24<br />
Appendix 5<br />
48. MAUR shall ensure that environmental approvals required by Viet Nam , such as those<br />
from the Ministry of Natural Resources and Environment and other relevant agencies, are<br />
obtained on a timely manner. Copies of such approvals shall be submitted to ADB upon<br />
issuance.<br />
49. MAUR will ensure timely and satisfactory implementation of EMP provisions. MAUR<br />
shall ensure that all bidding documents and civil works contracts include the EMP and shall<br />
ensure compliance of contractors to the provisions of the EMP.<br />
50. The environmental assessment of Tranche 2 and subsequent tranches as well as<br />
projects, components and subprojects to be prepared after MFF approval shall be conducted<br />
consistent with ADB's SPS 2009 and the environmental assessment and review framework<br />
(EARF) agreed between MAUR and ADB.<br />
51. MAUR shall adequately supervise the construction works carried out by contractors to<br />
ensure compliance with the monitoring and mitigation measures set forth in the EMP. MAUR<br />
shall ensure that consultants engaged for construction supervision monitor closely the<br />
compliance by the contractors with the EMP. Semi-annual reports on implementation of the<br />
EMP will be submitted by MAUR to ADB on a timely basis.<br />
52. Prior to commencement of site works, MAUR shall establish an environmental grievance<br />
redress mechanism, acceptable to ADB, to receive and facilitate resolution of affected peoples'<br />
concerns, complaints, and grievances about the Project's environmental performance. MAUR<br />
shall make public the existence of this grievance redress mechanism through public awareness<br />
campaigns; review and address environmental grievances of stakeholders in relation to the<br />
Program, any of the service providers, or any person responsible for carrying out any aspect of<br />
the Program; and proactively and constructively respond to such grievances.<br />
53. For Tranche 2 as well as any subsequent tranches or components likely to have<br />
significant environmental impacts (Category A), MAUR shall engage and retain qualified and<br />
experienced external expert(s) to review and verify the environmental monitoring information<br />
provided by MAUR to ADB with regard to EMP implementation. Such expert shall not be<br />
involved in day-to-day project implementation or supervision nor an employee of any firm which<br />
has been contracted for the construction phase of the Project. The external expert shall<br />
undertake monitoring annually and shall submit corresponding report to HCMC PC and ADB.<br />
B. Involuntary Resettlement<br />
54. Viet Nam will ensure that the entire Program is carried out in accordance with Viet<br />
Nam’s applicable laws and regulations, ADB’s Safeguard Policy Statement (2009), and the<br />
agreed Resettlement Framework (RF). In case of discrepancies between Viet Nam ’s laws,<br />
regulations, and procedures, and ADB’s policies, ADB policies will prevail.<br />
55. MAUR will ensure that the preparation of the resettlement plan for the mainline will be in<br />
accordance with the agreed RF. Following detailed design, the RP will be prepared through the<br />
conduct of census and detailed measurement survey (DMS) to determine the actual impacts on<br />
land and assets of each household. Consultation and disclosure activities will be undertaken. A<br />
qualified appraiser will be engaged to carry out replacement cost survey for land and non-land<br />
assets. The RP will be submitted to ADB for review and concurrence. Land acquisition,