12.07.2015 Views

8132 - NPCA SNF Watershed Report.indd - Niagara Peninsula ...

8132 - NPCA SNF Watershed Report.indd - Niagara Peninsula ...

8132 - NPCA SNF Watershed Report.indd - Niagara Peninsula ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE 4: WATER QUALITY DATA MONITORED BY THE <strong>NPCA</strong> IN 2007STATIONBIOMAPRATINGFACTORS AFFECTING WATER QUALITYUsshers CreekUS001WATERQUALITYRATINGPoorImpaired Bayer CreekBA001MarginalImpaired E. coli Grassy BrookGR001MarginalImpaired Tee CreekTE001MarginalImpaired Lyons CreekLY003MarginalImpaired Lyons Creek Contaminated Sediment StudyIn addition to the <strong>NPCA</strong>’s Water Quality Monitoring Program,sediment management options for PCB-contaminated sedimentin Lyons Creek are being considered under the <strong>Niagara</strong> RiverRemedial Action Plan. Completed as a series of documents, adetailed study of the contaminated sediments on Lyons CreekEast and Lyons Creek West has determined the extent ofcontamination and ecological risks at both sites, which werereported in the following documents:• Golder Associates Ltd. 2004. <strong>Niagara</strong> River Area of ConcernContaminated Sediment Site Assessment, Phase I and II.• Golder Associates Ltd. 2005. <strong>Niagara</strong> River Area of ConcernContaminated Sediment Site Assessment, Phase III.• Dillon Consulting Ltd. 2005. Human Health Screening LevelRisk Assessment: Lyon’s Creek East.• Dillion Consulting Ltd. 2005. <strong>Niagara</strong> River AOC Phase IV:Sediment Management Options for Lyon’s Creek East andWest.• Dougan & Associates. 2007. Lyon’s Creek East WetlandInventory and Monitoring Study.• Milani, Danielle & R. Fletcher. 2005. PCB contaminationand biological impacts in Lyons Creek East: Implementationof a Canada-Ontario Decision-making framework forcontaminated sediments. Prepared for the <strong>Niagara</strong> AOCsteering committee.Results from human health risk assessments for both sitesindicate that dermal exposure to Polychlorinated Biphenyls(PCBs) in the sediment would not be expected to result in anyadverse human health effects.Intake Protection Zone StudyThe <strong>Niagara</strong> Falls Intake Protection Zone (IPZ) study is beingcompleted by <strong>Niagara</strong> Region as one of the technical studiesthat fall under the Clean Water Act (CWA)(Ministry of theEnvironment 2006). The study report will be used by the<strong>Niagara</strong> <strong>Peninsula</strong> Source Protection Committee (NPSPC) toprepare the Assessment <strong>Report</strong> which is required under theCWA. The IPZ for <strong>Niagara</strong> Falls is classified as a Great LakesConnecting Channel and its vulnerability to contaminationis being determined in accordance with the Ministry ofEnvironment’s Assessment <strong>Report</strong> Draft Guidance Modulenumber 4: Surface Water Vulnerability Analysis (2006).The IPZ study is based on the existing Water TreatmentPlant intake location. Proposed future locations of theintake were not considered for this IPZ study. Initial resultsindicate that the IPZ will extend up the <strong>Niagara</strong> River and theChippawa Channel approximately 10 kilometres under currentoperating conditions. A portion of surface water upland areacatchments along this reach will be included in the IPZ suchas Usshers Creek and Bayers Creek as well as a portion of theurban area of Chippawa.There is a possibility of the flow in the Welland River beingreversed from the existing condition to its more natural state(of flowing down into <strong>Niagara</strong> River), during a shutdown of theChippawa Power Canal. These conditions were also modeledand indicate that under such circumstances, the IPZ will likelyextend about 4 km southwest from the intake upstream intoLyon’s Creek and the Welland River (Campbell 2007).The Clean Water Act (Ministry of the Environment 2006)requires that decisions made under the Planning Act or theCondominium Act (Ontario Ministry of Municipal Affairsand Housing 1998) shall conform to the significant threatpolicies and designated Great Lakes policies set out in thesource protection plans; the source protection plan ‘prevails’in the case of a conflict with official plans and zoning by-laws,although subject to ‘the provision that provides the greatestprotection to the quality and quantity of any water that is ormay be used as a source of drinking water prevails (Ministryof the Environment 2006, CWA Section 39). Therefore, whileno policies are in place yet, once the Source Protection Plan isapproved, it could restrict future land uses within the areas ofthe Intake Protection Zones.28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!