12.07.2015 Views

1.5 kilometers Dr. Chris Hanning (UK) - Cape Cod Commission

1.5 kilometers Dr. Chris Hanning (UK) - Cape Cod Commission

1.5 kilometers Dr. Chris Hanning (UK) - Cape Cod Commission

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(Continued)Comparison of Zoning ProvisionsAcoustical SetbacksG. Wareham, MA: the developer of Bog Wind just reduced from 6 turbines to 2, and reducedthe size of the remaining 2 turbines to a size that provides a setback from residences of 10times rotor diameter.“We will be revising our proposed project based on listening to the various presentationsmade by Barry Cosgrove and his group at the Wareham ZBA in September, November,and March. We also based these revisions on lessons we learned at the various Wind Wise<strong>Cape</strong> <strong>Cod</strong> information sessions held at <strong>Cape</strong> <strong>Cod</strong> Community College throughout thispast six months, as well as hearing Mark and Annie Cool, Neil and Elizabeth Anderson, Mr.Funfar, and others speak about their experiences with turbines recently constructed inFalmouth, MA”[letter from Bog Wind to the Wareham Zoning Board of Appeals dated April 12, 2011]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!