12.07.2015 Views

Progress and Prosperity-English - Kuwait Oil Company

Progress and Prosperity-English - Kuwait Oil Company

Progress and Prosperity-English - Kuwait Oil Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Progress</strong> & <strong>Prosperity</strong>are outlined below:Well planning, design <strong>and</strong> equipment selection:Each well is planned to meet specified requirements<strong>and</strong> completion designed tomeet required rate conditions. Appropriatecompletion equipment is thus selected keepingin view HSE compliance.Well Engineering:Tubing stress calculations are done for eachwell <strong>and</strong> appropriate completion equipmentis selected to ensure well integrity.Injection well monitoring <strong>and</strong> use of performanceimprovement techniques.Injection well rates & quality are constantlymonitored <strong>and</strong> evaluated. Acid stimulation<strong>and</strong> flow back techniques are being utilizedto improve well performance where appropriate.Balance injection <strong>and</strong> off-take rates for waterflood management:Production <strong>and</strong> injection rates for each waterfloodpattern are assessed <strong>and</strong> adjusted tomaintain optimum sweep.Inhibition of asphaltene/scale/bacterial,etc. deposition:Asphaltene deposition is a problem in someof our oil fields. Many studies have beenconducted to identify the causes of theproblem <strong>and</strong> to devise remedial measures.Chemical squeezes are currently being triedto control/mitigate this problem. Also withonset of water cut in wells scale deposition isa potential problem <strong>and</strong> measures are availableto deal with this through appropriatechemical squeeze treatments.Corrosion monitoring <strong>and</strong> control:Full scale corrosion monitoring <strong>and</strong> controlprocesses are implemented to ensure riskfree operations.Water production control:Water cut is a major problem in wells producingfrom natural/artificial water influxreservoirs. Water production is reduced withcement squeeze jobs where appropriate.20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!