26 Appendix 6<br />
SCHEDULE 6<br />
UNDERTAKINGS<br />
63. Viet Nam will, and will cause HCMC PC to; (i) ensure timely implementation of the<br />
<strong>Investment</strong> Program, including executing the implementation arrangements set out in Schedule<br />
3 to this FFA and monitoring and evaluating implementation based on the Design and<br />
Monitoring Framework set out in Schedule 2 to this FFA; (ii) ensure that all projects financed<br />
under the Facility are selected and approved in accordance with the criteria and procedure set<br />
out in Schedule 4 to this FFA; and (iii) ensure all projects financed under the Facility are<br />
developed, implemented and maintained in accordance with the safeguard requirements set out<br />
in Schedule 5 to this FFA.<br />
64. HCMC PC will comply with ADB’s relevant policies and procedures, including those on<br />
procurement, disbursement, safeguards, social dimensions, gender, governance, and<br />
anticorruption measures, in the preparation and implementation of investments. Breach of<br />
undertakings will trigger ADB’s right to hold back financing, and to suspend or terminate the<br />
Facility.<br />
A. Budget Resources<br />
65. HCMC PC will ensure that funding is available for regular maintenance and<br />
implementation, as required, of the MRT constructed under the <strong>Investment</strong> Program.<br />
Furthermore, HCMC PC will ensure that annual operational and maintenance plans are<br />
prepared for the MRT2 on the basis of the agreed-upon maintenance standards, passenger<br />
volumes, and assessment of needs.<br />
66. Viet Nam will ensure that HCMC PC makes available all counterpart funds required for<br />
timely and effective implementation of the <strong>Investment</strong> Program, and will ensure that necessary<br />
resources thus required are released in a timely manner.<br />
B. Construction<br />
67. Viet Nam through HCMC PC will ensure that the Program is carried out in accordance<br />
with the applicable technical specifications and design, and that the construction supervision,<br />
quality control, and project management of the Program are performed in accordance with<br />
applicable standards and best international practices. Viet Nam will ensure that the works<br />
improved under the Program are maintained in accordance with applicable standards and best<br />
international practices.<br />
68. HCMC PC will ensure that civil works contracts will include appropriate clauses requiring<br />
contractors to allow their workers to attend planned campaigns on HIV/AIDS and human<br />
trafficking prevention during construction and will maintain adequate sanitation and working<br />
conditions.<br />
C. <strong>Urban</strong> Transport Sector Policies<br />
69. HCMC PC will submit quarterly project progress reports and progress reports to ADB<br />
periodically on the <strong>Urban</strong> Transport Sector Policies (UTSP) and consult with ADB on further<br />
urban transport sector policy measures, if and when available.<br />
70. Viet Nam will keep ADB informed of key transport sector and urban transport subsector