12.07.2015 Views

Leighton Asia News, April 2005 - Leighton Holdings

Leighton Asia News, April 2005 - Leighton Holdings

Leighton Asia News, April 2005 - Leighton Holdings

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The plant produces polycarbonate compound forthe electronics and communications industries.High level of clientsatisfaction in ThailandGE Plastics is close to commissioning a significant expansion of its polycarbonatecompound manufacturing plant at Rayong in Thailand.The plant produces polycarbonate compoundfor Thailand’s electronics and communicationsindustries and the current expansion programis the fifth contract that <strong>Leighton</strong> hasundertaken for the company at Rayong.Under the latest contract, <strong>Leighton</strong> isresponsible for the design and construction ofthe extruder lines 5 and 6 expansion project.This involves replacing an existing extruderline with a larger extruder – doubling the line’soutput – and relocating two existing lines tocreate a separate new production cell.Converting the warehouse into a lean newproduction cell has presented severalchallenges. For example:> a new mezzanine deck had to beconstructed to enable raw materials to befed to the extruders; and> new systems were needed to overcome itsremoteness from existing utilities.New systems include a new raw materialstorage and handling system, a dense phaseconveying system, feeding systems for theextruders and an upgrade of the existing siteinfrastructure and utilities.emergency response room, utilities room andextensions to the warehouse. Several newstorage areas for safe handling of waste arealso planned. Design and construction arealready well underway and a close partnershiphas been forged with GE Plastics to ensure itsvery tight time requirements can be met.While all of this was going on, the company’snew line 4 at the plant had a highlysuccessful start-up. Tom Savage(GE Plastics’ regional project manager)was particularly enthusiastic when thistook place.“I want to say thank you to the <strong>Leighton</strong> teamfor its hard work – especially over the last fewweeks. I know they worked extremely hard andlong hours to get the new line going;overcoming late delivery of engineering dataand equipment from vendors to get it startedup. Congratulations and thanks,” he said.Other new facilities at Rayong include acanteen and locker room, a car park,<strong>Leighton</strong> is currently working on extruder lines 5 and 6.page 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!