What is <strong>Columbus</strong> Doing Now?Completed numerous smaller projects toaddress local overflows.Completed $270 M in new headworks anda new 14-foot diameter tunnelProgram <strong>Management</strong> - $435 M4.5 mile, 20-foot CSO tunnel– Phase 1 $264.5 M bid, Phase 2 $75M est.Construction contracts alone exceed $1Billion for compliance