- Page 1 and 2: Transportation ManagementCenterConc
- Page 3 and 4: Executive SummaryPart 1 Introductio
- Page 5: Agencies responsible for managing l
- Page 9 and 10: • The Systems• Operational Faci
- Page 11 and 12: WhatChallengesDo TMC’sFace?The mo
- Page 13 and 14: The concept of operation should doc
- Page 15 and 16: This section defines the types of t
- Page 17 and 18: Following notification, incidents a
- Page 19 and 20: Many fine examples of transit manag
- Page 21 and 22: System Control and DataAcquisitionS
- Page 23 and 24: The Contextof aConcept ofOperations
- Page 25: Where Does the Concept of Operation
- Page 28 and 29: Other Regional Impacts to Operation
- Page 31 and 32: An important element of jurisdictio
- Page 33 and 34: IntroductionThe concept of operatio
- Page 35 and 36: The concept of operation should als
- Page 37 and 38: At some point in the process, the r
- Page 39 and 40: Main> MBCommand-Based InterfaceMenu
- Page 41: Western MDTraffic OperationsCenterG
- Page 44 and 45: Field Device Examples• The TMC in
- Page 46 and 47: OperationalFacilityNeedsThere are m
- Page 48 and 49: Needs or Desires IdentifiedThe conc
- Page 50 and 51: The City of Los Angeles ATSAC Cente
- Page 52 and 53: At ATSAC, new hardware, devices, an
- Page 54 and 55: Less pleasant, although sometimes i
- Page 56 and 57:
Deciding Whether/How to Share Contr
- Page 58 and 59:
Caltrans and the California Highway
- Page 60 and 61:
een compiled during the shift. Such
- Page 62 and 63:
High level measures may include the
- Page 64 and 65:
Example OrganizationDOT District En
- Page 66 and 67:
Although ITE has established a reco
- Page 68 and 69:
Los Angeles’ ATSAC Traffic Operat
- Page 70 and 71:
Staff Cross-TrainingCross-training,
- Page 72 and 73:
are needed will conclude by identif
- Page 74 and 75:
How Process Improvements Are MadeSi
- Page 76 and 77:
The concept of operations deals wit
- Page 78 and 79:
This communication can take place i
- Page 80 and 81:
The potential cost of configuration
- Page 82 and 83:
• The beginning of a task- Change
- Page 84 and 85:
need to address, if possible, the c
- Page 86 and 87:
Process Improvement Maintenance, as
- Page 88 and 89:
The training material is typically
- Page 90 and 91:
identifying the core documents (inc
- Page 92 and 93:
OperationalProcurementandContractin
- Page 94 and 95:
communications, heating/ventilation
- Page 96 and 97:
• Consulting The TMC may find tha
- Page 98 and 99:
• Standard agency payment process
- Page 100 and 101:
Human Factors GuidelinesThe Georgia
- Page 102 and 103:
How Can IFind OutMore AboutConcepts
- Page 104 and 105:
References1 Booz·Allen & Hamilton
- Page 106 and 107:
25 Institute of Transportation Engi
- Page 108 and 109:
For further information, contact:Fe
- Page 110:
INTELLIGENT TRANSPORTATION SYSTEMSU