12.07.2015 Views

Water Current Turbines for River Applications - Alaska Energy ...

Water Current Turbines for River Applications - Alaska Energy ...

Water Current Turbines for River Applications - Alaska Energy ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WCT EvaluationNRCan-06-01071Tidal Stream Turbine- SWANTURBINES (UK)Technology: The unit is a three-bladed axial flow turbine. A gearless low speed generator offers a highefficiency over a range of speeds with minimal maintenance demands through the use of novel structuraland electromagnetic topologies. To minimize CapEx and OpEx, offshore specialist CB&I John Browntransferred standard offshore technology and operations to <strong>for</strong>m the basis <strong>for</strong> a new support structureconcept. A simple, robust and serviceable yawing mechanism is used <strong>for</strong> maximum flow capture and theuse of patented materials, developed by Corus will <strong>for</strong>m the gravity base. In collaboration with theUniversity of Wales Swansea, using rotor-dynamic modeling, the concept was designed to allow simpleinstallation and maintenance retrieval in both shallow and deep water and to minimize vibrations, henceincreasing the maintenance period. <strong>Current</strong>ly, a 1m diameter prototype with an estimated 1.5 kW outputis being tested.Application: Deep and shallow water tidal applications, but could be used in non tidal rivers.Stage of Development: The project partners are currently cost optimizing the design <strong>for</strong> a technicalfeasibility demonstration. This Collaborative Industrial Research Project is managed by SwanseaUniversity to prepare the concept design and specification <strong>for</strong> a technology demonstrator. The designphase of the project is expected to run until the end of June 2006. The partners are currently seekingfunding to build and install the demonstration device in 2006-7. The total value of the project isestimated at $608,000.Overall Schedule:2006 Design and develop medium scale demonstrator cost optimization and modeling2008 Install and operate medium scale demonstrator (350kW)2010 Design and commission pre-commercial system2011 SalesVerdant Power Canada ULC 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!