12.07.2015 Views

ska phase 1 system requirements specification - The Square ...

ska phase 1 system requirements specification - The Square ...

ska phase 1 system requirements specification - The Square ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WP2‐005.030.000‐SRS‐002Revision : B3.4.3 Survey ‘On‐Sky’ timeIdent Requirement Applicability Parent VerificationSYS_REQ_1420<strong>The</strong> SKA Phase 1 shall be designedso that a major survey can becompleted in 2 years of “on‐sky”observation time.[1]Paragraph1.4.1Analysis3.4.4 Deep Field Integration TimeIdent Requirement Applicability Parent VerificationSYS_REQ_1430<strong>The</strong> SKA Phase 1 shall be designedso that a deep field can becompleted in 1000 hr ofintegration time.Mandatory [1]Paragraph1.4.2Analysis3.5 Baseline <strong>requirements</strong>Ident Requirement Applicability Parent VerificationSYS_REQ_1510Baseline. <strong>The</strong> SKA 1 minimumbaseline requirement is:200 km for the range 70 to 240MHzMandatory [1] Table 2.2Para 2.4.3To be added:‐Instantaneous imaging capability‐Required UV coverage in synthesis mode. How much time you require to fill in the full UV plane‐Sensitivity <strong>requirements</strong> as a function of elevation. Say 50% sensitivity for elevations down to xdegrees‐Subarray <strong>requirements</strong>‐Latency <strong>requirements</strong>‐Minimal frequency resolution required‐Linearity <strong>requirements</strong>‐Passband <strong>phase</strong> stability‐Required clock/timing accuracy2011‐02‐14 Page 17 of 58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!