cost provision should be made for regular maintenance.(v) Explore <strong>the</strong> possibilities <strong>of</strong> cooled mixed technology instead <strong>of</strong> hot mixed technology(vi) <strong>The</strong> additional ToR and General Guidelines as per <strong>the</strong> annexure-I and Annexure-IIrespectively to this <strong>Minutes</strong> shall also be considered for preparation <strong>of</strong> EIA/EMP.(vii) Submit details on borrow areas as per OM dated 18/12/2012(viii) Any fur<strong>the</strong>r clarification on carrying out <strong>the</strong> above studies includinganticipated impacts due to <strong>the</strong> project and mitigative measure, project proponent canrefer to <strong>the</strong> model ToR available on Ministry website “http://moef.nic.in/Manual/Highways”.Public hearing to be conducted for <strong>the</strong> project as per provisions <strong>of</strong> EnvironmentalImpact Assessment Notification, 2006 and <strong>the</strong> issues raised by <strong>the</strong> public should be addressedin <strong>the</strong> Environmental Management Plan.A detailed draft EIA/EMP report should be prepared as per <strong>the</strong> above additional TORand should be submitted to <strong>the</strong> Ministry as per <strong>the</strong> Notification.B. Finalization <strong>of</strong> TOR for 6 laning <strong>of</strong> Chakeri to Allahabad (Km 483.687 to km630.000) section <strong>of</strong> NH-2 in <strong>the</strong> State <strong>of</strong> Uttar Pradesh by M/s NHAI [F.No.10-/2013-IA-III]<strong>The</strong> project road starts at Chakeri near Kanpur (km. 483.687) and ends at Allahabad (km.630.000), in <strong>the</strong> state <strong>of</strong> Uttar Pradesh. Total length <strong>of</strong> <strong>the</strong> project road is 146.313 km. Projectroad passes through 3 districts namely Kanpur Nagar, Fatehpur and Kaushambi. Proposedroad project involves widening <strong>of</strong> existing 4 lane divided carriageway to 6 lane dividedcarriageway with paved shoulder <strong>of</strong> NH 2 from km 483.687 to km 630.000. <strong>The</strong> road passesthrough <strong>the</strong> plain terrain. <strong>The</strong> project road passes through 138 villages, out <strong>of</strong> which 11villages are located in Kanpur Nagar district, 87 villages are in Fatehpur district and 40villages are in Kaushambi district. <strong>The</strong> project road does not pass through any ecologicallysensitive area / National Parks/ Wild Life Sanctuaries/ Tiger Reserves etc. Existing Right <strong>of</strong>Way (ROW) varies from 16 m to 79 m. Proposed ROW varies from 35m to 79m and at tollplaza location it is 150m. <strong>The</strong> total land proposed to be acquired is 338.5755 ha (Govt land:66.4971 ha and private land: 272.0784 ha). <strong>The</strong>re are 14 minor bridges and 2 major bridgeson project road. 1 new major bridge, widening <strong>of</strong> existing 12 minor bridges and 7 new minor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!