12.07.2015 Views

Operating Instructions - VEGACAP 67 with two-wire output - Insatech

Operating Instructions - VEGACAP 67 with two-wire output - Insatech

Operating Instructions - VEGACAP 67 with two-wire output - Insatech

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Connecting to power supply5.3 Wiring plans, single chamber housingHousing overview44412 3Fig. 8: Material versions, single chamber housing1 Plastic (not <strong>with</strong> dust-Ex)2 Aluminium3 Stainless steel4 Filter element for pressure compensation or blind stopper <strong>with</strong> version IP 66/IP 68, 1 barElectronics and connectioncompartment4132Fig. 9: Electronics and connection compartment1 DIL switch for measuring range selection2 Ground terminal3 Terminals4 Control lampWiring planFor connection to a signal conditioning instrument. The sensoris powered by the connected signal conditioning instrument.Further information is available in the "Technical data" in the"Supplement", Ex-technical data are available in the suppliedsafety information manual.18 <strong>VEGACAP</strong> <strong>67</strong> - <strong>with</strong> <strong>two</strong>-<strong>wire</strong> <strong>output</strong>31317-EN-060223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!