12.07.2015 Views

Jacobs & Thompson - Partners in Project Green

Jacobs & Thompson - Partners in Project Green

Jacobs & Thompson - Partners in Project Green

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CASE STUDYLight<strong>in</strong>g RetrofitIn addition to these projects, <strong>Jacobs</strong> &<strong>Thompson</strong> also implemented a light<strong>in</strong>gretrofit at its Toronto facility. Inside andoutside the plant, the company replaced 416T-12 fixtures with 165 T-8 and light reflectivePL Type fixtures. Before the replacement, thecomb<strong>in</strong>ed wattage for the facility’s fixtureswas 62,885 watts and the cost of runn<strong>in</strong>gthe fixtures was $5,695 per month. After theretrofit, the comb<strong>in</strong>ed wattage was 25,578watts and the operat<strong>in</strong>g cost was $2,475. Theretrofit thus resulted <strong>in</strong> a sav<strong>in</strong>gs of 37,307New T-8 light<strong>in</strong>g saves <strong>Jacobs</strong> & <strong>Thompson</strong> $3,220 watts and $3,220 per month. In addition to theper month <strong>in</strong> energy costssubstantial f<strong>in</strong>ancial sav<strong>in</strong>gs achieved throughthe light<strong>in</strong>g retrofit, the company also benefitsfrom a higher lumen output and better colour rendition, and significantly <strong>in</strong>creased light<strong>in</strong>glevels. The $60,000 project cost, which has a payback period of about 1.5 years, was reduced by<strong>in</strong>centives from Natural Resources Canada and Toronto Hydro. Staff labour also helped reducecosts.<strong>Project</strong> ChallengesAccord<strong>in</strong>g to Peter Mauti, <strong>Jacobs</strong> & <strong>Thompson</strong>’s Ma<strong>in</strong>tenance Manager, the energy retrofitprocess went smoothly and no significant challenges arose. “The key,” he says, “is to do yourhomework, plan ahead, and keep track of the entire project from start to f<strong>in</strong>ish.”MOVING FORWARDAs an environmentally consciouscompany, <strong>Jacobs</strong> & <strong>Thompson</strong>is always work<strong>in</strong>g hard to bean environmentally susta<strong>in</strong>ablefabrication partner. Be<strong>in</strong>g aresponsible corporate citizenhas been a top priority for thecompany when design<strong>in</strong>g its wasterecycl<strong>in</strong>g programs and energyconservation plans. The companyis pleased that its efforts to datehave resulted <strong>in</strong> measurableenergy and natural gas sav<strong>in</strong>gs,thereby reduc<strong>in</strong>g the company’soverall contribution to greenhouse gasemissions and its carbon footpr<strong>in</strong>t.<strong>Jacobs</strong> & <strong>Thompson</strong>’s yearly CO2 emissions have decl<strong>in</strong>eds<strong>in</strong>ce 2006Between 2002 and 2011, the company achieved an overall reduction of 31 per cent <strong>in</strong> its hydroconsumption and a 47 per cent reduction <strong>in</strong> its natural gas consumption. Yearly CO2 emissionss<strong>in</strong>ce 2006 have also gone down by 46 per cent (see graph). By 2011, due to the light<strong>in</strong>g retrofitand heat reclamation projects, <strong>Jacobs</strong> & <strong>Thompson</strong> was consum<strong>in</strong>g less hydro and natural gas


than it had <strong>in</strong> any of the years previously, s<strong>in</strong>ce it started record<strong>in</strong>g this data <strong>in</strong> 2002. Mov<strong>in</strong>gforward the company hopes to keep this momentum and improve its energy performance evenmore. Plans to f<strong>in</strong>alize the company’s Carbon Footpr<strong>in</strong>t Improvement Plan, <strong>in</strong>stall rooftop solarpanels at its Toronto facility <strong>in</strong> 2012, and reduce its waste disposal by 50 per cent by 2014 willcerta<strong>in</strong>ly move the company closer to its goal.PEARSON ECO-BUSINESS ZONECASE STUDYwww.partners<strong>in</strong>projectgreen.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!